Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Auburn Hills, Michigan (MI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 74Number of bridges
  • 827ft / 252mTotal length
  • $611,000Total costs
  • 3,318,987Total average daily traffic
  • 167,938Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Auburn Hills
  • No street view available for this location

New bridges in Auburn Hills, MI - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 21950-1959
  • 381960-1969
  • 41980-1989
  • 181990-1999
  • 62000-2009
  • 52010-2019
Reconstructed bridges in Auburn Hills, MI - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41980-1989
  • 81990-1999
  • 42000-2009
Average Bridge Daily Traffic in Auburn Hills, MI
Average Bridge Truck Traffic in Auburn Hills, MI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 21.4%Very good
  • 33.3%Good
  • 35.7%Satisfactory
  • 7.1%Fair
  • 2.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 26.2%Very good
  • 35.7%Good
  • 28.6%Satisfactory
  • 9.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.5%Very good
  • 73.8%Good
  • 14.3%Satisfactory
  • 2.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 35.7%Good
  • 42.9%Satisfactory
  • 14.3%Fair
  • 7.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Poor
Find on map >>   Show street view

Structure Number: 12687,  Location: BET SQUIRREL AND ADAMS (Lat: 42.646800,  Lng: -83.212450),  Route carried "on" structure: City street 2059,  Year Built: 1989,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 6,000 (year 0000),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,300 (year 2005),  Design Load: HS 20,  Features Intersected: CLINTON RIVER,  Facility Carried by Structure: HAMLIN ROAD WBOUND
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.568,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 63.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Built-up,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 12831,  Location: PONTIAC TWP SEC 25 (Lat: 42.643392,  Lng: -83.220025),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 9,820 (year 1997),  Truck Traffic: 3%,  Average Future Daily Traffic: 24,300 (year 2015),  Design Load: HS 20,  Features Intersected: M-59,  Facility Carried by Structure: SQUIRREL RD SB
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 1.062,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 42.1m (138.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13196,  Location: 2.0 MI N OF M-59 (Lat: 42.669553,  Lng: -83.241361),  Route carried "on" structure: Interstate 75,  Year Built: 1963,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 56,400 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 59,900 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: PONTIAC ROAD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 33.242,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 64,  Subroute: 6),  Owner: State Highway Agency,  Approaching Roadway Width: 30.1m (98.8ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.1m (62.7ft),  Curb-To-Curb Width: 29.4m (96.5ft),  Out-to-Out Width: 31.1m (102.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13198,  Location: 1.6 MI N OF M-59 (Lat: 42.665750,  Lng: -83.241189),  Route carried "on" structure: City street 2059,  Year Built: 2015,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 24,399 (year 1997),  Truck Traffic: 3%,  Average Future Daily Traffic: 28,059 (year 2017),  Design Load: Greater than HL93,  Features Intersected: I-75,  Facility Carried by Structure: UNIVERSITY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.250,  Lanes on structure: 4,  Lanes under structure: 9,  Base Highway Network: Yes (Inventory Route: 62,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.8m (117.5ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 4.3m (14.1ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 25.7m (84.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13595,  Location: IN SUBDIVSION SEC 21 (Lat: 42.750556,  Lng: -83.293333),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 500 (year 2010),  Average Future Daily Traffic: 545 (year 2030),  Design Load: HS 20,  Features Intersected: VOORHEIS LAKE,  Facility Carried by Structure: CEDAR KEY DRIVE
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 1.275,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Channel: Poor,  Culverts: Poor,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14037,  Location: ORION TWP SEC 19 (Lat: 42.740917,  Lng: -83.316556),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 500 (year 2015),  Truck Traffic: 2%,  Average Future Daily Traffic: 743 (year 2035),  Features Intersected: SASHABAW CREEK,  Facility Carried by Structure: SHADOW CREEK BLVD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 34 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 0.0m,  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 67.1m (220.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14272,  Location: ORION TWP SEC 29 (Lat: 42.725000,  Lng: -83.299256),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 500 (year 2018),  Average Future Daily Traffic: 600 (year 2038),  Design Load: HS 20,  Features Intersected: BROWN DRAIN,  Facility Carried by Structure: MUELLER RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.185,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.2m (7.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 784,  Location: PONTIAC TWP SEC 25 (Lat: 42.643436,  Lng: -83.219642),  Route carried "under" structure: State highway 59,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 81,056 (year 2007),  Truck Traffic: 3%,  Features Intersected: M-59,  Facility Carried by Structure: SQUIRREL RD NB
Minimum Vertical Clearance: 6.63m (21.75ft),  Kilometerpoint: 39.931,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 7999,  Location: @ (M-59) E OF PONTIAC (Lat: 42.641744,  Lng: -83.238242),  Route carried "under" structure: State highway 59,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 76,232 (year 2007),  Truck Traffic: 3%,  Features Intersected: M-59,  Facility Carried by Structure: I-75 NB
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 38.391,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.8m (81.4ft)

Find on map >>   Show street view

Structure Number: 8,  Location: EAST OF PONTIAC (M-59) (Lat: 42.641494,  Lng: -83.238597),  Route carried "under" structure: State highway 59,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 38,730 (year 2007),  Truck Traffic: 4%,  Features Intersected: M-59,  Facility Carried by Structure: I-75 SB
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 38.362,  Lanes on structure: 5,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.8m (81.4ft)

Find on map >>   Show street view

Structure Number: 8001,  Location: 0.4 MI N.OF M-59 (Lat: 42.649333,  Lng: -83.238100),  Route carried "under" structure: Interstate 75,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 150,290 (year 2007),  Truck Traffic: 4%,  Features Intersected: I-75,  Facility Carried by Structure: FEATHERSTONE RD EB
Minimum Vertical Clearance: 6.12m (20.08ft),  Kilometerpoint: 30.699,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 8002,  Location: 0.4 MI N. OF M-59 (Lat: 42.649328,  Lng: -83.238453),  Route carried "under" structure: Interstate 75,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 150,290 (year 2007),  Truck Traffic: 4%,  Features Intersected: I-75,  Facility Carried by Structure: FEATHERSTONE RD WB
Minimum Vertical Clearance: 6.35m (20.83ft),  Kilometerpoint: 30.812,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 8004,  Location: 2.0 MI N OF M-59 (Lat: 42.670944,  Lng: -83.241017),  Route carried "under" structure: City street 2059,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2009),  Features Intersected: PONTIAC RD,  Facility Carried by Structure: I-75 NB
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 1.128,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 8005,  Location: 2.5 MI N OF M-59 (Lat: 42.678531,  Lng: -83.241014),  Route carried "under" structure: Interstate 75,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 122,626 (year 2007),  Truck Traffic: 4%,  Features Intersected: I-75,  Facility Carried by Structure: WALTON BLVD
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 33.971,  Lanes on structure: 5,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 31.0m (101.7ft)

Find on map >>   Show street view

Structure Number: 8006,  Location: @ I-75 , M-24 (Lat: 42.683569,  Lng: -83.243297),  Route carried "under" structure: Business Interstate 75,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 26,340 (year 2007),  Truck Traffic: 2%,  Features Intersected: I-75 BL & M-24
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.457,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 8007,  Location: @ I-75 , M-24 (Lat: 42.683347,  Lng: -83.243556),  Route carried "under" structure: Business Interstate 75,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 20,500 (year 2009),  Truck Traffic: 32%,  Features Intersected: M-24 & I-75 BL
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.425,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 8008,  Location: @ M-24 (I-75 SB TO M-24) (Lat: 42.692044,  Lng: -83.250936),  Route carried "under" structure: Interstate 75,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 122,626 (year 2007),  Truck Traffic: 4%,  Features Intersected: I-75,  Facility Carried by Structure: M-24 CONN EB
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 35.701,  Lanes on structure: 1,  Lanes under structure: 9,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.0m (88.6ft)

Find on map >>   Show street view

Structure Number: 8009,  Location: @ M-24 (M-24 CONN TO I-75 (Lat: 42.692172,  Lng: -83.251047),  Route carried "under" structure: Interstate 75,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 122,626 (year 2007),  Truck Traffic: 4%,  Features Intersected: I-75,  Facility Carried by Structure: M-24 CONN WB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 35.719,  Lanes on structure: 1,  Lanes under structure: 9,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.0m (88.6ft)

Find on map >>   Show street view

Structure Number: 801,  Location: @ M-24(I-75 CONN TO M-24) (Lat: 42.693114,  Lng: -83.241681),  Route carried "under" structure: State highway 24,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 50,606 (year 2007),  Truck Traffic: 5%,  Features Intersected: M-24,  Facility Carried by Structure: I-75 CONN EB
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 1.579,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.3m (63.3ft)

Find on map >>   Show street view

Structure Number: 8011,  Location: @ M-24(I-75 CONN TO I-75 (Lat: 42.693278,  Lng: -83.241708),  Route carried "under" structure: State highway 24,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 50,606 (year 2007),  Truck Traffic: 5%,  Features Intersected: M-24,  Facility Carried by Structure: I-75 CONN WB
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 1.597,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.3m (63.3ft)

Find on map >>   Show street view

Structure Number: 8012,  Location: 0.8 MI NW OF M-24 (Lat: 42.695822,  Lng: -83.261847),  Route carried "under" structure: Interstate 75,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 99,082 (year 2007),  Truck Traffic: 4%,  Features Intersected: I-75,  Facility Carried by Structure: GIDDINGS RD
Minimum Vertical Clearance: 6.32m (20.73ft),  Kilometerpoint: 36.791,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 8013,  Location: 2.0 MI NW OF M-24 (JOSLYN (Lat: 42.701697,  Lng: -83.284144),  Route carried "under" structure: County highway 2059,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 1974),  Features Intersected: JOSLYN RD,  Facility Carried by Structure: I-75 NB
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 5.609,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 8014,  Location: 2.0 MI NW OF M-24 (JOSLYN (Lat: 42.701331,  Lng: -83.283983),  Route carried "under" structure: County highway 2059,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 0000),  Features Intersected: JOSLYN RD,  Facility Carried by Structure: I-75 SB
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 5.567,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 8015,  Location: 3.1 MI NW OF M-24 (Lat: 42.705181,  Lng: -83.306733),  Route carried "under" structure: Interstate 75,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 92,116 (year 2007),  Truck Traffic: 5%,  Features Intersected: I-75,  Facility Carried by Structure: NB BALDWIN RD
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 40.745,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.9m (117.8ft)

Find on map >>   Show street view

Structure Number: 8016,  Location: 4.1MI SE OF M-15 (Lat: 42.721142,  Lng: -83.349311),  Route carried "under" structure: County highway 2059,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 4,060 (year 1974),  Features Intersected: CLINTONVILLE RD,  Facility Carried by Structure: I-75 NB
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 3.817,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.8m (58.4ft)

Find on map >>   Show street view

Structure Number: 8017,  Location: 4.1 MI SE OF M-15 (Lat: 42.720778,  Lng: -83.349300),  Route carried "under" structure: County highway 2059,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 4,060 (year 1974),  Features Intersected: CLINTONVILLE RD,  Facility Carried by Structure: I-75 SB
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 3.777,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.8m (58.4ft)

Find on map >>   Show street view

Structure Number: 8023,  Location: I-75 @ CHRYSLER DR. (Lat: 42.651861,  Lng: -83.238219),  Route carried "under" structure: Interstate 75,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 150,290 (year 2007),  Truck Traffic: 4%,  Features Intersected: I-75 RAMP B & I-75
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 30.987,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 8024,  Location: I-75 @ CHRYSLER DR. (Lat: 42.655583,  Lng: -83.239250),  Route carried "under" structure: Interstate 75,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 150,290 (year 2007),  Truck Traffic: 4%,  Features Intersected: I-75 RAMP C & I-75
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 31.411,  Lanes on structure: 1,  Lanes under structure: 9,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 8025,  Location: 3.1 MI NW OF M-24 (Lat: 42.705181,  Lng: -83.307053),  Route carried "under" structure: Interstate 75,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 85,740 (year 2007),  Truck Traffic: 5%,  Features Intersected: I-75,  Facility Carried by Structure: SB BALDWIN RD
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 40.771,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.9m (117.8ft)

Find on map >>   Show street view

Structure Number: 8086,  Location: 1.5 MI S OF M-59 (Lat: 42.620331,  Lng: -83.235389),  Route carried "under" structure: Interstate 75,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 129,500 (year 2012),  Truck Traffic: 5%,  Features Intersected: I-75,  Facility Carried by Structure: SOUTH BLVD
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 27.460,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.0m (160.8ft)

Find on map >>   Show street view

Structure Number: 8087,  Location: 0.5 MI S OF M-59 (Lat: 42.634519,  Lng: -83.238469),  Route carried "under" structure: Alternate State highway 59,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 1995),  Truck Traffic: 5%,  Features Intersected: OLD M-59 (AUBURN RD),  Facility Carried by Structure: I-75 NB
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 4.337,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 8088,  Location: 0.5 MI S OF M-59 (Lat: 42.634581,  Lng: -83.238825),  Route carried "under" structure: Alternate State highway 59,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 1995),  Truck Traffic: 5%,  Features Intersected: OLD M-59 (AUBURN RD),  Facility Carried by Structure: I-75 SB
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 4.307,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 12831,  Location: PONTIAC TWP SEC 25 (Lat: 42.643392,  Lng: -83.220025),  Route carried "under" structure: State highway 59,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 81,056 (year 2007),  Truck Traffic: 3%,  Features Intersected: M-59,  Facility Carried by Structure: SQUIRREL RD SB
Minimum Vertical Clearance: 6.20m (20.34ft),  Kilometerpoint: 39.899,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 12875,  Location: AUBURN RD @ I-75 (Lat: 42.628903,  Lng: -83.238269),  Route carried "under" structure: Interstate 75,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 141,754 (year 2007),  Truck Traffic: 10%,  Features Intersected: I-75,  Facility Carried by Structure: CLINTON RIVERTRAIL
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 4.337,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 13196,  Location: 2.0 MI N OF M-59 (Lat: 42.669553,  Lng: -83.241361),  Route carried "under" structure: City street 2059,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2009),  Features Intersected: PONTIAC ROAD,  Facility Carried by Structure: I-75 SB
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 1.099,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.1m (62.7ft)

Find on map >>   Show street view

Structure Number: 13198,  Location: 1.6 MI N OF M-59 (Lat: 42.665750,  Lng: -83.241189),  Route carried "under" structure: Interstate 75,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 139,794 (year 2007),  Truck Traffic: 7%,  Features Intersected: I-75,  Facility Carried by Structure: UNIVERSITY DRIVE
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 32.563,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.8m (117.5ft)

Discuss Auburn Hills, Michigan (MI) on our hugely popular Michigan forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.