Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Summerville, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 26Number of bridges
  • 207ft / 63.2mTotal length
  • $13,457,000Total costs
  • 82,084Total average daily traffic
  • 3,056Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Summerville
  • No street view available for this location

New bridges in Summerville, GA - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 21940-1949
  • 61950-1959
  • 11960-1969
  • 61980-1989
  • 41990-1999
  • 22000-2009
Reconstructed bridges in Summerville, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 41980-1989
Average Bridge Daily Traffic in Summerville, GA
Average Bridge Truck Traffic in Summerville, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 50.0%Good
  • 25.0%Satisfactory
  • 16.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 25.0%Fair
  • 8.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 58.3%Good
  • 25.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 48.0%Very good
  • 16.0%Good
  • 20.0%Satisfactory
  • 16.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 84.6%Good
  • 15.4%Satisfactory
Find on map >>   Show street view

Structure Number: 55005,  Location: 4 MI S OF ALMA (Lat: 31.476492,  Lng: -82.498986),  Route carried "on" structure: County highway 124,  Year Built: 1980,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 15,  Features Intersected: LITTLE HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $821,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 550002,  Location: 1 MI SE OF SUMMERVILLE (Lat: 34.467878,  Lng: -85.335119),  Route carried "on" structure: US 27,  Year Built: 1930,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 12.07m (39.60ft),  Average Daily Traffic: 9,540 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,310 (year 2031),  Design Load: H 15,  Features Intersected: CHATTOOGA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $1,969,000,  Roadway Improvement Cost: $197,000,  Total Project Cost: $2,954,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 550004,  Location: 1.5 MI NE OF SUMMERVILLE (Lat: 34.499619,  Lng: -85.331500),  Route carried "on" structure: US 27,  Year Built: 1952,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 16,350 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 24,525 (year 2031),  Design Load: H 15,  Features Intersected: HENRY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $341,000
Find on map >>   Show street view

Structure Number: 550011,  Location: 3 MI W OF SUMMERVILLE (Lat: 34.473408,  Lng: -85.400758),  Route carried "on" structure: State highway 48,  Year Built: 1939,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 4,510 (year 2011),  Truck Traffic: 11%,  Average Future Daily Traffic: 6,765 (year 2031),  Design Load: H 15,  Features Intersected: RACCOON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 550018,  Location: IN SE BERRYTON (Lat: 34.440439,  Lng: -85.379450),  Route carried "on" structure: State highway 114,  Year Built: 1941,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 4,500 (year 2011),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,750 (year 2031),  Design Load: H 15,  Features Intersected: RACCOON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $746,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $1,119,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 550021,  Location: 5 MI NW OF SUMMERVILLE (Lat: 34.543489,  Lng: -85.385358),  Route carried "on" structure: County highway 817,  Year Built: 1958,  Status: Posted for load,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 1,110 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,665 (year 2032),  Design Load: H 15,  Features Intersected: TELOGA CREEK,  Facility Carried by Structure: TRION- TELOGA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 10.94m (35.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $867,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 550042,  Location: IN NE BERRYTON (Lat: 34.461228,  Lng: -85.379258),  Route carried "on" structure: County highway 98,  Year Built: 1952,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Features Intersected: RACCOON CREEK TRIB.,  Facility Carried by Structure: BACK BERRYTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 41.00m (134.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $98,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $147,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 550043,  Location: IN NW SUMMERVILLE (Lat: 34.488808,  Lng: -85.351989),  Route carried "on" structure: City street 6150,  Year Built: 1980,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 3,800 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,700 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TOWN BRANCH,  Facility Carried by Structure: N. W. CONGRESS ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $141,000
Find on map >>   Show street view

Structure Number: 550044,  Location: IN SUMMERVILLE (Lat: 34.479969,  Lng: -85.346258),  Route carried "on" structure: City street 6150,  Year Built: 1930,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 2,150 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,225 (year 2031),  Design Load: H 15,  Features Intersected: TOWN BRANCH,  Facility Carried by Structure: WASHINGTON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.22m (23.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $141,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 550045,  Location: IN SOUTH SUMMERVILLE (Lat: 34.473689,  Lng: -85.349408),  Route carried "on" structure: City street 556,  Year Built: 1987,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 1,110 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,665 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TOWN BRANCH,  Facility Carried by Structure: BELLAH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $199,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $299,000
Find on map >>   Show street view

Structure Number: 550046,  Location: IN SW SUMMERVILLE (Lat: 34.470258,  Lng: -85.358528),  Route carried "on" structure: City street 96,  Year Built: 1988,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 620 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 930 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TOWN BRANCH TRIB.,  Facility Carried by Structure: LYERLY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000
Find on map >>   Show street view

Structure Number: 550048,  Location: S SUMMERVILLE @ SR 114 (Lat: 34.470197,  Lng: -85.354228),  Route carried "on" structure: State highway 100,  Year Built: 1954,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,440 (year 2011),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,160 (year 2031),  Design Load: H 15,  Features Intersected: TOWN BRANCH TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 550049,  Location: S SUMMERVILLE @ SR 100 (Lat: 34.470269,  Lng: -85.354697),  Route carried "on" structure: State highway 114,  Year Built: 1941,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 5,260 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,890 (year 2031),  Design Load: H 15,  Features Intersected: TOWN BRANCH TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $208,000
Find on map >>   Show street view

Structure Number: 55005,  Location: IN SUMMERVILLE (Lat: 34.482128,  Lng: -85.346900),  Route carried "on" structure: US 27,  Year Built: 1986,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 15,610 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 23,415 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TOWN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 84.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $341,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $511,000
Find on map >>   Show street view

Structure Number: 550051,  Location: IN WEST SUMMERVILLE (Lat: 34.473219,  Lng: -85.363489),  Route carried "on" structure: State highway 48,  Year Built: 1938,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 6,170 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 9,255 (year 2031),  Design Load: H 15,  Features Intersected: TOWN BRANCH TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $172,000
Find on map >>   Show street view

Structure Number: 550052,  Location: 1.5 MI E OF BERRYTON (Lat: 34.444547,  Lng: -85.362489),  Route carried "on" structure: State highway 100,  Year Built: 1990,  Status: Open,  Structure Length: 10.55m (34.61ft),  Average Daily Traffic: 3,110 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,665 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CHATTOOGA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 5,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $1,352,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,028,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 555009,  Location: 2 MI SE OF SUMMERVILLE (Lat: 34.464869,  Lng: -85.329689),  Route carried "on" structure: County highway 12,  Year Built: 1958,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 340 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 510 (year 2031),  Features Intersected: LOWE BRANCH,  Facility Carried by Structure: MARBLE SPRINGS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 41.15m (135.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 55501,  Location: 3 MI E OF BERRYTON (Lat: 34.440839,  Lng: -85.346658),  Route carried "on" structure: County highway 13,  Year Built: 1991,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 70 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 105 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CHATTOOGA RIVER TRIB,  Facility Carried by Structure: WILDLIFE LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 555052,  Location: IN SLOPPY FLOYD ST PARK (Lat: 34.438539,  Lng: -85.338269),  Route carried "on" structure: Spur County highway 815,  Year Built: 1969,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 170 (year 2011),  Truck Traffic: 14%,  Average Future Daily Traffic: 255 (year 2031),  Design Load: H 15,  Features Intersected: CHATTOOGA RIVER TRIB,  Facility Carried by Structure: SLOPPY FLOYD LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 2.1m (6.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $379,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $568,000
Find on map >>   Show street view

Structure Number: 555066,  Location: IN SUMMERVILLE (Lat: 34.481528,  Lng: -85.345989),  Route carried "on" structure: City street 577,  Year Built: 1994,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 1,070 (year 2011),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,605 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TOWN BRANCH,  Facility Carried by Structure: FIRST AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 555071,  Location: IN SW SUMMERVILLE (Lat: 34.470369,  Lng: -85.357500),  Route carried "on" structure: City street 552,  Year Built: 1987,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 190 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 285 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TOWN BRANCH TRIB,  Facility Carried by Structure: CURRANT STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 555072,  Location: 2 MI W OF SUMMERVILLE (Lat: 34.479939,  Lng: -85.381728),  Route carried "on" structure: County highway 362,  Year Built: 1959,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 104 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 156 (year 2031),  Features Intersected: RACCOON CREEK TRIB,  Facility Carried by Structure: TUCKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 21.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 555074,  Location: 3 MI N OF BERRYTON (Lat: 34.495428,  Lng: -85.396247),  Route carried "on" structure: County highway 318,  Year Built: 1991,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 280 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 420 (year 2031),  Design Load: H 15,  Features Intersected: RACCOON CREEK TRIB,  Facility Carried by Structure: HAIR LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 555088,  Location: 5.1 MI W OF TRION (Lat: 34.536628,  Lng: -85.393378),  Route carried "on" structure: County highway 259,  Year Built: 2002,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 30 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 45 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TELOGA CREEK,  Facility Carried by Structure: KEEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $274,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $410,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 555094,  Location: CENTER OF BERRYTON (Lat: 34.453289,  Lng: -85.388450),  Route carried "on" structure: County highway 817,  Year Built: 2008,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 750 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,125 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: RACCOON CREEK,  Facility Carried by Structure: BACK BERRYTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $438,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $656,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 550047,  Location: IN SW SUMMERVILLE (Lat: 34.474119,  Lng: -85.354189),  Route carried "under" structure: City street 583,  Structure Length: 0. m,  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Features Intersected: CS 583 OLD MILL ROAD,  Facility Carried by Structure: SOU. RR. (719533B)
Minimum Vertical Clearance: 2.20m (7.22ft),  Kilometerpoint: 0.000,  Length of Maximum Span: 0.0m

Discuss Summerville, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.