  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 226ft / 69.2mTotal length
  • $13,688,000Total costs
  • 103,598Total average daily traffic
  • 11,196Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Weathersfield
  • No street view available for this location

New bridges in Weathersfield, VT - historical statistics
  • New bridges - historical statistics
  • 2Before 1900
  • 11900-1909
  • 31930-1939
  • 121960-1969
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Weathersfield, VT - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 21980-1989
  • 01990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Weathersfield, VT
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Very good
  • 21.4%Good
  • 28.6%Satisfactory
  • 21.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 57.1%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 21.4%Very good
  • 64.3%Good
  • 14.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 58.3%Very good
  • 16.7%Good
  • 25.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 101420002414201,  Location: 0.8 MI JCT VT106 & TH32 (Lat: 43.417078,  Lng: -72.531086),  Route carried "on" structure: Other road C3032,  Year Built: 2004,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 150 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 158 (year 2029),  Design Load: HS 25 or greater,  Features Intersected: BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101420005814201,  Location: 0.03 MI TO JCT W VT131 (Lat: 43.401064,  Lng: -72.424439),  Route carried "on" structure: Other road C3046,  Year Built: 1960,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 210 (year 2029),  Design Load: H 15,  Features Intersected: MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $202,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $252,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 101420005914201,  Location: 0.26 MI TO JCT W US5 (Lat: 43.402814,  Lng: -72.410814),  Route carried "on" structure: Other road C3041,  Year Built: 1904,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 11 (year 2029),  Features Intersected: MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $165,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $215,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 101420006314201,  Location: 0.02 MI TO JCT W VT106 (Lat: 43.433664,  Lng: -72.527483),  Route carried "on" structure: Other road C3006,  Year Built: 1968,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 105 (year 2029),  Design Load: H 15,  Features Intersected: N. BR. BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $357,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $507,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 101420006614201,  Location: 0.04 MI TO JCT W VT131 (Lat: 43.398500,  Lng: -72.522089),  Route carried "on" structure: Other road C3020,  Year Built: 1840,  Year Reconstructed: 2007,  Status: Posted for load,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 11 (year 2029),  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 3.35m (10.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.75m (15.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $753,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $903,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 101420008314201,  Location: 0.15 MI TO JCT W VT131 (Lat: 43.426964,  Lng: -72.488261),  Route carried "on" structure: Other road C3065,  Year Built: 1870,  Year Reconstructed: 1986,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 11 (year 2029),  Features Intersected: BROOK
Minimum Vertical Clearance: 3.47m (11.38ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Very good,  Channel: Very good,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $456,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $606,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 200091030N14202,  Location: I 91 EXIT 8 (Lat: 43.402864,  Lng: -72.414194),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 6.68m (21.92ft),  Average Daily Traffic: 16,200 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 17,010 (year 2028),  Design Load: HS 20,  Features Intersected: I 91 OVER VT 131
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.654,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.68m (21.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,683,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $2,733,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 200091030S14202,  Location: I 91 EXIT 8 (Lat: 43.402647,  Lng: -72.414489),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 16,200 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 17,010 (year 2028),  Design Load: HS 20,  Features Intersected: I 91 OVER VT 131
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.654,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.68m (21.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,683,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $2,733,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 200091291014202,  Location: 0.3 MI S EXIT 8 (Lat: 43.398856,  Lng: -72.414622),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 13,000 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 13,650 (year 2028),  Design Load: H 20,  Features Intersected: MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.204,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $559,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $609,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 200146000114062,  Location: 3.2 MI E JCT. VT.103 (Lat: 43.392131,  Lng: -72.594394),  Route carried "on" structure: State highway 131,  Year Built: 2014,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 2,300 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,415 (year 2028),  Design Load: HL 93,  Features Intersected: TWENTY MILE STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.2m (122.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200146001014202,  Location: 0.7 MI E JCT. VT.106 (Lat: 43.406297,  Lng: -72.505967),  Route carried "on" structure: State highway 131,  Year Built: 1933,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 3,700 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,885 (year 2028),  Design Load: H 15,  Features Intersected: N. BR. BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $888,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $938,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 200146001114202,  Location: 1.1 MI E JCT. VT.106 (Lat: 43.408958,  Lng: -72.500317),  Route carried "on" structure: State highway 131,  Year Built: 1938,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 3,700 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,885 (year 2028),  Design Load: H 15,  Features Intersected: BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $497,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $547,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200153000214092,  Location: 0.9 MI W JCT. U.S.5 (Lat: 43.547125,  Lng: -72.414547),  Route carried "on" structure: State highway 12,  Year Built: 1931,  Year Reconstructed: 1981,  Status: Posted for load,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 3,200 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,360 (year 2028),  Design Load: H 15,  Features Intersected: LULLS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $453,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $503,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200153B00114202,  Location: NH VT SL (Lat: 43.403064,  Lng: -72.400292),  Route carried "on" structure: State highway 12,  Year Built: 1969,  Status: Open,  Structure Length: 20.67m (67.81ft),  Average Daily Traffic: 8,468 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,532 (year 2042),  Design Load: HS 20,  Features Intersected: CONNECTICUT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.723,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 54.9m (180.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.67m (67.81ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: August 2017,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 2014200D3114201,  Location: 0.8 MI N EXIT 8 (Lat: 43.414231,  Lng: -72.415464),  Route carried "on" structure: County highway TH37,  Year Built: 1965,  Status: Open,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 105 (year 2029),  Design Load: HS 20,  Features Intersected: TH NO 37 OVER I 91
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 201420D29414201,  Location: 3.4 MI S EXIT 8 (Lat: 43.355347,  Lng: -72.422489),  Route carried "on" structure: County highway TH51,  Year Built: 1965,  Status: Open,  Structure Length: 8.50m (27.89ft),  Average Daily Traffic: 150 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 158 (year 2029),  Design Load: H 15,  Features Intersected: TH NO 51 OVER I 91
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 200091030N14202,  Location: I 91 EXIT 8 (Lat: 43.402864,  Lng: -72.414194),  Route carried "under" structure: State highway 131,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 6,600 (year 1998),  Truck Traffic: 6%,  Features Intersected: I 91 OVER VT 131,  Facility Carried by Structure: I 00091 ML
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 25.506,  Lanes on structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 200091030S14202,  Location: I 91 EXIT 8 (Lat: 43.402647,  Lng: -72.414489),  Route carried "under" structure: State highway 131,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 6,600 (year 1998),  Truck Traffic: 6%,  Features Intersected: I 91 OVER VT 131,  Facility Carried by Structure: I 00091 ML
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 25.506,  Lanes on structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 2014200D3114201,  Location: 0.8 MI N EXIT 8 (Lat: 43.414231,  Lng: -72.415464),  Route carried "under" structure: Interstate 91,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 12,400 (year 1998),  Truck Traffic: 13%,  Features Intersected: I 91 UNDER TH NO 37,  Facility Carried by Structure: TR 0TH37
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 83.942,  Lanes on structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 201420D29414201,  Location: 3.4 MI S EXIT 8 (Lat: 43.355347,  Lng: -72.422489),  Route carried "under" structure: Interstate 91,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 10,500 (year 1998),  Truck Traffic: 13%,  Features Intersected: I 91 UNDER TH NO 51,  Facility Carried by Structure: TR 0TH51
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 77.216,  Lanes on structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)