Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ada, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 129Number of bridges
  • 1,070ft / 326mTotal length
  • $97,554,000Total costs
  • 312,562Total average daily traffic
  • 38,932Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ada
  • No street view available for this location

New bridges in Ada, OK - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 121930-1939
  • 91940-1949
  • 31950-1959
  • 211960-1969
  • 131970-1979
  • 131980-1989
  • 251990-1999
  • 172000-2009
  • 142010-2019
  • 12020-2022
Reconstructed bridges in Ada, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 11990-1999
  • 32000-2009
  • 12010-2019
Average Bridge Daily Traffic in Ada, OK
Average Bridge Truck Traffic in Ada, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.1%Excellent
  • 11.4%Very good
  • 50.6%Good
  • 16.5%Satisfactory
  • 3.8%Fair
  • 12.7%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.9%Excellent
  • 16.0%Very good
  • 28.4%Good
  • 17.3%Satisfactory
  • 17.3%Fair
  • 3.7%Poor
  • 12.3%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.5%Very good
  • 29.6%Good
  • 14.8%Satisfactory
  • 21.0%Fair
  • 2.5%Poor
  • 1.2%Serious
  • 12.3%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.4%Excellent
  • 11.6%Very good
  • 8.4%Good
  • 20.0%Satisfactory
  • 43.2%Fair
  • 2.1%Poor
  • 7.4%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.7%Very good
  • 25.8%Good
  • 58.1%Satisfactory
  • 6.5%Fair
Find on map >>   Show street view

Structure Number: 26331,  Location: 2.5S & 3.7W OF FITTSTOWN (Lat: 34.578333,  Lng: -96.698636),  Route carried "on" structure: County highway E1680,  Year Built: 2000,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: BLUE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,062,000,  Roadway Improvement Cost: $1,205,000,  Total Project Cost: $2,295,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 26727,  Location: 1.8 S & 1 W OF PICKETT (Lat: 34.754861,  Lng: -96.792406),  Route carried "on" structure: County highway 6254C,  Year Built: 2001,  Status: Open,  Structure Length: 3.67m (12.04ft),  Average Daily Traffic: 2,825 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,520 (year 2040),  Design Load: HS 20,  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.04m (13.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $672,000,  Roadway Improvement Cost: $369,000,  Total Project Cost: $1,067,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 26739,  Location: .1W OF MISS. (Lat: 34.784794,  Lng: -96.671131),  Route carried "on" structure: City street E1538,  Year Built: 1950,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE SANDY CREEK,  Facility Carried by Structure: CHAMBER LOOP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26864,  Location: .8 S & 2 W OF PICKETT (Lat: 34.768469,  Lng: -96.809992),  Route carried "on" structure: County highway N3480,  Year Built: 2004,  Status: Open,  Structure Length: 5.04m (16.54ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.55m (18.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $924,000,  Roadway Improvement Cost: $508,000,  Total Project Cost: $1,467,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 26865,  Location: .6 S & 2 W OF PICKETT (Lat: 34.769969,  Lng: -96.810103),  Route carried "on" structure: County highway N3480,  Year Built: 2004,  Status: Open,  Structure Length: 1.39m (4.56ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $252,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $400,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 26915,  Location: JCT. OF S.H. 99 & S.H. 1 (Lat: 34.789258,  Lng: -96.693650),  Route carried "on" structure: State highway 1,  Year Built: 2001,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 12,600 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 20,160 (year 2040),  Design Load: HL 93,  Features Intersected: S.H. 99 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 58.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.26m (30.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,257,000,  Roadway Improvement Cost: $3,724,000,  Total Project Cost: $6,320,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27234,  Location: .9N& 1.9E OF UNION VALLEY (Lat: 34.709050,  Lng: -96.548128),  Route carried "on" structure: County highway E1590,  Year Built: 1999,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: BUCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $235,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 27238,  Location: .4N & 2.1E OF HAPPYLAND (Lat: 34.800206,  Lng: -96.512158),  Route carried "on" structure: County highway 6223C,  Year Built: 2004,  Status: Open,  Structure Length: 1.69m (5.54ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: SINCERE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $308,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $489,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27842,  Location: 3 S & .5 W OF HAPPYLAND (Lat: 34.752647,  Lng: -96.555306),  Route carried "on" structure: County highway 6222C,  Year Built: 1995,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 640 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,024 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.296,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27928,  Location: SOUTH OF FITTSTOWN (Lat: 34.609703,  Lng: -96.633831),  Route carried "on" structure: State highway 99,  Year Built: 2007,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 2,100 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,360 (year 2040),  Design Load: HL 93,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.147,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.06m (13.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $660,000,  Total Project Cost: $1,120,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 28197,  Location: .6 N & .6 E OF BEBEE (Lat: 34.854219,  Lng: -96.782072),  Route carried "on" structure: County highway E1490,  Year Built: 2005,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: BUCKHORN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 28198,  Location: .3N & 1.7E OF UNION HILL (Lat: 34.825481,  Lng: -96.739481),  Route carried "on" structure: County highway 6214C,  Year Built: 2005,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 240 (year 2040),  Design Load: HS 20,  Features Intersected: TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.6m (28.2ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $190,000,  Roadway Improvement Cost: $285,000,  Total Project Cost: $546,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 28471,  Location: 3.5MI.S. JCT. S.H.3 (Lat: 34.685414,  Lng: -96.634794),  Route carried "on" structure: State highway 99,  Year Built: 2007,  Status: Open,  Structure Length: 5.04m (16.54ft),  Average Daily Traffic: 2,300 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,680 (year 2040),  Design Load: HL 93,  Features Intersected: JACK FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.595,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.55m (18.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $994,000,  Roadway Improvement Cost: $1,640,000,  Total Project Cost: $2,783,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 28854,  Location: 3.2W & 3.8N OF STONEWELL (Lat: 34.706667,  Lng: -96.581667),  Route carried "on" structure: County highway N3610,  Year Built: 2010,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,470 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,600 (year 2040),  Design Load: HS 20,  Features Intersected: SALT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.74m (2.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $300,000 ( Estimate for 2015),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 29219,  Location: 8.9N OF JCT. S.H. 7 (Lat: 34.487142,  Lng: -96.626678),  Route carried "on" structure: State highway 99,  Year Built: 2011,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,920 (year 2040),  Design Load: HL 93,  Features Intersected: LITTLE BLUE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.497,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 39.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 29238,  Location: 3.7 S 1 E OF LATTA (Lat: 34.693092,  Lng: -96.687544),  Route carried "on" structure: County highway N3550,  Year Built: 2008,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: NORTH FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.7m (38.4ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $230,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 29344,  Location: 1 N OF HARDEN CITY (Lat: 34.620000,  Lng: -96.600000),  Route carried "on" structure: County highway N3600,  Year Built: 2009,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 140 (year 2040),  Design Load: HS 20,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.86m (15.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $555,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 29345,  Location: 2.3 N .7 E OF UNION HILL (Lat: 34.854167,  Lng: -96.754444),  Route carried "on" structure: County highway N3510,  Year Built: 2009,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: HS 20,  Features Intersected: GRAYSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.52m (11.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $555,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2968,  Location: .6 S OF HIRD (Lat: 34.801389,  Lng: -96.652222),  Route carried "on" structure: County highway 6260C,  Year Built: 2010,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 1,884 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,400 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 29875,  Location: 2.3 MI. S OF JCT S.H. 3 (Lat: 34.703058,  Lng: -96.634786),  Route carried "on" structure: State highway 99,  Year Built: 2011,  Status: Open,  Structure Length: 4.98m (16.34ft),  Average Daily Traffic: 2,400 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,840 (year 2040),  Design Load: HL 93,  Features Intersected: CLEAR BOGGY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.329,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 53.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3005,  Location: 5.5 S JCT S.H. 3 (Lat: 34.659506,  Lng: -96.634714),  Route carried "on" structure: State highway 99,  Year Built: 2012,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 2,200 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,520 (year 2040),  Design Load: HL 93,  Features Intersected: BOIS D'ARC CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: 30322,  Location: IN PARK SOUTH END (Lat: 34.757500,  Lng: -96.655278),  Route carried "on" structure: City street N3568,  Year Built: 1934,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 320 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.2m (20.3ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 305,  Location: 2.8E 1.5S OF DURANT (Lat: 33.974444,  Lng: -96.320833),  Route carried "on" structure: County highway N3760,  Year Built: 2015,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: KANOLA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3066,  Location: .6 S & 3.8 W OF LATTA (Lat: 34.738611,  Lng: -96.771111),  Route carried "on" structure: County highway 6218C,  Year Built: 2011,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 606 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,520 (year 2040),  Design Load: HS 20,  Features Intersected: RODTKY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Total Project Cost: $225,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 30767,  Location: 1 E OF JCT S.H. 3W (Lat: 34.779522,  Lng: -96.710411),  Route carried "on" structure: State highway 19,  Year Built: 2016,  Status: Open,  Structure Length: 11.33m (37.17ft),  Average Daily Traffic: 8,350 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 13,360 (year 2040),  Design Load: HL 93,  Features Intersected: BIG SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.378,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 6200016H,  Subroute: 18),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 30768,  Location: 1 E JCT S.H. 3W (Lat: 34.779439,  Lng: -96.710456),  Route carried "on" structure: State highway 19,  Year Built: 2016,  Status: Open,  Structure Length: 11.33m (37.17ft),  Average Daily Traffic: 8,200 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 13,120 (year 2040),  Design Load: HL 93,  Features Intersected: BIG SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.378,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31332,  Location: 2.5 S .5 E OF FITTSTOWN (Lat: 34.578333,  Lng: -96.625278),  Route carried "on" structure: County highway E1680,  Year Built: 2013,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 240 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31636,  Location: .6 S 3.2 W of LATTA (Lat: 34.738433,  Lng: -96.760919),  Route carried "on" structure: County highway E1570,  Year Built: 2018,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 1,210 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,936 (year 2040),  Design Load: HL 93,  Features Intersected: BLACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.071,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.7m (18.7ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Total Project Cost: $225,000 ( Estimate for 2015),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3188,  Location: .4S 4.1W OF UNION VALLEY (Lat: 34.689161,  Lng: -96.652375),  Route carried "on" structure: County highway N3570,  Year Built: 2015,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: JACKFORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.7m (18.7ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3191,  Location: 2.5 S .8 E of BYNG (Lat: 34.825147,  Lng: -96.651614),  Route carried "on" structure: County highway E1510,  Year Built: 2020,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,200 (year 2040),  Design Load: HL 93,  Features Intersected: LITTLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31992,  Location: .5 N .5 W OF PONTOTOC (Lat: 34.499444,  Lng: -96.630278),  Route carried "on" structure: County highway E1735,  Year Built: 2017,  Status: Posted for load,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 4.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Total Project Cost: $134,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 32284,  Location: 3.9 S 1 E of LATTA (Lat: 34.688056,  Lng: -96.687778),  Route carried "on" structure: County highway N3550,  Year Built: 2018,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.036,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 1.6m (5.2ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17014,  Location: JCT SH 3W & SH19 (Lat: 34.785869,  Lng: -96.725494),  Route carried "under" structure: State highway 19,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2020),  Truck Traffic: 16%,  Features Intersected: S.H. 19 WB UNDER,  Facility Carried by Structure: S.H. 3W
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 19.422,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 17231,  Location: SW ADA (Lat: 34.767475,  Lng: -96.704839),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 5%,  Features Intersected: 18TH ST. UNDER,  Facility Carried by Structure: S.H. 1 SB
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 17248,  Location: SW ADA (Lat: 34.767106,  Lng: -96.704319),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 5%,  Features Intersected: 18TH ST. UNDER,  Facility Carried by Structure: S.H. 1 NB
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 17287,  Location: IN ADA (Lat: 34.789464,  Lng: -96.687364),  Route carried "under" structure: State highway 1,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 12,600 (year 2020),  Truck Traffic: 7%,  Features Intersected: S.H. 1 UNDER
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 5.800,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 17314,  Location: 1 MI SW ADA (Lat: 34.763417,  Lng: -96.701861),  Route carried "under" structure: State highway 3,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 9,200 (year 2020),  Truck Traffic: 7%,  Features Intersected: S.H. 3 UNDER,  Facility Carried by Structure: S.H. 1
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 17315,  Location: 1 MI SW ADA (Lat: 34.763464,  Lng: -96.702011),  Route carried "under" structure: State highway 3,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 9,200 (year 2020),  Truck Traffic: 7%,  Features Intersected: S.H. 3 UNDER,  Facility Carried by Structure: S.H. 1
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 1732,  Location: 0.2 MI W ADA (Lat: 34.776111,  Lng: -96.702547),  Route carried "under" structure: State highway 19,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 17,200 (year 2020),  Truck Traffic: 7%,  Features Intersected: S.H. 19 UNDER,  Facility Carried by Structure: S.H. 1 SB
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 21.528,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 17321,  Location: 1 MI W ADA (Lat: 34.776072,  Lng: -96.702450),  Route carried "under" structure: State highway 19,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 17,200 (year 2020),  Truck Traffic: 7%,  Features Intersected: S.H. 19 UNDER,  Facility Carried by Structure: S.H. 1 NB
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 21.560,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 17325,  Location: IN ADA (Lat: 34.779847,  Lng: -96.700278),  Route carried "under" structure: State highway 1,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 12,600 (year 2020),  Truck Traffic: 7%,  Features Intersected: S.H. 1 UNDER,  Facility Carried by Structure: CO. RD.
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 1.947,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 18562,  Location: 1.0 MI S-E SH 3W JCT (Lat: 34.738258,  Lng: -96.644436),  Route carried "under" structure: State highway 3,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 8,200 (year 2020),  Truck Traffic: 25%,  Features Intersected: S.H. 3 UNDER,  Facility Carried by Structure: STONECIPHER BLVD.
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 1.688,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 1858,  Location: 2.4 MI S-E SH 1 (Lat: 34.749397,  Lng: -96.656928),  Route carried "under" structure: State highway 3,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 4,150 (year 2020),  Truck Traffic: 7%,  Features Intersected: S.H. 3 UNDER,  Facility Carried by Structure: S.H. 99
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 186,  Location: 2.4 MI S-E SH 3W JCT (Lat: 34.725656,  Lng: -96.634778),  Route carried "under" structure: State highway 3,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 8,200 (year 2020),  Truck Traffic: 25%,  Features Intersected: S.H. 3 UNDER,  Facility Carried by Structure: S.H. 99
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 3.235,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 19806,  Location: 2.1 MI SE OF S.H. 1 (Lat: 34.752600,  Lng: -96.670197),  Route carried "under" structure: State highway 3,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 6,600 (year 2020),  Truck Traffic: 7%,  Features Intersected: S.H. 3 UNDER,  Facility Carried by Structure: KERR LAB RD.
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 3.235,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 19813,  Location: 0.9 MI SE OF S.H. 1 (Lat: 34.755481,  Lng: -96.687592),  Route carried "under" structure: State highway 3,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 6,600 (year 2020),  Truck Traffic: 7%,  Features Intersected: S.H. 3W UNDER,  Facility Carried by Structure: OAK AVE.
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 1.529,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 19824,  Location: 0.4 MI SE OF S.H. 1 (Lat: 34.760000,  Lng: -96.695278),  Route carried "under" structure: County highway ,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 10%,  Features Intersected: RD. & BNSF R.R. UNDER,  Facility Carried by Structure: S.H. 3
Minimum Vertical Clearance: 7.06m (23.16ft),  Kilometerpoint: 0.612,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 19825,  Location: 0.4 MI SE OF S.H. 1 (Lat: 34.760303,  Lng: -96.696283),  Route carried "under" structure: County highway ,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 10%,  Features Intersected: RD. & BNSF R.R. UNDER,  Facility Carried by Structure: S.H. 3
Minimum Vertical Clearance: 7.06m (23.16ft),  Kilometerpoint: 0.612,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 26915,  Location: JCT. OF S.H. 99 & S.H. 1 (Lat: 34.789258,  Lng: -96.693650),  Route carried "under" structure: State highway 99,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 8,300 (year 2020),  Truck Traffic: 16%,  Features Intersected: S.H. 99 UNDER,  Facility Carried by Structure: S.H. 1
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.5m (136.2ft)

Discuss Ada, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.