Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Baldwyn, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 47Number of bridges
  • 646ft / 197mTotal length
  • $1,517,879,000Total costs
  • 116,662Total average daily traffic
  • 12,596Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Baldwyn
  • No street view available for this location

New bridges in Baldwyn, MS - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 11950-1959
  • 61960-1969
  • 31970-1979
  • 31980-1989
  • 251990-1999
  • 42000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Baldwyn, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.9%Excellent
  • 8.6%Very good
  • 65.7%Good
  • 20.0%Satisfactory
  • 2.9%Imminent failure
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.7%Excellent
  • 45.7%Very good
  • 31.4%Good
  • 8.6%Satisfactory
  • 5.7%Fair
  • 2.9%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.7%Excellent
  • 22.9%Very good
  • 42.9%Good
  • 8.6%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.6%Excellent
  • 23.7%Very good
  • 23.7%Good
  • 36.8%Satisfactory
  • 10.5%Fair
  • 2.6%Poor
Find on map >>   Show street view

Structure Number: 21000450412409,  Location: 2.2 MI N SR 348 (Lat: 34.468717,  Lng: -88.663025),  Route carried "on" structure: US 45,  Year Built: 1991,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 14,000 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 18,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CAMPBELLTOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.945,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 21000450412410A,  Location: 2.3 MI N SR 348 (Lat: 34.470064,  Lng: -88.663064),  Route carried "on" structure: US 45,  Year Built: 1991,  Status: Open,  Structure Length: 5.25m (17.22ft),  Average Daily Traffic: 7,000 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 9,000 (year 2040),  Design Load: HS 20,  Features Intersected: CAMPBELLTOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.337,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 61.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000450412410B,  Location: 2.3 MI N SR 348 (Lat: 34.469589,  Lng: -88.662847),  Route carried "on" structure: US 45,  Year Built: 1991,  Status: Open,  Structure Length: 5.25m (17.22ft),  Average Daily Traffic: 7,000 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 9,000 (year 2040),  Design Load: HS 20,  Features Intersected: CAMPBELLTOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.043,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000450412418,  Location: 2.9 MI N SR 348 (Lat: 34.485397,  Lng: -88.649153),  Route carried "on" structure: State highway 145,  Year Built: 1937,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 3,800 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,800 (year 2040),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.788,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 21000450412434A,  Location: 0.5 MI S SR 370 (Lat: 34.503983,  Lng: -88.661414),  Route carried "on" structure: US 45,  Year Built: 1991,  Status: Open,  Structure Length: 9.94m (32.61ft),  Average Daily Traffic: 7,000 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 9,000 (year 2040),  Design Load: HS 20,  Features Intersected: OKEELALA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.571,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 46.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000450412434B,  Location: 0.5 MI S SR 370 (Lat: 34.502858,  Lng: -88.661169),  Route carried "on" structure: US 45,  Year Built: 1991,  Status: Open,  Structure Length: 9.94m (32.61ft),  Average Daily Traffic: 7,000 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 9,000 (year 2040),  Design Load: HS 20,  Features Intersected: OKEELALA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.738,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000450592451,  Location: 1.5 MI N LEE CL (Lat: 34.530667,  Lng: -88.632539),  Route carried "on" structure: State highway 145,  Year Built: 1937,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 2,900 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,900 (year 2040),  Design Load: HS 15,  Features Intersected: TOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.424,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 55.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $315,000,000,  Roadway Improvement Cost: $32,000,000,  Total Project Cost: $939,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21000450592452,  Location: 1.6 MI N LEE CL (Lat: 34.532486,  Lng: -88.632439),  Route carried "on" structure: State highway 145,  Year Built: 1937,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,900 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,900 (year 2040),  Design Load: HS 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.626,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 55.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $115,000,000,  Roadway Improvement Cost: $12,000,000,  Total Project Cost: $360,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31000300590582,  Location: SR 30 OVER US 45 (Lat: 34.574297,  Lng: -88.636117),  Route carried "on" structure: State highway 30,  Year Built: 1992,  Status: Open,  Structure Length: 9.52m (31.23ft),  Average Daily Traffic: 1,700 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,700 (year 2040),  Design Load: HS 20,  Features Intersected: US 45
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.060,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 51.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31001450412406,  Location: 1.7 MI N SR 348 (Lat: 34.469817,  Lng: -88.656117),  Route carried "on" structure: State highway 145,  Year Built: 2005,  Status: Open,  Structure Length: 7.98m (26.18ft),  Average Daily Traffic: 2,600 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,600 (year 2040),  Design Load: HS 20,  Features Intersected: CAMPBELLTOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.947,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31001450412425,  Location: 0.9 MI S SR 370 (Lat: 34.495369,  Lng: -88.644136),  Route carried "on" structure: State highway 145,  Year Built: 2005,  Status: Open,  Structure Length: 6.18m (20.28ft),  Average Daily Traffic: 3,800 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,800 (year 2040),  Design Load: HS 20,  Features Intersected: OKEELALA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.989,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31001450412426,  Location: 0.8 MI S SR 370 (Lat: 34.496950,  Lng: -88.643150),  Route carried "on" structure: US 145,  Year Built: 2005,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 3,800 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,800 (year 2040),  Design Load: HS 20,  Features Intersected: OKEELALA CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.185,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Very good,  Culverts: Good,  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 31003660590015,  Location: 1.5 MI E SR 370 (Lat: 34.515703,  Lng: -88.570522),  Route carried "on" structure: State highway 366,  Year Built: 1994,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 550 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 550 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: DUGER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.469,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020
Find on map >>   Show street view

Structure Number: 31003660590017,  Location: 1.7 MI E SR 370 (Lat: 34.516472,  Lng: -88.567064),  Route carried "on" structure: State highway 366,  Year Built: 1993,  Status: Open,  Structure Length: 2.79m (9.15ft),  Average Daily Traffic: 550 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 550 (year 2040),  Design Load: HS 20,  Features Intersected: DUGER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.803,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31003700410535,  Location: 0.4 MI W US 45 (Lat: 34.509114,  Lng: -88.667664),  Route carried "on" structure: State highway 370,  Year Built: 1956,  Status: Posted for load,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 1,600 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,600 (year 2040),  Design Load: H 15,  Features Intersected: OKEELALA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.149,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $54,000,000,  Roadway Improvement Cost: $130,000,000,  Total Project Cost: $213,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31003700410539A,  Location: SR 370 OVER US 45 (Lat: 34.509136,  Lng: -88.660731),  Route carried "on" structure: State highway 370,  Year Built: 1991,  Status: Open,  Structure Length: 9.40m (30.84ft),  Average Daily Traffic: 800 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 800 (year 2040),  Design Load: HS 20,  Features Intersected: US 45
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.439,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31003700410539B,  Location: SR 370 OVER US 45 (Lat: 34.508958,  Lng: -88.661733),  Route carried "on" structure: State highway 370,  Year Built: 1991,  Status: Open,  Structure Length: 9.40m (30.84ft),  Average Daily Traffic: 800 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 800 (year 2040),  Design Load: HS 20,  Features Intersected: US 45
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.695,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3100370041057,  Location: 1.5 MI E SR 145 (Lat: 34.509425,  Lng: -88.608975),  Route carried "on" structure: State highway 370,  Year Built: 1996,  Status: Open,  Structure Length: 8.28m (27.17ft),  Average Daily Traffic: 2,300 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,300 (year 2040),  Design Load: HS 20,  Features Intersected: TWENTY MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.064,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31003700410573,  Location: 1.8 MI E SR 145 (Lat: 34.509381,  Lng: -88.603803),  Route carried "on" structure: State highway 370,  Year Built: 1996,  Status: Open,  Structure Length: 8.58m (28.15ft),  Average Daily Traffic: 2,300 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,300 (year 2040),  Design Load: HS 20,  Features Intersected: TWENTY MILE CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.541,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31003700410575,  Location: 2.0 MI E SR 145 (Lat: 34.509178,  Lng: -88.599475),  Route carried "on" structure: State highway 370,  Year Built: 1962,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 2,300 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,300 (year 2040),  Design Load: H 15,  Features Intersected: SILVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.940,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 51.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020
Find on map >>   Show street view

Structure Number: 310037004106,  Location: 2.5 MI S SR 366 (Lat: 34.477494,  Lng: -88.583506),  Route carried "on" structure: State highway 370,  Year Built: 1962,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,000 (year 2040),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.970,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 39.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 31003700410617,  Location: 1.5 MI W ITAWAMBA CL (Lat: 34.465483,  Lng: -88.568758),  Route carried "on" structure: State highway 370,  Year Built: 1993,  Status: Open,  Structure Length: 3.71m (12.17ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,400 (year 2040),  Design Load: HS 20,  Features Intersected: DUGGER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.313,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA4100000000009,  Location: SEC 11 T 7S R 6E B (Lat: 34.480000,  Lng: -88.641389),  Route carried "on" structure: County highway 110,  Year Built: 1983,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 680 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,020 (year 2035),  Design Load: HS 15,  Features Intersected: CAMPBELLTOWN CREEK BR,  Facility Carried by Structure: CR 2788
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 49.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA4100000000011,  Location: SEC 11 T 7S R 6E (Lat: 34.490389,  Lng: -88.640861),  Route carried "on" structure: County highway 1402,  Year Built: 1999,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 100 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 120 (year 2035),  Design Load: HS 20,  Features Intersected: OKEELALA CREEK,  Facility Carried by Structure: SANDHILL AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA4100000000012,  Location: SEC 12 T 7S R 6E B (Lat: 34.479861,  Lng: -88.631056),  Route carried "on" structure: County highway 110,  Year Built: 1965,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 680 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,020 (year 2040),  Design Load: HS 15,  Features Intersected: CAMPBELLTOWN CREEK BR,  Facility Carried by Structure: CR 2788
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.218,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA4100000000014,  Location: SEC 15 T 7S R 6E B (Lat: 34.469833,  Lng: -88.666278),  Route carried "on" structure: County highway 1307,  Year Built: 1990,  Status: Posted for load,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 240 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 360 (year 2043),  Features Intersected: CAMPBELLTOWN CREEK,  Facility Carried by Structure: MITCHELL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 20.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $551,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA4100000000017,  Location: SEC 24 T 7S R 6E B (Lat: 34.464164,  Lng: -88.619783),  Route carried "on" structure: County highway 1412,  Year Built: 1974,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 580 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 870 (year 2035),  Design Load: HS 15,  Features Intersected: OKEELALA CREEK,  Facility Carried by Structure: CR 1275
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.218,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 66.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA410000000002,  Location: SEC 7 T 7S R 7E B (Lat: 34.480278,  Lng: -88.605833),  Route carried "on" structure: County highway 110,  Year Built: 1996,  Status: Open,  Structure Length: 8.90m (29.20ft),  Average Daily Traffic: 140 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 210 (year 2035),  Design Load: HS 20,  Features Intersected: TWENTY MILE CREEK,  Facility Carried by Structure: CR 2788
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.632,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA4100000000023,  Location: SEC 19 T 7S R 7E (Lat: 34.462972,  Lng: -88.600639),  Route carried "on" structure: County highway 120,  Year Built: 1966,  Status: Closed,  Structure Length: 12.65m (41.50ft),  Average Daily Traffic: 10 (year 2020),  Average Future Daily Traffic: 15 (year 2042),  Design Load: H 15,  Features Intersected: TWENTY MILE CREEK,  Facility Carried by Structure: CR 1213
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.574,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Imminent failure,  Superstructure: Imminent failure,  Substructure: Fair,  Channel: Fair,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 13.48m (44.23ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2022,  Critical Feature Inspection Date: October 2020,  Underwater Inspection Date: November 2016,  Bridge Improvement Cost: $1,195,000,  Roadway Improvement Cost: $956,000,  Total Project Cost: $2,151,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: SA4100000000024,  Location: SEC 20 T 7S R 7E B (Lat: 34.452389,  Lng: -88.577333),  Route carried "on" structure: County highway 926,  Year Built: 1972,  Status: Open,  Structure Length: 11.03m (36.19ft),  Average Daily Traffic: 220 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 330 (year 2043),  Features Intersected: TWENTY MILE CREEK,  Facility Carried by Structure: US 78
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.046,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.92m (39.11ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2021,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $1,122,000,  Roadway Improvement Cost: $898,000,  Total Project Cost: $2,020,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA410000000A013,  Location: SEC 14 T 7S R 6E (Lat: 34.471547,  Lng: -88.635697),  Route carried "on" structure: County highway 1305,  Year Built: 2020,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 40 (year 2013),  Average Future Daily Traffic: 60 (year 2038),  Design Load: HL 93,  Features Intersected: CAMPBELLTOWN CREEK,  Facility Carried by Structure: CR 941
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.345,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000075,  Location: SEC 4 T 6S R 6E B (Lat: 34.587600,  Lng: -88.665267),  Route carried "on" structure: County highway 346,  Year Built: 2000,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 80 (year 2016),  Average Future Daily Traffic: 120 (year 2036),  Design Load: HS 20,  Features Intersected: TWENTYMILE CREEK,  Facility Carried by Structure: COUNTY ROAD 7461
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.276,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000082,  Location: SEC 20 T 6S R 6E B (Lat: 34.545497,  Lng: -88.699806),  Route carried "on" structure: County highway 968,  Year Built: 1961,  Status: Posted for load,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 800 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,200 (year 2035),  Design Load: H 15,  Features Intersected: OKEELALA CREEK,  Facility Carried by Structure: CR 6100
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.242,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $208,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA5900000000083,  Location: SEC 25 T 6S R 6E (Lat: 34.531719,  Lng: -88.627944),  Route carried "on" structure: County highway 168,  Year Built: 1970,  Status: Posted for load,  Structure Length: 6.04m (19.82ft),  Average Daily Traffic: 360 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 540 (year 2036),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: NORTH SECOND ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.735,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $437,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $539,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000084,  Location: SEC 25 T 6S R 6E (Lat: 34.537533,  Lng: -88.627267),  Route carried "on" structure: County highway 169,  Year Built: 1968,  Status: Posted for load,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 30 (year 2015),  Average Future Daily Traffic: 45 (year 2035),  Design Load: H 10,  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: BURNS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.321,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 18.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $126,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $156,000 ( Estimate for 2016),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA5900000000085,  Location: SEC 25 T 6S R 6E (Lat: 34.537417,  Lng: -88.627222),  Route carried "on" structure: County highway 169,  Year Built: 1981,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 90 (year 2015),  Average Future Daily Traffic: 135 (year 2035),  Design Load: H 15,  Features Intersected: UNNAMED STREAM,  Facility Carried by Structure: BURNS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.482,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.1m (13.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 6.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Critical Feature Inspection Date: January 2022,  Bridge Improvement Cost: $103,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $127,000 ( Estimate for 2016),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: SA5900000000088,  Location: SEC 29 T 6S R 6E (Lat: 34.523600,  Lng: -88.699483),  Route carried "on" structure: County highway 275,  Year Built: 1998,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 22 (year 2016),  Average Future Daily Traffic: 33 (year 2036),  Design Load: HS 20,  Features Intersected: CAMPBELLTOWN CREEK,  Facility Carried by Structure: COUNTY ROAD 6200
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.321,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 70.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000091,  Location: SEC 19 T 6S R 7E (Lat: 34.548350,  Lng: -88.610317),  Route carried "on" structure: County highway 168,  Year Built: 1999,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 220 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 330 (year 2036),  Design Load: HS 20,  Features Intersected: TWENTYMILE CREEK,  Facility Carried by Structure: COUNTY ROAD 5210
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000092,  Location: SEC 21 T 6S R 7E (Lat: 34.545539,  Lng: -88.564361),  Route carried "on" structure: County highway 161,  Year Built: 1996,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 70 (year 2016),  Average Future Daily Traffic: 105 (year 2036),  Design Load: HS 20,  Features Intersected: DONIVAN CREEK,  Facility Carried by Structure: CR 5111
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.643,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000097,  Location: SEC 29 T 6S R 7E (Lat: 34.530944,  Lng: -88.583806),  Route carried "on" structure: County highway 174,  Year Built: 1982,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 80 (year 2015),  Average Future Daily Traffic: 120 (year 2035),  Design Load: H 10,  Features Intersected: DUGGER CREEK,  Facility Carried by Structure: CR 5226
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.321,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 18.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $103,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $127,000 ( Estimate for 2016),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: SA5900000000154,  Location: SEC_28_T 6S_R 6E B (Lat: 34.523556,  Lng: -88.681028),  Route carried "on" structure: County highway 275,  Year Built: 2012,  Status: Open,  Structure Length: 4.26m (13.98ft),  Average Daily Traffic: 120 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 180 (year 2035),  Design Load: HL 93,  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: CR 6200
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31000300590582,  Location: SR 30 OVER US 45 (Lat: 34.574250,  Lng: -88.635431),  Route carried "under" structure: US 45,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 6,500 (year 2017),  Truck Traffic: 8%,  Features Intersected: US 45,  Facility Carried by Structure: SR 30
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 7.657,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Discuss Baldwyn, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.