Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Arnett, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 42Number of bridges
  • 325ft / 98.6mTotal length
  • $34,257,000Total costs
  • 88,153Total average daily traffic
  • 15,662Total average daily truck traffic
  • 135,348Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Arnett
  • No street view available for this location

New bridges in Arnett, OK - historical statistics
  • New bridges - historical statistics
  • 101920-1929
  • 131930-1939
  • 11940-1949
  • 61950-1959
  • 11960-1969
  • 51970-1979
  • 51980-1989
  • 12010-2019
Reconstructed bridges in Arnett, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21940-1949
  • 21950-1959
  • 21960-1969
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
  • 02010-2019
  • 12020-2022
Average Bridge Daily Traffic in Arnett, OK
Average Bridge Truck Traffic in Arnett, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Good
  • 42.9%Satisfactory
  • 17.9%Fair
  • 10.7%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.6%Very good
  • 14.3%Good
  • 50.0%Satisfactory
  • 21.4%Fair
  • 10.7%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Good
  • 46.4%Satisfactory
  • 10.7%Fair
  • 7.1%Poor
  • 10.7%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.9%Very good
  • 26.3%Good
  • 42.1%Satisfactory
  • 18.4%Fair
  • 2.6%Poor
  • 2.6%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 7.1%Very good
  • 28.6%Good
  • 57.1%Satisfactory
  • 7.1%Fair
Find on map >>   Show street view

Structure Number: 13,  Location: 2W OF MSK C/L 3.7S SH16 (Lat: 35.686275,  Lng: -95.748611),  Route carried "on" structure: County highway N4080,  Year Built: 1989,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 25.3m (83.0ft),  Right: 25.3m (83.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $618,000 ( Estimate for 2015),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 641,  Location: 7.5 MI E SH48 (Lat: 34.517106,  Lng: -96.282761),  Route carried "on" structure: State highway 31,  Year Built: 1935,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 970 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,552 (year 2040),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.137,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Masonry,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $660,000,  Total Project Cost: $1,120,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 644,  Location: 11.15 NW LE FLORE C/L (Lat: 34.945089,  Lng: -95.077153),  Route carried "on" structure: State highway 82,  Year Built: 1958,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,600 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,560 (year 2040),  Design Load: HS 20,  Features Intersected: RED OAK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.844,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1293,  Location: 3.1S 1.1E OF ATWOOD (Lat: 34.912081,  Lng: -96.318206),  Route carried "on" structure: County highway N3760,  Year Built: 1923,  Year Reconstructed: 1958,  Status: Temporarily open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Fair,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.79m (9.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $143,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1295,  Location: .5E OF US 81 (Lat: 34.428211,  Lng: -97.965061),  Route carried "on" structure: County highway N2820,  Year Built: 1923,  Year Reconstructed: 1951,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,500 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,000 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1297,  Location: 3.99 N IDABEL (Lat: 33.958078,  Lng: -94.824997),  Route carried "on" structure: County highway 4560C,  Year Built: 1923,  Year Reconstructed: 1940,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,600 (year 2040),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.862,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.17m (10.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1301,  Location: 3.4 E JCT SH-2 (Lat: 35.253547,  Lng: -95.178008),  Route carried "on" structure: State highway 9,  Year Built: 1923,  Year Reconstructed: 1950,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 6,800 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 10,880 (year 2040),  Design Load: H 20,  Features Intersected: LITTLE SNAKE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.674,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1457,  Location: 4. N 2.3 W OF SH 49 (Lat: 34.782614,  Lng: -98.504922),  Route carried "on" structure: County highway 1608C,  Year Built: 1925,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 578 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 925 (year 2040),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.919,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $246,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1704,  Location: 6.8 S 2.7 W PADEN (Lat: 35.406172,  Lng: -96.616589),  Route carried "on" structure: County highway E1110,  Year Built: 1926,  Status: Temporarily open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Satisfactory,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.28m (10.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $265,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 186,  Location: 1.7 MI W OF VELMA (Lat: 34.463419,  Lng: -97.701611),  Route carried "on" structure: County highway 6972C,  Year Built: 1927,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,407 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,251 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 24.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $196,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $311,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1862,  Location: .8 S 2. W OKEMAH (Lat: 35.420739,  Lng: -96.336267),  Route carried "on" structure: County highway E1100,  Year Built: 1927,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $196,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $311,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 1864,  Location: 2.27 W JCT US-271 (Lat: 35.236083,  Lng: -94.712817),  Route carried "on" structure: US 59,  Year Built: 1927,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 6,100 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 9,760 (year 2040),  Design Load: H 10,  Features Intersected: RED BANK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.652,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.03m (13.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $636,000,  Roadway Improvement Cost: $1,050,000,  Total Project Cost: $1,781,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1866,  Location: 4.2 MI NE WASHITA C/L (Lat: 35.479675,  Lng: -99.074506),  Route carried "on" structure: ServiceUS 40,  Year Built: 1927,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 15,  Features Intersected: HACKBERRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.677,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.98m (13.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $660,000,  Total Project Cost: $1,120,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3347,  Location: 1.8 MI S US60 (Lat: 36.112036,  Lng: -99.756942),  Route carried "on" structure: US 283,  Year Built: 1931,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,240 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.769,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 46.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.13m (3.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3366,  Location: 1.9 MI S US60 (Lat: 36.110922,  Lng: -99.756947),  Route carried "on" structure: US 283,  Year Built: 1931,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,240 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.640,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 3413,  Location: 4.1 MI W JCT US 62 (Lat: 35.069661,  Lng: -98.412175),  Route carried "on" structure: State highway 9,  Year Built: 1931,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 2,600 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,160 (year 2040),  Design Load: H 15,  Features Intersected: TWO HATCHET CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.650,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.33m (20.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $540,000,  Roadway Improvement Cost: $891,000,  Total Project Cost: $1,512,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 394,  Location: 0.5 MI E ARNETT (Lat: 36.135675,  Lng: -99.759556),  Route carried "on" structure: US 60,  Year Built: 1933,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,800 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,880 (year 2040),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.786,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 18.7m (61.4ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 5416,  Location: 1.0 MI W ARNETT (Lat: 36.137172,  Lng: -99.792558),  Route carried "on" structure: US 60,  Year Built: 1937,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,800 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,880 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.193,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5726,  Location: 9S .2E OF GAGE (Lat: 36.187931,  Lng: -99.752647),  Route carried "on" structure: County highway E0570,  Year Built: 1938,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 75 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 120 (year 2040),  Features Intersected: LITTLE WOLF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Serious,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $276,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 5792,  Location: 5.4 N 3. E OF DAVIDSON (Lat: 34.319492,  Lng: -99.023783),  Route carried "on" structure: County highway E1860,  Year Built: 1938,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 40 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 64 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 64,  Location: 4.3 MI N MAYES C/L (Lat: 36.569431,  Lng: -95.219858),  Route carried "on" structure: US 69,  Year Built: 1938,  Year Reconstructed: 1966,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 4,500 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 7,200 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.886,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 33.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 6401,  Location: 6.97 N JCT US-271 (Lat: 35.118292,  Lng: -94.653414),  Route carried "on" structure: US 59,  Year Built: 1938,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 9,900 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 15,840 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.216,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 46.6m (152.9ft),  Out-to-Out Width: 47.2m (154.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $527,000,  Total Project Cost: $895,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 6407,  Location: .2S .3W 1.2S OF MOORELAND (Lat: 36.417850,  Lng: -99.210525),  Route carried "on" structure: County highway N2130,  Year Built: 1938,  Status: Closed,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 10,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Fair,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 4.67m (15.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $239,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $380,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6408,  Location: 4.5 W 2.2 N OF WATONGA (Lat: 35.880153,  Lng: -98.490594),  Route carried "on" structure: County highway N2530,  Year Built: 1938,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.71m (15.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $241,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $383,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 6411,  Location: 2E .7S OF US177 & SH66 (Lat: 35.670197,  Lng: -96.981756),  Route carried "on" structure: County highway N3380,  Year Built: 1938,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: PECAN CREEK,  Facility Carried by Structure: N3880
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.12m (13.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $335,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9704,  Location: 2.S SH17 2.2W US81 (Lat: 34.754336,  Lng: -97.999711),  Route carried "on" structure: County highway E1560,  Year Built: 1941,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $294,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12841,  Location: 5.6 MI E OKLA. C/L (Lat: 35.680933,  Lng: -97.047167),  Route carried "on" structure: Interstate 44,  Year Built: 1952,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 12,450 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 19,920 (year 2040),  Design Load: H 20,  Features Intersected: S.H. 66 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.500,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.3m (119.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $738,000,  Total Project Cost: $1,413,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1292,  Location: AT UTAH AVE (Lat: 35.497300,  Lng: -97.594403),  Route carried "on" structure: City street E1047,  Year Built: 1953,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 450 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 720 (year 2040),  Design Load: HS 20,  Features Intersected: DEEP FORK CREEK,  Facility Carried by Structure: NW 28TH ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.5m (11.5ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.68m (12.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1306,  Location: 1.5 MI E STEPHENS CO (Lat: 34.630319,  Lng: -97.536131),  Route carried "on" structure: State highway 29,  Year Built: 1953,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 1,600 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,560 (year 2040),  Design Load: H 20,  Features Intersected: SALT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.962,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.19m (23.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $602,000,  Roadway Improvement Cost: $994,000,  Total Project Cost: $1,686,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1308,  Location: 50.5 MI N E JCT I-35 (Lat: 35.794931,  Lng: -96.565725),  Route carried "on" structure: County highway N3620,  Year Built: 1953,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 15,  Features Intersected: TURNER TP (I-44) UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.472,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $572,000,  Roadway Improvement Cost: $858,000,  Total Project Cost: $1,639,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1311,  Location: 3.8 MI.W.TULSA CL (Lat: 36.367689,  Lng: -96.070008),  Route carried "on" structure: State highway 20,  Year Built: 1953,  Status: Open,  Structure Length: 7.99m (26.21ft),  Average Daily Traffic: 4,200 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,720 (year 2040),  Design Load: H 20,  Features Intersected: QUAPAW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.649,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.38m (34.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $826,000,  Roadway Improvement Cost: $1,364,000,  Total Project Cost: $2,314,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1703,  Location: 3S;.7E OF VIVIAN (Lat: 35.245017,  Lng: -95.708522),  Route carried "on" structure: County highway 4630C,  Year Built: 1967,  Status: Posted for load,  Structure Length: 11.92m (39.11ft),  Average Daily Traffic: 149 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 238 (year 2040),  Features Intersected: LAKE EUFAULA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 45.1m (148.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 12.83m (42.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $655,000,  Roadway Improvement Cost: $360,000,  Total Project Cost: $1,028,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1858,  Location: 2.4 MI S-E SH 1 (Lat: 34.749397,  Lng: -96.656928),  Route carried "on" structure: State highway 99,  Year Built: 1973,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 6,400 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,240 (year 2040),  Design Load: HS 20,  Features Intersected: S.H. 3 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.215,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.4m (139.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 58.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.25m (33.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,315,000,  Roadway Improvement Cost: $2,170,000,  Total Project Cost: $3,682,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1859,  Location: JCT I-40/US-69 (Lat: 35.458875,  Lng: -95.543550),  Route carried "on" structure: US 69,  Year Built: 1973,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 8,300 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 13,280 (year 2040),  Design Load: HS 20,  Features Intersected: I-40 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.578,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.8m (48.6ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.3m (128.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.00m (29.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,153,000,  Roadway Improvement Cost: $1,903,000,  Total Project Cost: $3,230,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1863,  Location: 6.6 MI E JCT US 81 (Lat: 34.637850,  Lng: -97.847342),  Route carried "on" structure: State highway 29,  Year Built: 1974,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,300 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,680 (year 2040),  Design Load: HS 20,  Features Intersected: EAST BRANCH CLEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.572,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 187,  Location: 3.7W OF DOUGLAS (Lat: 36.260336,  Lng: -97.736522),  Route carried "on" structure: County highway E0520,  Year Built: 1974,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: HS 20,  Features Intersected: BITTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.344,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.96m (16.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 19032,  Location: 9.5 MI E STATE LINE (Lat: 36.136725,  Lng: -99.832333),  Route carried "on" structure: US 60,  Year Built: 1975,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 1,800 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,880 (year 2040),  Design Load: HS 20,  Features Intersected: RED BLUFF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.189,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $549,000,  Roadway Improvement Cost: $906,000,  Total Project Cost: $1,538,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21391,  Location: .3W .4S 1.2W OF ARNETT (Lat: 36.129967,  Lng: -99.793061),  Route carried "on" structure: County highway E0610,  Year Built: 1987,  Status: Posted for load,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 15,  Features Intersected: MOSQUITO CREEK BR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 21521,  Location: 31ST AT TULSA CL (Lat: 36.118942,  Lng: -95.761033),  Route carried "on" structure: County highway 7302C,  Year Built: 1987,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 4,560 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,600 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: E ROCKFORD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 21954,  Location: .3W 1.4S 3.1W OF ARNETT (Lat: 36.115069,  Lng: -99.828619),  Route carried "on" structure: County highway E0620,  Year Built: 1988,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: RED BLUFF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.03m (19.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $308,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $492,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Arnett, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.