Bridge Statistics for Verdigris, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 453ft / 138mTotal length
  • $35,125,000Total costs
  • 265,225Total average daily traffic
  • 81,806Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Verdigris
  • No street view available for this location

New bridges in Verdigris, OK - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 111950-1959
  • 41970-1979
  • 42000-2009
Reconstructed bridges in Verdigris, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 11990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Verdigris, OK
Average Bridge Truck Traffic in Verdigris, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 69.2%Good
  • 23.1%Satisfactory
  • 7.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.4%Excellent
  • 23.1%Very good
  • 30.8%Good
  • 7.7%Satisfactory
  • 23.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 23.1%Very good
  • 30.8%Good
  • 30.8%Satisfactory
  • 15.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Excellent
  • 45.5%Very good
  • 27.3%Good
  • 9.1%Satisfactory
  • 9.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 8245,  Location: 0.8 MI E OF I-44 (Lat: 36.221386,  Lng: -95.672786),  Route carried "on" structure: County highway N4120,  Year Built: 1940,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 16.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $84,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13573,  Location: T.P. NO 07.80 (Lat: 36.246253,  Lng: -95.657672),  Route carried "on" structure: Interstate 44,  Year Built: 1956,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 23,500 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 37,600 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.908,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 34 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 41.8m (137.1ft),  Out-to-Out Width: 42.4m (139.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.28m (10.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13989,  Location: 4.7 MI.NE OF TP GATE (Lat: 36.215617,  Lng: -95.692350),  Route carried "on" structure: Interstate 44,  Year Built: 1958,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 26,200 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 41,920 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.562,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 51.2m (168.0ft),  Out-to-Out Width: 51.8m (169.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 14129,  Location: 6.76 MI.NE OF TP GATE (Lat: 36.233611,  Lng: -95.670833),  Route carried "on" structure: County highway E0540,  Year Built: 1958,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: H 15,  Features Intersected: WILL ROGERS TP I-44 UND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.586,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $587,000,  Roadway Improvement Cost: $881,000,  Total Project Cost: $1,683,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 14145,  Location: 8.14 MI.NE OF FP GATE (Lat: 36.248889,  Lng: -95.654722),  Route carried "on" structure: County highway E0530,  Year Built: 1958,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: H 15,  Features Intersected: WILL ROGERS TP I-44 UND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.837,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.43m (17.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $679,000,  Roadway Improvement Cost: $1,019,000,  Total Project Cost: $1,943,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 14209,  Location: 4.2 MI.NE OF TP GATE (Lat: 36.209664,  Lng: -95.699933),  Route carried "on" structure: Interstate 44,  Year Built: 1958,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 24.48m (80.31ft),  Average Daily Traffic: 26,200 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 41,920 (year 2040),  Design Load: HS 20,  Features Intersected: MOSSY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.758,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 16,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.48m (80.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $3,059,000,  Roadway Improvement Cost: $2,500,000,  Total Project Cost: $6,322,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1421,  Location: 4.0 MI NE OF T P GATE (Lat: 36.202669,  Lng: -95.708408),  Route carried "on" structure: Interstate 44,  Year Built: 1958,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 32.77m (107.51ft),  Average Daily Traffic: 13,100 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 20,960 (year 2040),  Design Load: HS 20,  Features Intersected: VERDIGRIS RIV &ACCESS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.805,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 10 degrees,  Navigation Control: Yes ( Vertical Clearance: 16.7m (54.8ft), Horizontal Clearance: 62.4m (204.7ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 2,  Length of Maximum Span: 64.0m (210.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 32.77m (107.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,522,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $4,297,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14211,  Location: 4.0 MI NE OF T P GATE (Lat: 36.202928,  Lng: -95.708728),  Route carried "on" structure: Interstate 44,  Year Built: 1958,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 32.77m (107.51ft),  Average Daily Traffic: 13,650 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 21,840 (year 2040),  Design Load: HS 20,  Features Intersected: VERDIGRIS RIV & ACCESS R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.805,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 2,  Length of Maximum Span: 64.0m (210.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 32.77m (107.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,522,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $4,297,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18112,  Location: 5.9 MI E TULSA C/L (Lat: 36.249400,  Lng: -95.727744),  Route carried "on" structure: State highway 266,  Year Built: 1971,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 7.67m (25.16ft),  Average Daily Traffic: 8,900 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 14,240 (year 2040),  Design Load: HS 20,  Features Intersected: VERDIGRIS RIVER O'FLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.075,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.2m (46.6ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.1m (62.7ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.12m (33.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,405,000,  Roadway Improvement Cost: $2,318,000,  Total Project Cost: $3,933,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18131,  Location: JCT SH 66 & SH 266 (Lat: 36.245556,  Lng: -95.672222),  Route carried "on" structure: State highway 266,  Year Built: 1971,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 8,700 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 13,920 (year 2040),  Design Load: HS 20,  Features Intersected: S.H. 66 & R.R. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.111,  Lanes on structure: 4,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.07m (39.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,485,000,  Roadway Improvement Cost: $2,450,000,  Total Project Cost: $4,157,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19611,  Location: NORTH EDGE DRUMRIGHT (Lat: 36.002828,  Lng: -96.594136),  Route carried "on" structure: State highway 99,  Year Built: 1979,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 2,800 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,480 (year 2040),  Design Load: HS 20,  Features Intersected: TIGER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.77m (25.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $644,000,  Roadway Improvement Cost: $1,063,000,  Total Project Cost: $1,805,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 26856,  Location: SH 266/WILL ROGERS TP JCT (Lat: 36.240031,  Lng: -95.664867),  Route carried "on" structure: State highway 266,  Year Built: 2003,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 6,600 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 10,560 (year 2040),  Design Load: HL 93,  Features Intersected: WILL ROGERS TP I-44 UND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.998,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,196,000,  Roadway Improvement Cost: $1,974,000,  Total Project Cost: $3,350,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27379,  Location: .2E OF I-44 (Lat: 36.249369,  Lng: -95.651717),  Route carried "on" structure: County highway E0530,  Year Built: 2002,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 700 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,120 (year 2040),  Design Load: HS 20,  Features Intersected: WIDOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $526,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 28068,  Location: 3.5S 2W JCT SH20/I-44 (Lat: 36.256047,  Lng: -95.614894),  Route carried "on" structure: County highway N4150,  Year Built: 1955,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 75 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 120 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 8.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 9.90m (32.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $80,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28418,  Location: 4.9 MI. N. JCT. I-44 (Lat: 36.221583,  Lng: -95.711025),  Route carried "on" structure: State highway 66,  Year Built: 2008,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 8,600 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,760 (year 2040),  Design Load: HL 93,  Features Intersected: MOSSEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.916,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 55.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $586,000,  Roadway Improvement Cost: $967,000,  Total Project Cost: $1,642,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14129,  Location: 6.76 MI.NE OF TP GATE (Lat: 36.233611,  Lng: -95.670833),  Route carried "under" structure: Interstate 44,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 26,200 (year 2020),  Truck Traffic: 36%,  Features Intersected: WILL ROGERS TP I-44 UND,  Facility Carried by Structure: CO. RD. E0540
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 10.298,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 1414,  Location: 5.48 MI NE OF TP GATE (Lat: 36.220278,  Lng: -95.686667),  Route carried "under" structure: Interstate 44,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 26,200 (year 2020),  Truck Traffic: 36%,  Features Intersected: WILL ROGERS TP I-44 UND,  Facility Carried by Structure: CO. RD. E0550
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 8.206,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 14145,  Location: 8.14 MI.NE OF FP GATE (Lat: 36.248889,  Lng: -95.654722),  Route carried "under" structure: Interstate 44,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 23,500 (year 2020),  Truck Traffic: 36%,  Features Intersected: WILL ROGERS TP I-44 UND,  Facility Carried by Structure: CO. RD. E0530
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 12.550,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 18131,  Location: JCT SH 66 & SH 266 (Lat: 36.245556,  Lng: -95.672222),  Route carried "under" structure: State highway 66,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 16,700 (year 2020),  Truck Traffic: 15%,  Features Intersected: S.H. 66 & R.R. UNDER
Minimum Vertical Clearance: 6.35m (20.83ft),  Kilometerpoint: 12.294,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 26856,  Location: SH 266/WILL ROGERS TP JCT (Lat: 36.240031,  Lng: -95.664867),  Route carried "under" structure: Interstate 44,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 23,500 (year 2020),  Truck Traffic: 36%,  Features Intersected: WILL ROGERS TP I-44 UND,  Facility Carried by Structure: S.H. 266
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 11.264,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)