Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Auburntown, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 41Number of bridges
  • 243ft / 73.7mTotal length
  • $12,351,000Total costs
  • 28,309Total average daily traffic
  • 1,771Total average daily truck traffic
  • 47,287Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Auburntown
  • No street view available for this location

New bridges in Auburntown, TN - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21930-1939
  • 31940-1949
  • 101950-1959
  • 121960-1969
  • 31970-1979
  • 51980-1989
  • 11990-1999
  • 22000-2009
  • 22010-2019
Reconstructed bridges in Auburntown, TN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 41980-1989
  • 11990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Auburntown, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.7%Excellent
  • 3.7%Very good
  • 29.6%Good
  • 37.0%Satisfactory
  • 18.5%Fair
  • 7.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.7%Excellent
  • 3.7%Very good
  • 33.3%Good
  • 25.9%Satisfactory
  • 33.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.7%Excellent
  • 25.9%Good
  • 40.7%Satisfactory
  • 25.9%Fair
  • 3.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.2%Very good
  • 65.9%Good
  • 19.5%Satisfactory
  • 2.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 71.4%Good
  • 21.4%Satisfactory
  • 7.1%Fair
Find on map >>   Show street view

Structure Number: 8021470001,  Location: .1 MI EAST OF SR96 (Lat: 35.962950,  Lng: -86.074911),  Route carried "on" structure: County highway 2147,  Year Built: 1958,  Status: Posted for load,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 291 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 466 (year 2042),  Design Load: H 15,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.475,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80A0010001,  Location: 2 MI NORTH OF SR96 (Lat: 35.952217,  Lng: -86.116217),  Route carried "on" structure: County highway 1,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 80 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 128 (year 2041),  Features Intersected: MARSHALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.018,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $358,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $538,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80A0020001,  Location: 2.2 MI NORTH OF SR96 (Lat: 35.952950,  Lng: -86.120667),  Route carried "on" structure: County highway 2,  Year Built: 1960,  Status: Posted for load,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2041),  Features Intersected: MARSHALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.7m (25.3ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.77m (2.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $99,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $149,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80A0040001,  Location: 2.2 MI NORTH OF SR96 (Lat: 35.955267,  Lng: -86.128050),  Route carried "on" structure: County highway 4,  Year Built: 1960,  Status: Posted for load,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 80 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 128 (year 2041),  Features Intersected: MARSHALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.074,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 19.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $452,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80A0080001,  Location: OFF SR145 S OF AUBURNTOWN (Lat: 35.929350,  Lng: -86.095539),  Route carried "on" structure: County highway 8,  Year Built: 1965,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 32 (year 2041),  Features Intersected: SANDERS FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.6m (11.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.2m (23.6ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 3.6m (11.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $177,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $266,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80A0090001,  Location: OFF SR145 S OF AUBURNTOWN (Lat: 35.920850,  Lng: -86.101111),  Route carried "on" structure: County highway 9,  Year Built: 1965,  Status: Posted for load,  Structure Length: 1.82m (5.97ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 32 (year 2041),  Features Intersected: SANDERS FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.2m (23.6ft),  Curb-To-Curb Width: 3.0m (9.8ft),  Out-to-Out Width: 3.0m (9.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 4.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $432,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $649,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 80A0130001,  Location: OFF SR145 S OF AUBURNTOWN (Lat: 35.911517,  Lng: -86.101700),  Route carried "on" structure: County highway 13,  Year Built: 1965,  Status: Posted for load,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 32 (year 2041),  Features Intersected: SAUNDERS FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.013,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 3.5m (11.5ft),  Out-to-Out Width: 3.5m (11.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 15.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.17m (7.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $601,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80A0140001,  Location: OFF SR145 S OF AUBURNTOWN (Lat: 35.909300,  Lng: -86.102117),  Route carried "on" structure: County highway 14,  Year Built: 1965,  Status: Posted for load,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 32 (year 2041),  Features Intersected: SAUNDERS FORK CREEK,  Facility Carried by Structure: NFA A013
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.026,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.2m (23.6ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 14.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.36m (4.46ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: March 2021,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $377,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80A0200001,  Location: .22MI FROM WILSON CO LI (Lat: 35.966700,  Lng: -86.087539),  Route carried "on" structure: County highway 20,  Year Built: 1993,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 220 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 352 (year 2041),  Design Load: HS 20,  Features Intersected: FODDERSTACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.399,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 80A0210001,  Location: 1MI NORTH OF SR96 (Lat: 35.952561,  Lng: -86.109469),  Route carried "on" structure: City street 21,  Year Built: 1950,  Status: Posted for load,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 270 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 432 (year 2041),  Features Intersected: MARSHALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.936,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 34.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.88m (9.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $556,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $835,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80A0220001,  Location: 3MI NORTH OF SR96 (Lat: 35.956667,  Lng: -86.138950),  Route carried "on" structure: County highway 22,  Year Built: 1940,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 80 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 128 (year 2041),  Features Intersected: MARSHALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.105,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 3.9m (12.8ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $83,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $125,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80A0230001,  Location: 05MI WEST OF SR96 (Lat: 35.951967,  Lng: -86.092183),  Route carried "on" structure: City street 23,  Year Built: 1985,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 160 (year 2041),  Design Load: HS 20,  Features Intersected: SAUNDERS FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.026,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80A0230003,  Location: .5MI EAST OF SR96 (Lat: 35.959900,  Lng: -86.071300),  Route carried "on" structure: County highway 23,  Year Built: 1984,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 30 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 48 (year 2041),  Design Load: HS 20,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.356,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 77.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80A0280001,  Location: .03 MI EAST OF SR145 (Lat: 35.936033,  Lng: -86.091617),  Route carried "on" structure: County highway 28,  Year Built: 1930,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 32 (year 2041),  Design Load: H 10,  Features Intersected: SAUNDERS FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.035,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $165,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $248,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80A0330001,  Location: .02 MI EAST OF SR145 (Lat: 35.902417,  Lng: -86.101817),  Route carried "on" structure: County highway 33,  Year Built: 1920,  Status: Posted for load,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 160 (year 2041),  Features Intersected: SAUNDERS FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.029,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 18.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $359,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $539,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80A0340001,  Location: .13 MI EAST OF SR145 (Lat: 35.892983,  Lng: -86.101133),  Route carried "on" structure: County highway 34,  Year Built: 1984,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 170 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 272 (year 2041),  Design Load: HS 20,  Features Intersected: SANDERS FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80A0340003,  Location: .13 MI FROM SR145 (Lat: 35.892783,  Lng: -86.100317),  Route carried "on" structure: County highway 34,  Year Built: 1984,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 170 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 272 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.208,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80A0530001,  Location: 3MI EAST OF SR145 (Lat: 35.901983,  Lng: -86.067100),  Route carried "on" structure: County highway 53,  Year Built: 1949,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 10 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 16 (year 2041),  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.697,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 3.6m (11.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $99,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $149,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80A0540001,  Location: 3MI WEST OF SR53 (Lat: 35.946583,  Lng: -86.029717),  Route carried "on" structure: County highway 54,  Year Built: 2006,  Status: Posted for load,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 180 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 288 (year 2041),  Design Load: HS 15,  Features Intersected: SPOUT SPRINGS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.716,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 27.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $34,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $52,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80A2910001,  Location: SOUTH OF AUBURNTOWN (Lat: 35.945900,  Lng: -86.068217),  Route carried "on" structure: County highway 291,  Year Built: 1965,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 32 (year 2042),  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.159,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 30.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $285,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $428,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80A2920001,  Location: SOUTH OF AUBURNTOWN (Lat: 35.935967,  Lng: -86.073500),  Route carried "on" structure: County highway 292,  Year Built: 2006,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 32 (year 2041),  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 19.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $296,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $445,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80A2930001,  Location: SOUTH OF AUBURNTOWN (Lat: 35.931950,  Lng: -86.074817),  Route carried "on" structure: County highway 293,  Year Built: 1965,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 32 (year 2042),  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.008,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 3.6m (11.8ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 6.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 4.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $278,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $418,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80A2950001,  Location: SOUTH OF AUBURNTOWN (Lat: 35.921667,  Lng: -86.071917),  Route carried "on" structure: County highway 295,  Year Built: 2011,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 32 (year 2039),  Design Load: HL 93,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.0m (16.4ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 80A3160001,  Location: NEAR AUBURNTOWN (Lat: 35.941983,  Lng: -86.109633),  Route carried "on" structure: County highway 316,  Year Built: 2019,  Status: Open,  Structure Length: 1.79m (5.87ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 32 (year 2041),  Design Load: HL 93,  Features Intersected: LEACH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.346,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.6m (51.2ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $112,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $169,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8SR0960001,  Location: 1 MI.E.OF RUTHERFORD CO. (Lat: 35.937117,  Lng: -86.138000),  Route carried "on" structure: State highway 96,  Year Built: 1979,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,657 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,544 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.545,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 8SR0960005,  Location: EAST OF AUBURNTOWN (Lat: 35.950583,  Lng: -86.101467),  Route carried "on" structure: State highway 96,  Year Built: 1979,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 3,271 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,904 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: MARSHALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.182,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $441,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $662,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8SR1450001,  Location: 1.3 MI.NW.OF WOODBURY (Lat: 35.844200,  Lng: -86.094433),  Route carried "on" structure: State highway 145,  Year Built: 1930,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,060 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,920 (year 2041),  Design Load: HS 20,  Features Intersected: RUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.309,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $187,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8SR1450007,  Location: 2.5 MI.S.OF AUBURNTOWN (Lat: 35.906517,  Lng: -86.103867),  Route carried "on" structure: State highway 145,  Year Built: 1951,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 880 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,408 (year 2041),  Design Load: H 15,  Features Intersected: MINGLE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.720,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $64,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $97,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8SR1450009,  Location: 2 MI.S.OF AUBURNTOWN (Lat: 35.915333,  Lng: -86.103200),  Route carried "on" structure: State highway 145,  Year Built: 1952,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 880 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,456 (year 2041),  Design Load: H 15,  Features Intersected: MCKNIGHT BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.750,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $52,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $79,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8SR1450011,  Location: .1 MI S OF SR96 (Lat: 35.944333,  Lng: -86.095300),  Route carried "on" structure: State highway 145,  Year Built: 1951,  Year Reconstructed: 1988,  Status: Posted for load,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 880 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,456 (year 2041),  Design Load: H 15,  Features Intersected: CARTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.420,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8SR1450013,  Location: IN AUBURNTOWN CITY LIMITS (Lat: 35.948533,  Lng: -86.094833),  Route carried "on" structure: State highway 145,  Year Built: 1988,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 880 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,456 (year 2041),  Design Load: HS 20,  Features Intersected: MARSHALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.015,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 95020250011,  Location: 0.3 MI N SR96 (Lat: 35.992000,  Lng: -86.044667),  Route carried "on" structure: County highway 2025,  Year Built: 1960,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 117 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 192 (year 2040),  Features Intersected: PURTLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $177,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $266,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 950A0700001,  Location: 0.8 MI N OF CANNON CO. (Lat: 35.967483,  Lng: -86.139650),  Route carried "on" structure: County highway 70,  Year Built: 1940,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 300 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 480 (year 2040),  Design Load: H 10,  Features Intersected: KENNEDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.592,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $183,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $275,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 950A0700003,  Location: 1.3 MI N OF CANNON CO. (Lat: 35.972817,  Lng: -86.125150),  Route carried "on" structure: County highway 70,  Year Built: 1975,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 300 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 480 (year 2040),  Design Load: H 20,  Features Intersected: KENNEDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.138,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 950A2870001,  Location: 2.5 MI NE OF JCT SR267&96 (Lat: 36.013817,  Lng: -86.062650),  Route carried "on" structure: County highway 287,  Year Built: 1950,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 80 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 128 (year 2040),  Features Intersected: JOHNSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.006,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $69,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $104,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 950A2940001,  Location: 1 MI N E JCT SR96&SR267 (Lat: 35.989117,  Lng: -86.061683),  Route carried "on" structure: County highway 294,  Year Built: 1955,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 70 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 112 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.895,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 95S61610001,  Location: .5 M NW JCT SR96&SR267 (Lat: 35.984233,  Lng: -86.073917),  Route carried "on" structure: State highway 267,  Year Built: 1953,  Year Reconstructed: 1992,  Status: Posted for load,  Structure Length: 5.64m (18.50ft),  Average Daily Traffic: 426 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 784 (year 2040),  Design Load: H 15,  Features Intersected: SMITH FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.64m (18.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $840,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $1,261,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 95SR0960001,  Location: .2 M N CANNON CO LINE (Lat: 35.967833,  Lng: -86.077050),  Route carried "on" structure: State highway 96,  Year Built: 1956,  Year Reconstructed: 1963,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 3,808 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,664 (year 2040),  Design Load: HS 20,  Features Intersected: KENNEDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $377,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 95SR0960003,  Location: .1 M NE JCT SR96&SR267 (Lat: 35.976567,  Lng: -86.070667),  Route carried "on" structure: State highway 96,  Year Built: 1963,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 3,233 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,173 (year 2041),  Design Load: HS 20,  Features Intersected: SAUNDERS FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.497,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Very good,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.16m (23.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,434,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $2,152,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 95SR0960005,  Location: 1.9 M NE JCT SR96&SR267 (Lat: 35.988600,  Lng: -86.040200),  Route carried "on" structure: State highway 96,  Year Built: 1956,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 3,233 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,440 (year 2041),  Design Load: HS 20,  Features Intersected: SMITH FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.683,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.16m (23.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $299,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $449,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Auburntown, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.