Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Speed, Kansas (KS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 95ft / 29.0mTotal length
  • $613,000Total costs
  • 3,520Total average daily traffic
  • 487Total average daily truck traffic
  • 4,074Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Speed
  • No street view available for this location

New bridges in Speed, KS - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 11940-1949
  • 31950-1959
  • 41970-1979
  • 11980-1989
  • 31990-1999
  • 12000-2009
Average Bridge Truck Traffic in Speed, KS
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 71.4%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 57.1%Good
  • 14.3%Fair
  • 28.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.7%Very good
  • 46.7%Good
  • 40.0%Satisfactory
  • 6.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 12.5%Very good
  • 37.5%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 74017,  Location: 1.0S OF SPEED (Lat: 39.656311,  Lng: -99.421669),  Route carried "on" structure: County highway 534,  Year Built: 1971,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 180 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 190 (year 2040),  Design Load: H 20,  Features Intersected: TRIB. N. FORK SOLOMON,  Facility Carried by Structure: E 500 Rd (170)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 9.720,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 74018,  Location: 0.8S OF SPEED (Lat: 39.661419,  Lng: -99.421711),  Route carried "on" structure: County highway 534,  Year Built: 1971,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 180 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 190 (year 2040),  Design Load: H 20,  Features Intersected: TRIB. N. FORK SOLOMON,  Facility Carried by Structure: E 500 Rd (180)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 10.284,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 74019,  Location: 0.5S OF SPEED (Lat: 39.665869,  Lng: -99.421739),  Route carried "on" structure: County highway 534,  Year Built: 1971,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 180 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 190 (year 2040),  Design Load: H 20,  Features Intersected: TRIB. N. FORK SOLOMON,  Facility Carried by Structure: E 500 Rd (190)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 10.767,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 7402,  Location: 0.2S OF SPEED (Lat: 39.670000,  Lng: -99.421806),  Route carried "on" structure: County highway 534,  Year Built: 1971,  Status: Posted for load,  Structure Length: 10.33m (33.89ft),  Average Daily Traffic: 180 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 120 (year 2040),  Design Load: H 15,  Features Intersected: NORTH FORK SOLOMON RIVER
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 11.104,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 20.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 74021,  Location: 1.0N OF SPEED (Lat: 39.687772,  Lng: -99.421878),  Route carried "on" structure: County highway 534,  Year Built: 1939,  Status: Posted for load,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 355 (year 2014),  Truck Traffic: 25%,  Average Future Daily Traffic: 350 (year 2040),  Features Intersected: ASH CREEK,  Facility Carried by Structure: W 500 Rd (210)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 13.181,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $60,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $90,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 74028,  Location: 4.0N 5.5E OF LOGAN (Lat: 39.726917,  Lng: -99.457986),  Route carried "on" structure: County highway 849,  Year Built: 2004,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 60 (year 2014),  Average Future Daily Traffic: 60 (year 2040),  Design Load: HS 20,  Features Intersected: ASH CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 14.404,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 74059570348,  Location: 1.5S 1.0W OF SPEED (Lat: 39.654297,  Lng: -99.444506),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 20 (year 2014),  Average Future Daily Traffic: 30 (year 2040),  Design Load: H 20,  Features Intersected: TRIB. N. FORK SOLOMON,  Facility Carried by Structure: W. YANKEE RD (86)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.7m (28.5ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $80,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 74059790348,  Location: 1.5S OF SPEED (Lat: 39.654236,  Lng: -99.421886),  Route carried "on" structure: County highway ,  Year Built: 1955,  Status: Posted for load,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 25 (year 2014),  Average Future Daily Traffic: 30 (year 2040),  Features Intersected: TRIB. N. FORK SOLOMON,  Facility Carried by Structure: W. YANKEE RD (97)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 17.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Other Special Inspection Date: November 2019,  Bridge Improvement Cost: $65,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $98,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 740599803445,  Location: 0.5E OF SPEED (Lat: 39.676017,  Lng: -99.407186),  Route carried "on" structure: County highway ,  Year Built: 1945,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 15 (year 2014),  Average Future Daily Traffic: 20 (year 2040),  Features Intersected: ASH CREEK,  Facility Carried by Structure: W WARRIOR LN (100)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.4m (27.6ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 12.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 7.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $240,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 740601003461,  Location: 0.5S 1.0E OF SPEED (Lat: 39.667372,  Lng: -99.402892),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 15 (year 2014),  Average Future Daily Traffic: 20 (year 2040),  Design Load: H 15,  Features Intersected: ASH CREEK,  Facility Carried by Structure: W. 400 RD (103)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 25.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Other Special Inspection Date: November 2019,  Bridge Improvement Cost: $70,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $105,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 740605003447,  Location: 3.0E OF SPEED (Lat: 39.671844,  Lng: -99.365600),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 30 (year 2014),  Average Future Daily Traffic: 35 (year 2040),  Design Load: HS 20,  Features Intersected: N. FORK SOLOMON RIVER,  Facility Carried by Structure: W. 200 RD. (114)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 999900900740351,  Location: 9.06MI E NORTON CO LINE (Lat: 39.677500,  Lng: -99.460833),  Route carried "on" structure: State highway 9,  Year Built: 1951,  Status: Open,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 630 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 784 (year 2041),  Design Load: H 20,  Features Intersected: N F SOLOMON R DRAIN
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 14.581,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.17m (10.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 999900900740371,  Location: 12.18 MI E NORTON COLN (Lat: 39.683333,  Lng: -99.408889),  Route carried "on" structure: State highway 9,  Year Built: 1950,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 550 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 685 (year 2041),  Design Load: H 20,  Features Intersected: ASH CREEK DRAINAGE
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 19.597,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.25m (10.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 999900900740381,  Location: 13.70 MI E NORTON COLN (Lat: 39.683333,  Lng: -99.380556),  Route carried "on" structure: State highway 9,  Year Built: 1927,  Year Reconstructed: 1951,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 550 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 685 (year 2041),  Design Load: H 15,  Features Intersected: N F SOLOMON R DRAIN
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 22.043,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 999900900740461,  Location: 11.87 MI E NORTON COLN (Lat: 39.682778,  Lng: -99.414722),  Route carried "on" structure: State highway 9,  Year Built: 1993,  Status: Open,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 550 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 685 (year 2041),  Design Load: HS 20,  Features Intersected: ASH CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 19.092,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 10.25m (33.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Speed, Kansas (KS) on our hugely popular Kansas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.