Bridge Statistics for Bartlesville, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 88Number of bridges
  • 1,056ft / 322mTotal length
  • $82,284,000Total costs
  • 270,363Total average daily traffic
  • 33,025Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bartlesville
  • No street view available for this location

New bridges in Bartlesville, OK - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 61930-1939
  • 41940-1949
  • 41950-1959
  • 41960-1969
  • 131970-1979
  • 261980-1989
  • 91990-1999
  • 102000-2009
  • 92010-2019
  • 12020-2022
Reconstructed bridges in Bartlesville, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 01980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Bartlesville, OK
Average Bridge Truck Traffic in Bartlesville, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.2%Very good
  • 48.3%Good
  • 36.2%Satisfactory
  • 6.9%Fair
  • 3.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 1.7%Excellent
  • 29.3%Very good
  • 27.6%Good
  • 20.7%Satisfactory
  • 15.5%Fair
  • 1.7%Poor
  • 1.7%Serious
  • 1.7%Critical
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.6%Very good
  • 24.1%Good
  • 22.4%Satisfactory
  • 27.6%Fair
  • 17.2%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.2%Excellent
  • 25.9%Very good
  • 22.2%Good
  • 28.4%Satisfactory
  • 18.5%Fair
  • 3.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 23.1%Very good
  • 46.2%Good
  • 23.1%Satisfactory
  • 7.7%Fair
Find on map >>   Show street view

Structure Number: 828,  Location: 2W 4.3S OF US 75 (Lat: 36.661217,  Lng: -95.971428),  Route carried "on" structure: County highway 7411,  Year Built: 1920,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,245 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,992 (year 2040),  Design Load: H 20,  Features Intersected: CREEK,  Facility Carried by Structure: 7420C MAJOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.594,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 23.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $241,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1352,  Location: COMANCHE AVE (Lat: 36.745783,  Lng: -95.961331),  Route carried "on" structure: City street E0188,  Year Built: 1923,  Status: Posted for load,  Structure Length: 9.66m (31.69ft),  Average Daily Traffic: 750 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,200 (year 2040),  Design Load: H 20,  Features Intersected: CANEY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 42.4m (139.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 37.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 11.48m (37.66ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2020,  Bridge Improvement Cost: $586,000,  Roadway Improvement Cost: $322,000,  Total Project Cost: $918,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4546,  Location: 1. W 2.3 S OF US 60 (Lat: 36.694006,  Lng: -95.953347),  Route carried "on" structure: County highway 7438C,  Year Built: 1935,  Status: Posted for load,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 900 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,440 (year 2040),  Design Load: H 15,  Features Intersected: RICE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.623,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 27.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 6.33m (20.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $323,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $516,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4794,  Location: 1.0 MI.W.WASH.CO.LN (Lat: 36.752256,  Lng: -96.017003),  Route carried "on" structure: US 60,  Year Built: 1936,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 3,500 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,600 (year 2040),  Design Load: H 20,  Features Intersected: ELIZA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.961,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Inventory Rating: 63.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 4914,  Location: 5. S 2.3 E OF US 60 (Lat: 36.655478,  Lng: -95.894636),  Route carried "on" structure: County highway E0250,  Year Built: 1936,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 49.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $98,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5521,  Location: 1.85 MI.NE OSAGE C/L (Lat: 36.753511,  Lng: -95.972031),  Route carried "on" structure: State highway 123,  Year Built: 1937,  Status: Posted for load,  Structure Length: 12.74m (41.80ft),  Average Daily Traffic: 4,600 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,360 (year 2040),  Design Load: H 15,  Features Intersected: CANEY RIVER
Minimum Vertical Clearance: 4.77m (15.65ft),  Kilometerpoint: 4.273,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 64.0m (210.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Channel: Good,  Operating Rating: 9.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 13.29m (43.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Other Special Inspection Date: April 2020,  Bridge Improvement Cost: $3,240,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $8,178,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6859,  Location: 5. S .3 E OF US 60 (Lat: 36.655489,  Lng: -95.932719),  Route carried "on" structure: County highway E0250,  Year Built: 1939,  Status: Posted for load,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 6863,  Location: 2.6 MI E OF US 60 (Lat: 36.742439,  Lng: -95.889842),  Route carried "on" structure: County highway E0190,  Year Built: 1939,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.79m (9.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $143,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 7384,  Location: 3E 10.9S OF US 60 (Lat: 36.570781,  Lng: -95.884372),  Route carried "on" structure: County highway 7452C,  Year Built: 1940,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 244 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 390 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.501,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Poor,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9734,  Location: 4.5 MI N OCHELAT (Lat: 36.665250,  Lng: -95.971428),  Route carried "on" structure: County highway 7411,  Year Built: 1941,  Status: Posted for load,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 1,245 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,992 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.240,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 28.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $196,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $311,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10508,  Location: 2.25 MI NE OSAGE C/L (Lat: 36.768650,  Lng: -95.959019),  Route carried "on" structure: State highway 123,  Year Built: 1946,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 4,500 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 7,200 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.698,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 11064,  Location: 1.9 MI S JCT US 60 (Lat: 36.707933,  Lng: -95.934981),  Route carried "on" structure: US 75,  Year Built: 1949,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 16,400 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 26,240 (year 2040),  Design Load: H 20,  Features Intersected: RICE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.424,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $308,000,  Roadway Improvement Cost: $509,000,  Total Project Cost: $863,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 12406,  Location: 1.3 MI N US 60 E (Lat: 36.747517,  Lng: -95.935289),  Route carried "on" structure: US 75,  Year Built: 1950,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 3.25m (10.66ft),  Average Daily Traffic: 22,600 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 36,160 (year 2040),  Design Load: H 20,  Features Intersected: TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.157,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 23.3m (76.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.42m (21.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,401,000,  Roadway Improvement Cost: $2,311,000,  Total Project Cost: $3,922,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13164,  Location: 9S.&1.5E. OF JCT US75&60E (Lat: 36.598656,  Lng: -95.914711),  Route carried "on" structure: County highway 7411,  Year Built: 1954,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 94 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 150 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: 7422C MAJOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.415,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13442,  Location: 2 MI E 0.3 MI S DEWEY (Lat: 36.779764,  Lng: -95.899178),  Route carried "on" structure: County highway 7404,  Year Built: 1955,  Status: Posted for load,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 118 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 189 (year 2040),  Design Load: HS 15,  Features Intersected: COON CREEK TRIB.,  Facility Carried by Structure: 7453C MAJOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.862,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.22m (13.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $215,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $342,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14187,  Location: .95 E S.H. 123(CANEY RIV. (Lat: 36.756433,  Lng: -95.957167),  Route carried "on" structure: City street 6112,  Year Built: 1958,  Status: Posted for load,  Structure Length: 9.48m (31.10ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 280 (year 2040),  Design Load: H 20,  Features Intersected: CANEY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.330,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Critical,  Substructure: Fair,  Channel: Fair,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 11.37m (37.30ft),  Designated Inspection Frequency: Every 6 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $580,000,  Roadway Improvement Cost: $319,000,  Total Project Cost: $909,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16202,  Location: 0.7 MI S OF PRICE RD (Lat: 36.702469,  Lng: -95.953403),  Route carried "on" structure: City street 6121,  Year Built: 1965,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 550 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 880 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16364,  Location: 1.4 MI N OF PRICE RD (Lat: 36.733936,  Lng: -95.953453),  Route carried "on" structure: City street 6121,  Year Built: 1965,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 3,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,800 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.058,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16544,  Location: 0.7 MI N BARTLESVILLE (Lat: 36.767778,  Lng: -95.989722),  Route carried "on" structure: City street 7409,  Year Built: 1965,  Status: Posted for load,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,600 (year 2040),  Design Load: H 20,  Features Intersected: BUTLER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 38.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 8.02m (26.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $410,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $636,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16559,  Location: N3934E0170001 (Lat: 36.770122,  Lng: -96.000631),  Route carried "on" structure: City street N3934,  Year Built: 1965,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 2,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,000 (year 2040),  Design Load: H 20,  Features Intersected: BUTTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 79.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.30m (27.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $424,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $659,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17682,  Location: 4 MI S 0.1 E OF US 60 (Lat: 36.670100,  Lng: -95.934850),  Route carried "on" structure: County highway 7411,  Year Built: 1970,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 746 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,194 (year 2040),  Features Intersected: CREEK,  Facility Carried by Structure: 7420C MAJOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.592,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 30.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 17864,  Location: 4. S .4 E OF US 75 (Lat: 36.669994,  Lng: -95.928322),  Route carried "on" structure: County highway 7411,  Year Built: 1970,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 746 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,194 (year 2040),  Features Intersected: FISH CREEK,  Facility Carried by Structure: 7420C MAJOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.592,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $480,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18066,  Location: 3.7 MI E OSAGE CO (Lat: 36.742425,  Lng: -95.935592),  Route carried "on" structure: US 60,  Year Built: 1971,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 18,800 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 30,080 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 75 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.017,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 24.9m (81.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 68.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,265,000,  Roadway Improvement Cost: $2,087,000,  Total Project Cost: $3,542,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18121,  Location: 2.1 MI E OSAGE C/L (Lat: 36.745678,  Lng: -95.961458),  Route carried "on" structure: US 60,  Year Built: 1971,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 18,800 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 30,080 (year 2040),  Design Load: HL 93,  Features Intersected: CANEY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.813,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.85m (35.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,367,000,  Roadway Improvement Cost: $3,906,000,  Total Project Cost: $6,628,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18122,  Location: 2.0 MI S OF US 60 (Lat: 36.723514,  Lng: -96.054544),  Route carried "on" structure: County highway 5762C,  Year Built: 1971,  Status: Open,  Structure Length: 9.20m (30.18ft),  Average Daily Traffic: 424 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 678 (year 2040),  Design Load: HS 20,  Features Intersected: SAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.688,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.19m (36.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $571,000,  Roadway Improvement Cost: $314,000,  Total Project Cost: $894,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18931,  Location: 2.4 MI. S. JCT. US60 (Lat: 36.704933,  Lng: -96.006192),  Route carried "on" structure: State highway 123,  Year Built: 1975,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 3,200 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,120 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.765,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1899,  Location: 1.3 MI E WASHINGTON (Lat: 36.742458,  Lng: -95.912803),  Route carried "on" structure: City street 6100,  Year Built: 1975,  Status: Posted for load,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 34.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19069,  Location: 0.6 MI. S JCT US60 (Lat: 36.729558,  Lng: -96.006972),  Route carried "on" structure: State highway 123,  Year Built: 1975,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 3,600 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,760 (year 2040),  Design Load: HS 20,  Features Intersected: ELIZA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.467,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.0m (42.7ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.58m (28.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,101,000,  Roadway Improvement Cost: $1,817,000,  Total Project Cost: $3,083,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19095,  Location: 1.5 MI. S. JCT. US60 (Lat: 36.719028,  Lng: -96.007444),  Route carried "on" structure: State highway 123,  Year Built: 1975,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 9.77m (32.05ft),  Average Daily Traffic: 3,200 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,120 (year 2040),  Design Load: HS 20,  Features Intersected: SAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.310,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.3m (43.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.57m (37.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $908,000,  Roadway Improvement Cost: $1,497,000,  Total Project Cost: $2,541,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19426,  Location: 2. E 1.7 S OF US 60 (Lat: 36.703181,  Lng: -95.899272),  Route carried "on" structure: County highway N3990,  Year Built: 1978,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 88 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 141 (year 2040),  Design Load: HS 20,  Features Intersected: FISH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.12m (13.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $335,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19623,  Location: 6.5 S 2.1 E OF US 75 (Lat: 36.633744,  Lng: -95.897622),  Route carried "on" structure: County highway 7411,  Year Built: 1979,  Status: Open,  Structure Length: 7.71m (25.30ft),  Average Daily Traffic: 70 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 112 (year 2040),  Design Load: HS 20,  Features Intersected: CANEY RIVER,  Facility Carried by Structure: 7422C MAJOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.338,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Good,  Operating Rating: 78.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.19m (33.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $520,000,  Roadway Improvement Cost: $286,000,  Total Project Cost: $813,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1963,  Location: 4S.&2.4W.OF JCT US75&US60 (Lat: 36.670150,  Lng: -95.978308),  Route carried "on" structure: County highway 7420C,  Year Built: 1979,  Status: Open,  Structure Length: 11.06m (36.29ft),  Average Daily Traffic: 726 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,162 (year 2040),  Design Load: H 20,  Features Intersected: CANEY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.088,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Inventory Rating: 56.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.33m (40.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $630,000,  Roadway Improvement Cost: $346,000,  Total Project Cost: $988,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19663,  Location: .5 MI E OF VIRGINIA (Lat: 36.757042,  Lng: -95.980803),  Route carried "on" structure: City street E0180,  Year Built: 2001,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 320 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19664,  Location: 4. S 2.5 E OF US 75 (Lat: 36.669939,  Lng: -95.888808),  Route carried "on" structure: County highway 7411,  Year Built: 1980,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 746 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,194 (year 2040),  Features Intersected: CREEK,  Facility Carried by Structure: 7420C MAJOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.949,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20007,  Location: 2. E 6.6 S OF US 75 (Lat: 36.630869,  Lng: -95.899544),  Route carried "on" structure: County highway 7411,  Year Built: 1982,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 80 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.718,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20187,  Location: 5. S 1.4 E OF US 60 (Lat: 36.655417,  Lng: -95.911111),  Route carried "on" structure: County highway E0250,  Year Built: 1982,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: FISH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 56.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $369,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20218,  Location: 4S .4E OF TEGARDEN (Lat: 36.739772,  Lng: -98.964783),  Route carried "on" structure: County highway E0190,  Year Built: 1982,  Status: Open,  Structure Length: 2.20m (7.22ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 240 (year 2040),  Design Load: HS 20,  Features Intersected: WHITE HORSE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.23m (17.16ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $267,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $426,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2022,  Location: .5N 1.1E OF US 60/SH156 (Lat: 36.695322,  Lng: -97.120586),  Route carried "on" structure: County highway E0220,  Year Built: 1982,  Status: Open,  Structure Length: 2.21m (7.25ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: HS 20,  Features Intersected: BOIS D'ARC CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.23m (17.16ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $267,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $426,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20222,  Location: 5.5NE OF COLCORD (Lat: 36.321978,  Lng: -94.664389),  Route carried "on" structure: County highway E0479,  Year Built: 1982,  Status: Open,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 20,  Features Intersected: CHEROKEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.0m (26.2ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.07m (16.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $259,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $413,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Bartlesville, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.