  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 102ft / 31.2mTotal length
  • $11,886,000Total costs
  • 21,280Total average daily traffic
  • 4,910Total average daily truck traffic
  • 27,784Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sweet Water
  • No street view available for this location

New bridges in Sweet Water, AL - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 91980-1989
  • 41990-1999
Average Bridge Truck Traffic in Sweet Water, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 66.7%Good
  • 33.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 66.7%Good
  • 33.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 64.3%Good
  • 35.7%Satisfactory
Find on map >>   Show street view

Structure Number: 3406,  Location: 4.2 MI N CLARKECO L (Lat: 32.048236,  Lng: -87.875211),  Route carried "on" structure: County highway 7,  Year Built: 1949,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 440 (year 1988),  Truck Traffic: 30%,  Average Future Daily Traffic: 620 (year 2040),  Design Load: H 15,  Features Intersected: HORSE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.199,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.11m (33.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,663,000,  Roadway Improvement Cost: $166,000,  Total Project Cost: $1,829,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13254,  Location: 4.4 MI. E. OF NANAFALIA (Lat: 32.086903,  Lng: -87.922072),  Route carried "on" structure: State highway 10,  Year Built: 1984,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 2,990 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 3,894 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.095,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.66m (5.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $490,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $539,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13256,  Location: 2.6 MI. W. OF SWEETWATER (Lat: 32.090100,  Lng: -87.890033),  Route carried "on" structure: State highway 10,  Year Built: 1984,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 2,990 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 3,894 (year 2033),  Design Load: HS 20,  Features Intersected: HODGENS CREEK REL.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.103,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.66m (5.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $615,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $677,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13257,  Location: 2.5 MI. W. OF SWEETWATER (Lat: 32.090483,  Lng: -87.888494),  Route carried "on" structure: State highway 10,  Year Built: 1984,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,990 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 3,894 (year 2033),  Design Load: HS 20,  Features Intersected: HODGEN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.264,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $611,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $672,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13258,  Location: .9 MI. W. OF SWEETWATER (Lat: 32.093839,  Lng: -87.878883),  Route carried "on" structure: State highway 10,  Year Built: 1984,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,990 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 3,894 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.310,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $539,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $593,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13259,  Location: SWEETWATER (Lat: 32.088361,  Lng: -87.859583),  Route carried "on" structure: State highway 10,  Year Built: 1984,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 2,990 (year 2013),  Truck Traffic: 25%,  Average Future Daily Traffic: 3,894 (year 2033),  Design Load: HS 20,  Features Intersected: SWEETWATER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 65.211,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.29m (23.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,150,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $2,365,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13261,  Location: 2.2 MI. W. OF DIXONS MILL (Lat: 32.061833,  Lng: -87.820886),  Route carried "on" structure: State highway 10,  Year Built: 1984,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 2,990 (year 2013),  Truck Traffic: 24%,  Average Future Daily Traffic: 3,894 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 70.039,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.42m (4.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $690,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $759,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13582,  Location: 1.1 MI E OF EXMOOR (Lat: 32.056217,  Lng: -87.859800),  Route carried "on" structure: County highway 6,  Year Built: 1985,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 150 (year 1988),  Truck Traffic: 20%,  Average Future Daily Traffic: 140 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH OF MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $503,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $553,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14192,  Location: 2.1 MI W EXMOOR (Lat: 32.068106,  Lng: -87.901931),  Route carried "on" structure: County highway 6,  Year Built: 1987,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 400 (year 1988),  Truck Traffic: 20%,  Average Future Daily Traffic: 210 (year 2040),  Design Load: HS 20,  Features Intersected: HODGENS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.600,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.68m (15.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $834,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $917,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14507,  Location: 2.3 MI W OF EXMOOR (Lat: 32.071892,  Lng: -87.907044),  Route carried "on" structure: County highway 6,  Year Built: 1988,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 150 (year 1988),  Truck Traffic: 20%,  Average Future Daily Traffic: 210 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH OF HODGENS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.249,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $504,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $554,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15606,  Location: 1.1 MI E SWEETWATER (Lat: 32.101892,  Lng: -87.859811),  Route carried "on" structure: County highway 16,  Year Built: 1992,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 620 (year 1991),  Truck Traffic: 30%,  Average Future Daily Traffic: 920 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH SWEETWATER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.099,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $342,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $376,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15607,  Location: 1.1 MI E SWEETWATER (Lat: 32.107042,  Lng: -87.842528),  Route carried "on" structure: County highway 16,  Year Built: 1992,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 620 (year 1991),  Truck Traffic: 30%,  Average Future Daily Traffic: 920 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH SWEETWATER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.999,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $591,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $650,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16486,  Location: 1.10 MI NE AL 10 (Lat: 32.082336,  Lng: -87.823956),  Route carried "on" structure: County highway 29,  Year Built: 1995,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 150 (year 1995),  Truck Traffic: 20%,  Average Future Daily Traffic: 200 (year 2041),  Design Load: H 10,  Features Intersected: SWEETWATER CRK BNCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $616,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $678,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17303,  Location: 7.25 MI. N CLARK CO. LINE (Lat: 32.090906,  Lng: -87.872053),  Route carried "on" structure: County highway 7,  Year Built: 1998,  Status: Open,  Structure Length: 1.97m (6.46ft),  Average Daily Traffic: 810 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,200 (year 2042),  Design Load: HS 20,  Features Intersected: SWEETWATER CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 11.666,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.8m (15.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 46.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.71m (8.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $658,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $724,000 ( Estimate for 2022)