Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Athens, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 134Number of bridges
  • 1,283ft / 391mTotal length
  • $140,259,000Total costs
  • 828,327Total average daily traffic
  • 149,555Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Athens
  • No street view available for this location

New bridges in Athens, AL - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 81920-1929
  • 51930-1939
  • 111940-1949
  • 291950-1959
  • 341960-1969
  • 111970-1979
  • 21980-1989
  • 141990-1999
  • 102000-2009
  • 72010-2019
  • 22020-2022
Reconstructed bridges in Athens, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31950-1959
  • 91960-1969
  • 11970-1979
  • 31980-1989
Average Bridge Daily Traffic in Athens, AL
Average Bridge Truck Traffic in Athens, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.8%Excellent
  • 7.1%Very good
  • 37.5%Good
  • 37.5%Satisfactory
  • 12.5%Fair
  • 1.8%Poor
  • 1.8%Imminent failure
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 1.8%Excellent
  • 12.5%Very good
  • 44.6%Good
  • 26.8%Satisfactory
  • 12.5%Fair
  • 1.8%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.8%Excellent
  • 8.9%Very good
  • 35.7%Good
  • 42.9%Satisfactory
  • 7.1%Fair
  • 1.8%Poor
  • 1.8%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.4%Very good
  • 40.7%Good
  • 38.9%Satisfactory
  • 8.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 11.8%Very good
  • 41.2%Good
  • 39.7%Satisfactory
  • 7.4%Fair
Find on map >>   Show street view

Structure Number: 10359,  Location: SEC33 T2S R3W (Lat: 34.824781,  Lng: -86.850611),  Route carried "on" structure: County highway 56,  Year Built: 1970,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 253 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 377 (year 2034),  Design Load: H 15,  Features Intersected: COPELAND BR,  Facility Carried by Structure: ED RAY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $268,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $295,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10688,  Location: 4 MI S JCT SR 2 & I 65 (Lat: 34.730000,  Lng: -86.935000),  Route carried "on" structure: County highway 24,  Year Built: 1972,  Status: Open,  Structure Length: 10.39m (34.09ft),  Average Daily Traffic: 1,097 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,072 (year 2034),  Design Load: HS 20,  Features Intersected: I 65,  Facility Carried by Structure: HSV Brown Ferry RD
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 69.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.30m (37.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,643,000,  Roadway Improvement Cost: $364,000,  Total Project Cost: $4,007,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10743,  Location: LANDFILL RD * SWAN CREEK (Lat: 34.764167,  Lng: -86.946917),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 270 (year 2007),  Truck Traffic: 50%,  Average Future Daily Traffic: 321 (year 2033),  Design Load: H 15,  Features Intersected: SWAN CREEK,  Facility Carried by Structure: STRAIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.1m (23.3ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,533,000,  Roadway Improvement Cost: $153,000,  Total Project Cost: $1,686,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11043,  Location: 4.9 MI N JCT SR99 & SR127 (Lat: 34.851667,  Lng: -87.041667),  Route carried "on" structure: State highway 99,  Year Built: 1947,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 6,250 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,418 (year 2033),  Design Load: H 15,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.429,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $558,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $614,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11221,  Location: .2 MI E US 31 ON SANDIFER (Lat: 34.774517,  Lng: -86.952750),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 1.60m (5.25ft),  Average Daily Traffic: 112 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 134 (year 2033),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: SANDIFER RD E
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 65.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $422,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $464,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11393,  Location: JCT SR 2 & SR 3 (Lat: 34.786667,  Lng: -86.956667),  Route carried "on" structure: US 72,  Year Built: 1975,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 32,800 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 39,864 (year 2033),  Design Load: HS 20,  Features Intersected: SR 3,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 121.916,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 20.6m (67.6ft),  Out-to-Out Width: 21.4m (70.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 40.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.08m (19.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,918,000,  Roadway Improvement Cost: $292,000,  Total Project Cost: $3,210,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 11454,  Location: S JEFFERSON AT KROGERS (Lat: 34.783333,  Lng: -86.971667),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 2,443 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,352 (year 2035),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: S DRIVEWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.41m (7.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $417,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $459,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11467,  Location: Family Dollar (Lat: 34.798361,  Lng: -86.972278),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 1,101 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,028 (year 2035),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: CITY ROUTE 64
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.7m (48.2ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 37.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $562,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $618,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11469,  Location: LEE ST * SOUTH JEFFERSON (Lat: 34.799111,  Lng: -86.972278),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 845 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,165 (year 2033),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: LEE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 38.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $553,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $608,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11543,  Location: 0.7 MI W JCT SR 2 & SR 3 (Lat: 34.790000,  Lng: -86.968333),  Route carried "on" structure: US 72,  Year Built: 1956,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 31,750 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 38,588 (year 2033),  Design Load: HS 20,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 120.862,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.48m (8.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,373,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $1,510,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13335,  Location: FORREST ST * JEFFERSON ST (Lat: 34.797111,  Lng: -86.971944),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 1.59m (5.22ft),  Average Daily Traffic: 2,178 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,042 (year 2035),  Design Load: HS 20,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: FORREST ST
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.1m (13.5ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $657,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $723,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14258,  Location: 0.1 MI SOUTH US 72 (Lat: 34.789028,  Lng: -86.971444),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 1,629 (year 2007),  Truck Traffic: 25%,  Average Future Daily Traffic: 2,226 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: SOUTH JEFFERSON S
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 26.7m (87.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 74.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.41m (7.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,362,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $1,498,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15154,  Location: SEC10 T4S R5W (Lat: 34.705372,  Lng: -87.045919),  Route carried "on" structure: County highway 14,  Year Built: 1990,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 120 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 160 (year 2034),  Design Load: HS 20,  Features Intersected: BRILEY CR,  Facility Carried by Structure: HACHETT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 71.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,086,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,195,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15267,  Location: BETWEEN HOUSTON * MADISON (Lat: 34.800617,  Lng: -86.974117),  Route carried "on" structure: City street ,  Year Built: 1910,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,319 (year 2003),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,264 (year 2033),  Design Load: HS 20,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: BROWNSFERRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 74.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $420,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15297,  Location: S OF S ST E OF JEFFERSON (Lat: 34.799611,  Lng: -86.969417),  Route carried "on" structure: City street ,  Year Built: 1960,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 180 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 242 (year 2033),  Design Load: HS 20,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: ALLEY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $353,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $388,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1562,  Location: SEC17 T3S R3W (Lat: 34.773797,  Lng: -86.864256),  Route carried "on" structure: County highway 36,  Year Built: 1992,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 890 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,322 (year 2034),  Design Load: HS 20,  Features Intersected: FRENCH MILL CREEK,  Facility Carried by Structure: CAPSHAW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 14.8m (48.6ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $630,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15621,  Location: SEC17 T3S R3W (Lat: 34.775631,  Lng: -86.863861),  Route carried "on" structure: County highway 95,  Year Built: 1992,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 333 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 493 (year 2034),  Design Load: HS 20,  Features Intersected: FRENCH MILL CREEK,  Facility Carried by Structure: MCCULLEY MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 14.8m (48.6ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $630,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15671,  Location: SOMOLA ST IN ATHENS (Lat: 34.807222,  Lng: -86.981500),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 117 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 178 (year 2032),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: SOMOLA ST
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $365,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $402,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15672,  Location: JCT. HINES ST.*TOWN CREEK (Lat: 34.808250,  Lng: -86.983222),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,517 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,190 (year 2033),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: HINES ST.
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $538,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $592,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1573,  Location: SEC9 T3S R3W (Lat: 34.788203,  Lng: -86.855578),  Route carried "on" structure: County highway 42,  Year Built: 1993,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 890 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,322 (year 2034),  Design Load: HS 20,  Features Intersected: FRENCH MILL CR,  Facility Carried by Structure: PEPPER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 73.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $353,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $388,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 158,  Location: 3 MI N JCT SR 3 & SR 2 (Lat: 34.827875,  Lng: -86.939292),  Route carried "on" structure: US 31,  Year Built: 1991,  Status: Open,  Structure Length: 10.61m (34.81ft),  Average Daily Traffic: 3,135 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,027 (year 2033),  Design Load: HS 20,  Features Intersected: I 65,  Facility Carried by Structure: SR 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 602.501,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 80.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.51m (37.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,210,000,  Roadway Improvement Cost: $221,000,  Total Project Cost: $2,431,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15912,  Location: SEC22 T2S R4W (Lat: 34.857483,  Lng: -86.942761),  Route carried "on" structure: County highway 81,  Year Built: 1994,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 390 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 600 (year 2033),  Design Load: HS 20,  Features Intersected: MUDDY CREEK,  Facility Carried by Structure: PINEY CHAPEL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $788,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $867,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16016,  Location: SEC21 T2S R4W (Lat: 34.848447,  Lng: -86.960939),  Route carried "on" structure: County highway 81,  Year Built: 1994,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 845 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,259 (year 2034),  Design Load: HS 20,  Features Intersected: SWAN CREEK,  Facility Carried by Structure: PINEY CHAPEL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $504,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $554,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16367,  Location: SEC 34 T3S R5W (Lat: 34.746336,  Lng: -87.042544),  Route carried "on" structure: County highway 29,  Year Built: 1995,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4,580 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,805 (year 2034),  Design Load: HS 20,  Features Intersected: BRILEY FORK CREEK,  Facility Carried by Structure: BROWNS FERRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $358,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $394,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16967,  Location: 1101 PRYOR @ SAMOLA (Lat: 34.807000,  Lng: -86.981389),  Route carried "on" structure: City street ,  Year Built: 1996,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 1,661 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,150 (year 2034),  Design Load: HS 20,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: PRYOR ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 73.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $479,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $527,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17707,  Location: SEC 9 T3S R3W (Lat: 34.795917,  Lng: -86.850222),  Route carried "on" structure: County highway 99,  Year Built: 1999,  Status: Open,  Structure Length: 1.63m (5.35ft),  Average Daily Traffic: 236 (year 2005),  Truck Traffic: 2%,  Average Future Daily Traffic: 350 (year 2028),  Features Intersected: FRENCH'S MILL CREEK,  Facility Carried by Structure: JONES ROAD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.8m (25.6ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.6m (11.8ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $536,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $590,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18151,  Location: SEC 29 T2S R3W (Lat: 34.846567,  Lng: -86.860911),  Route carried "on" structure: County highway 71,  Year Built: 2002,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 345 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 520 (year 2033),  Features Intersected: KAUFMAN BRANCH,  Facility Carried by Structure: BEATLINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 68.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $494,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $543,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18163,  Location: 0.25 MI E OF MEADOWS ROAD (Lat: 34.817472,  Lng: -86.854556),  Route carried "on" structure: County highway 54,  Year Built: 2002,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 169 (year 2014),  Truck Traffic: 6%,  Average Future Daily Traffic: 251 (year 2034),  Design Load: HS 20,  Features Intersected: COPELAND BRANCH,  Facility Carried by Structure: BARKSDALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 56.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $457,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $503,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18176,  Location: 0.4 M W JCT SR 2 & I 65 (Lat: 34.784936,  Lng: -86.948267),  Route carried "on" structure: US 72,  Year Built: 2005,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 16,400 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 19,932 (year 2033),  Design Load: HS 20,  Features Intersected: SWAN CREEK,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 122.511,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.44m (24.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,143,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $2,357,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18715,  Location: SEC28 T2S R3W (Lat: 34.836283,  Lng: -86.844978),  Route carried "on" structure: County highway 64,  Year Built: 2003,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 720 (year 2002),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,070 (year 2028),  Design Load: HS 20,  Features Intersected: COPELAND BRANCH,  Facility Carried by Structure: COPELAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.5m (8.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $359,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $395,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19074,  Location: 0.1 M W JCT SR 99 & SR 3 (Lat: 34.818800,  Lng: -86.947300),  Route carried "on" structure: State highway 99,  Year Built: 2009,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 11,120 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 14,977 (year 2033),  Design Load: HS 20,  Features Intersected: SWAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.261,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,369,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $2,606,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19145,  Location: SEC14 T4S R5W (Lat: 34.695608,  Lng: -87.025731),  Route carried "on" structure: County highway 14,  Year Built: 2004,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 267 (year 2014),  Truck Traffic: 3%,  Average Future Daily Traffic: 396 (year 2034),  Design Load: HS 20,  Features Intersected: MUD CREEK,  Facility Carried by Structure: BRIDGEFORTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 79.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,106,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,217,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1919,  Location: SEC 23 T2S R5W (Lat: 34.849342,  Lng: -87.027369),  Route carried "on" structure: County highway 47,  Year Built: 2004,  Status: Open,  Structure Length: 1.56m (5.12ft),  Average Daily Traffic: 250 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 375 (year 2034),  Design Load: HS 20,  Features Intersected: FOUR MILE BRANCH,  Facility Carried by Structure: MYERS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 79.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.24m (7.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $518,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $570,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19205,  Location: SEC 10 T2S R4W (Lat: 34.876794,  Lng: -86.939608),  Route carried "on" structure: County highway 80,  Year Built: 2005,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 300 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 445 (year 2029),  Design Load: HS 20,  Features Intersected: MUDDY CREEK,  Facility Carried by Structure: CAREY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $946,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,041,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19296,  Location: 3.6 M N JCT SR 99 & SR 3 (Lat: 34.822500,  Lng: -87.006000),  Route carried "on" structure: State highway 99,  Year Built: 2006,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 7,960 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,721 (year 2033),  Design Load: HS 20,  Features Intersected: ROUND ISLAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.755,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $360,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $396,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19479,  Location: SEC 25 T2S R5W (Lat: 34.850794,  Lng: -87.018131),  Route carried "on" structure: County highway 63,  Year Built: 2005,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 650 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 960 (year 2029),  Design Load: HS 20,  Features Intersected: FOUR MILE BRANCH,  Facility Carried by Structure: EASTER FERRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $495,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $545,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2065,  Location: 4.3 MI N JCT SR 3 & SR 20 (Lat: 34.688053,  Lng: -86.953178),  Route carried "on" structure: US 31,  Year Built: 2015,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 10,098 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 16,560 (year 2035),  Design Load: HL 93,  Features Intersected: Swan Creek,  Facility Carried by Structure: SR 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 586.645,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 52.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.23m (30.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,658,000,  Roadway Improvement Cost: $266,000,  Total Project Cost: $2,924,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2081,  Location: Mooresville Road (Lat: 34.766528,  Lng: -86.877275),  Route carried "on" structure: County highway 71,  Year Built: 2015,  Status: Open,  Structure Length: 2.73m (8.96ft),  Average Daily Traffic: 5,146 (year 2014),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,646 (year 2034),  Design Load: HS 20,  Features Intersected: Frenchs Mill Creek,  Facility Carried by Structure: Mooresville Road
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 45.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.65m (11.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,011,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,112,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20934,  Location: SEC8 T4S R4W (Lat: 34.731503,  Lng: -87.001478),  Route carried "on" structure: County highway 45,  Year Built: 2016,  Status: Open,  Structure Length: 1.56m (5.12ft),  Average Daily Traffic: 1,350 (year 2016),  Truck Traffic: 13%,  Average Future Daily Traffic: 2,007 (year 2036),  Design Load: HS 20,  Features Intersected: MUD CREEK,  Facility Carried by Structure: LUCAS FERRY RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Culverts: Very good,  Operating Rating: 40.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.24m (7.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $544,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $598,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20935,  Location: 1.0 mi south U.S. 72 (Lat: 34.756444,  Lng: -86.895139),  Route carried "on" structure: City street 93,  Year Built: 2016,  Status: Open,  Structure Length: 1.72m (5.64ft),  Average Daily Traffic: 560 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 784 (year 2032),  Design Load: HS 20,  Features Intersected: French Mill Creek,  Facility Carried by Structure: Cambridge Lane
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 56.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.42m (7.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $587,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $646,000 ( Estimate for 2022)
Discuss Athens, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.