Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Bellevue, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 165Number of bridges
  • 4,610ft / 1,405mTotal length
  • $932,748,000Total costs
  • 7,301,988Total average daily traffic
  • 340,573Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bellevue
  • No street view available for this location

New bridges in Bellevue, WA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 31940-1949
  • 31950-1959
  • 441960-1969
  • 371970-1979
  • 91980-1989
  • 171990-1999
  • 212000-2009
  • 272010-2019
  • 32020-2022
Reconstructed bridges in Bellevue, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 21970-1979
  • 141980-1989
  • 141990-1999
  • 42000-2009
  • 12010-2019
Average Bridge Daily Traffic in Bellevue, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 26.4%Very good
  • 46.4%Good
  • 23.6%Satisfactory
  • 3.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.9%Very good
  • 54.5%Good
  • 22.7%Satisfactory
  • 1.8%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.7%Very good
  • 67.3%Good
  • 7.3%Satisfactory
  • 2.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 84.6%Very good
  • 7.7%Good
  • 7.7%Satisfactory
Find on map >>   Show street view

Structure Number: 89154,  Location: 0.1 N JCT NEWPORT KEY (Lat: 47.572797,  Lng: -122.188928),  Route carried "on" structure: City street 7530,  Year Built: 2019,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 250 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 250 (year 2040),  Design Load: HL 93,  Features Intersected: COAL CREEK,  Facility Carried by Structure: SKAGIT KEY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $245,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $490,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 89155,  Location: 0.2 W JCT CASCADE KEY (Lat: 47.570753,  Lng: -122.187158),  Route carried "on" structure: City street 7532,  Year Built: 2019,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 250 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 250 (year 2040),  Design Load: HL 93,  Features Intersected: COAL CREEK,  Facility Carried by Structure: GLACIER KEY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $231,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $462,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8918,  Location: 0.30 N NE 12TH ST (Lat: 47.624225,  Lng: -122.175089),  Route carried "on" structure: City street 75,  Year Built: 2019,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 15,540 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 32,000 (year 2037),  Design Load: HL 93,  Features Intersected: SOUND TRANSIT LIGHT RAIL,  Facility Carried by Structure: 124TH AVE NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 28.1m (92.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $984,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: QZ,  Location: 0.5 MI N OF JCT I-90 (Lat: 47.571244,  Lng: -122.104600),  Route carried "under" structure: City street 7020,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 13,900 (year 2019),  Truck Traffic: 3%,  Features Intersected: WEST LAKE SAMMAMISH PKWY,  Facility Carried by Structure: PED WALKWAY UC
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.001,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 7596A,  Location: 3.6 N JCT I-90 (Lat: 47.629778,  Lng: -122.188333),  Route carried "under" structure: Ramp Interstate 405,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,969 (year 2019),  Truck Traffic: 7%,  Features Intersected: N-W RAMP
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.290,  Lanes on structure: 6,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 7596B,  Location: 3.6 N JCT I-90 (Lat: 47.630056,  Lng: -122.188611),  Route carried "under" structure: Ramp Interstate 405,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 8,969 (year 2019),  Truck Traffic: 7%,  Features Intersected: N-W RAMP
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 0.322,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 7596C,  Location: JCT I-405 (Lat: 47.631914,  Lng: -122.187817),  Route carried "under" structure: State highway 520,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 105,102 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 520,  Facility Carried by Structure: I-405
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 11.185,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 7596D,  Location: JCT I-405 (Lat: 47.632056,  Lng: -122.188222),  Route carried "under" structure: State highway 520,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 105,102 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 520,  Facility Carried by Structure: I-405
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 11.153,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 7596F,  Location: JCT I-405 (Lat: 47.632917,  Lng: -122.189944),  Route carried "under" structure: State highway 520,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 84,448 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 520,  Facility Carried by Structure: N-W RAMP
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 10.992,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 7623B,  Location: 3.8 N JCT SR 900 (Lat: 47.557000,  Lng: -122.190333),  Route carried "under" structure: Interstate 405,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 150,388 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-405,  Facility Carried by Structure: LAKE WASHINGTON BV
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 14.903,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 7661A,  Location: 2.2 N JCT I-90 (Lat: 47.610036,  Lng: -122.189097),  Route carried "under" structure: Interstate 405,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 205,358 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-405,  Facility Carried by Structure: MAIN ST
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 21.420,  Lanes on structure: 4,  Lanes under structure: 14,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 7839B,  Location: 5.2 E JCT SR 513 (Lat: 47.639564,  Lng: -122.196267),  Route carried "under" structure: City street 520,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 15,083 (year 2010),  Truck Traffic: 5%,  Features Intersected: 108TH AVE NE
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.177,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 8190B,  Location: JCT I-405 (Lat: 47.579889,  Lng: -122.175278),  Route carried "under" structure: Interstate 90,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 77,138 (year 2019),  Truck Traffic: 4%,  Features Intersected: I-90 MAINLINE
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 15.933,  Lanes on structure: 1,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 8190C,  Location: 0.1 E JCT I-405 (Lat: 47.581111,  Lng: -122.172083),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 12,098 (year 2012),  Truck Traffic: 5%,  Features Intersected: S-W RAMP TO I-90,  Facility Carried by Structure: W-N RAMP TO I-405
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.290,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 8190D,  Location: 0.2 E JCT I-405 (Lat: 47.580611,  Lng: -122.168444),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 20,968 (year 2014),  Truck Traffic: 1%,  Features Intersected: W-S RAMP RICHARD RD,  Facility Carried by Structure: I-90
Minimum Vertical Clearance: 6.45m (21.16ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 8190E,  Location: JCT I-405 (Lat: 47.580778,  Lng: -122.173333),  Route carried "under" structure: Interstate 90,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 77,138 (year 2019),  Truck Traffic: 4%,  Features Intersected: I-90 MAINLINE
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 15.997,  Lanes on structure: 1,  Lanes under structure: 9,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.5m (146.0ft)

Find on map >>   Show street view

Structure Number: 8190F,  Location: JCT I-405 (Lat: 47.579389,  Lng: -122.174139),  Route carried "under" structure: Interstate 90,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 77,138 (year 2019),  Truck Traffic: 4%,  Features Intersected: I-90 FACTORIA,  Facility Carried by Structure: I-405
Minimum Vertical Clearance: 14.00m (45.93ft),  Kilometerpoint: 15.981,  Lanes on structure: 2,  Lanes under structure: 15,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.8m (133.9ft)

Find on map >>   Show street view

Structure Number: 8190G,  Location: JCT I-405 (Lat: 47.579900,  Lng: -122.174439),  Route carried "under" structure: Interstate 90,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 77,138 (year 2019),  Truck Traffic: 4%,  Features Intersected: I-90 FACTORIA,  Facility Carried by Structure: I-405 NB HOV
Minimum Vertical Clearance: 13.54m (44.42ft),  Kilometerpoint: 15.965,  Lanes on structure: 1,  Lanes under structure: 15,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.4m (116.1ft)

Find on map >>   Show street view

Structure Number: 8190H,  Location: JCT I-405 (Lat: 47.579861,  Lng: -122.171111),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 14,083 (year 2020),  Truck Traffic: 5%,  Features Intersected: EB I-90 RAMP,  Facility Carried by Structure: I-405 RAMP
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 8305A,  Location: 7.0 E JCT I-5 (Lat: 47.579583,  Lng: -122.178500),  Route carried "under" structure: Interstate 90,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 102,438 (year 2019),  Truck Traffic: 4%,  Features Intersected: INTERSTATE ROUTE 90,  Facility Carried by Structure: NP RY FACTORI
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 15.691,  Lanes under structure: 16,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 8610A,  Location: 6.4 E JCT I-5 (Lat: 47.579053,  Lng: -122.189772),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 9,916 (year 2012),  Truck Traffic: 5%,  Features Intersected: MERCER SL
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.579,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 8610B,  Location: 6.4 E JCT I-5 (Lat: 47.579528,  Lng: -122.190222),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1940,  Structure Length: 0. m,  Average Daily Traffic: 9,916 (year 2012),  Truck Traffic: 3%,  Features Intersected: MERCER SLOUGH
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.676,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 8610E,  Location: 6.4 E JCT I-5 (Lat: 47.580011,  Lng: -122.189036),  Route carried "under" structure: Interstate 90,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 166,101 (year 2019),  Truck Traffic: 4%,  Features Intersected: I-90 MERCER SLOUGH
Minimum Vertical Clearance: 6.78m (22.24ft),  Kilometerpoint: 14.870,  Lanes on structure: 1,  Lanes under structure: 11,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.3m (151.9ft)

Find on map >>   Show street view

Structure Number: 8610G,  Location: 6.4 E JCT I-5 (Lat: 47.580083,  Lng: -122.183417),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 24,280 (year 2019),  Truck Traffic: 5%,  Features Intersected: I-90 WBCD
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 1.481,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 9086C,  Location: 0.6 E JCT I-405 (Lat: 47.631306,  Lng: -122.176167),  Route carried "under" structure: Ramp State highway 520,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 2014),  Truck Traffic: 3%,  Features Intersected: 124 AVE NE - NW RAMP
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 0.177,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 9086D,  Location: 0.6 E JCT I-405 (Lat: 47.630722,  Lng: -122.175694),  Route carried "under" structure: Ramp State highway 520,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 2014),  Truck Traffic: 3%,  Features Intersected: 124 AVE NE - NW RAMP
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.113,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 9134A,  Location: 1.7 E JCT I-405 (Lat: 47.578389,  Lng: -122.140306),  Route carried "under" structure: Interstate 90,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 151,610 (year 2019),  Truck Traffic: 4%,  Features Intersected: I-90,  Facility Carried by Structure: 150TH AVE SE
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 18.572,  Lanes on structure: 3,  Lanes under structure: 13,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 60.7m (199.1ft)

Find on map >>   Show street view

Structure Number: 9134B,  Location: 1.7 E JCT I-405 (Lat: 47.578361,  Lng: -122.140028),  Route carried "under" structure: Interstate 90,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 151,610 (year 2019),  Truck Traffic: 4%,  Features Intersected: I-90,  Facility Carried by Structure: 150TH AVE SE
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 18.588,  Lanes on structure: 3,  Lanes under structure: 13,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 60.7m (199.1ft)

Find on map >>   Show street view

Structure Number: 9266A,  Location: 1.7 E JCT I-405 (Lat: 47.578667,  Lng: -122.143361),  Route carried "under" structure: Interstate 90,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 151,610 (year 2019),  Truck Traffic: 4%,  Features Intersected: I-90, RAMPS, CITY STREET,  Facility Carried by Structure: RAMP
Minimum Vertical Clearance: 7.59m (24.90ft),  Kilometerpoint: 18.427,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 78.6m (257.9ft)

Find on map >>   Show street view

Structure Number: 9266B,  Location: 1.7 E JCT I-405 (Lat: 47.582000,  Lng: -122.143056),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 3,393 (year 2019),  Truck Traffic: 5%,  Features Intersected: I-90 WBCD RAMP,  Facility Carried by Structure: 148TH ST-W RAMP
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 59.4m (194.9ft)

Find on map >>   Show street view

Structure Number: 9446A,  Location: 1.7 N JCT I-405 (Lat: 47.579183,  Lng: -122.140422),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 8,735 (year 2019),  Truck Traffic: 7%,  Features Intersected: I-90 RAMPS,  Facility Carried by Structure: S EASTGATE PEDESTR
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 0.515,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 9446B,  Location: 1.7 E JCT I-405 (Lat: 47.580203,  Lng: -122.141372),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 3,393 (year 2019),  Truck Traffic: 5%,  Features Intersected: EASTGATE WAY & W-S RAMP,  Facility Carried by Structure: N EASTGATE PEDESTR
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.145,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: 9893A,  Location: 1.2 E JCT I-405 (Lat: 47.581842,  Lng: -122.151044),  Route carried "under" structure: Interstate 90,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 151,610 (year 2019),  Truck Traffic: 4%,  Features Intersected: I-90,  Facility Carried by Structure: 142ND PL SE
Minimum Vertical Clearance: 6.76m (22.18ft),  Kilometerpoint: 17.751,  Lanes on structure: 2,  Lanes under structure: 13,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 67.1m (220.1ft)

Find on map >>   Show street view

Structure Number: 11764A,  Location: 2.3 E JCT I-405 (Lat: 47.634000,  Lng: -122.143083),  Route carried "under" structure: State highway 520,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 105,102 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 520,  Facility Carried by Structure: 148TH AVE
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 14.774,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 51.2m (168.0ft)

Find on map >>   Show street view

Structure Number: 13133B,  Location: 2.4 N JCT I-90 (Lat: 47.613303,  Lng: -122.187997),  Route carried "under" structure: Ramp Interstate 405,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 10,585 (year 2019),  Truck Traffic: 5%,  Features Intersected: I-405,  Facility Carried by Structure: NE 4TH STREET
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.676,  Lanes on structure: 6,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 8.5m (27.9ft)

Find on map >>   Show street view

Structure Number: 13293A,  Location: 2.4 N JCT I-90 (Lat: 47.613750,  Lng: -122.190028),  Route carried "under" structure: Ramp Interstate 405,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 18,580 (year 2019),  Truck Traffic: 5%,  Features Intersected: CITY STREET AND SBCD,  Facility Carried by Structure: NE 4TH ST
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 1.078,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 13846A,  Location: 6.4 E JCT I-5 (Lat: 47.579650,  Lng: -122.192564),  Route carried "under" structure: Interstate 90,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 83,051 (year 2019),  Truck Traffic: 4%,  Features Intersected: I-90, RAMPS, MERCER SL,  Facility Carried by Structure: E-E RAMP
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 14.693,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 79.2m (259.8ft)

Find on map >>   Show street view

Structure Number: 14039A,  Location: JCT I-405 (Lat: 47.634028,  Lng: -122.187889),  Route carried "under" structure: State highway 520,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 84,448 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 520,  Facility Carried by Structure: S-E RAMP I-405
Minimum Vertical Clearance: 8.99m (29.49ft),  Kilometerpoint: 11.121,  Lanes on structure: 1,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 14039C,  Location: 3.7 N JCT I-90 (Lat: 47.631306,  Lng: -122.190139),  Route carried "under" structure: Interstate 405,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 175,516 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-405 & SR 520,  Facility Carried by Structure: E-N RAMP SR 520
Minimum Vertical Clearance: 6.78m (22.24ft),  Kilometerpoint: 23.754,  Lanes on structure: 1,  Lanes under structure: 15,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>   Show street view

Structure Number: 14177A,  Location: 6.4 E JCT I-5 (Lat: 47.580750,  Lng: -122.178833),  Route carried "under" structure: Interstate 90,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 83,051 (year 2019),  Truck Traffic: 4%,  Features Intersected: MERCER SLOUGH, I-90
Minimum Vertical Clearance: 10.36m (33.99ft),  Kilometerpoint: 15.418,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 78.3m (256.9ft)

Find on map >>   Show street view

Structure Number: 16317A,  Location: 2.7 N JCT I-90 (Lat: 47.617361,  Lng: -122.189389),  Route carried "under" structure: Interstate 405,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 175,516 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-405,  Facility Carried by Structure: NE 8TH ST
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 22.241,  Lanes on structure: 9,  Lanes under structure: 9,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 16549A,  Location: 2.4 N JCT I-90 (Lat: 47.613722,  Lng: -122.190028),  Route carried "under" structure: Interstate 405,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 156,345 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-405,  Facility Carried by Structure: NE 4TH ST
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 21.807,  Lanes on structure: 7,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.4m (116.1ft)

Find on map >>   Show street view

Structure Number: 16549C,  Location: 2.4 N JCT I-90 (Lat: 47.613444,  Lng: -122.189167),  Route carried "under" structure: Ramp Interstate 405,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 18,580 (year 2019),  Truck Traffic: 5%,  Features Intersected: COLLECTOR DISTRIBUTOR,  Facility Carried by Structure: RAMP
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 8.8m (28.9ft)

Find on map >>   Show street view

Structure Number: 16549D,  Location: 2.4 N JCT I-90 (Lat: 47.615111,  Lng: -122.189167),  Route carried "under" structure: Ramp Interstate 405,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 18,580 (year 2019),  Truck Traffic: 5%,  Features Intersected: COLLECTOR DISTRIBUTOR,  Facility Carried by Structure: SBCD RAMP
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.869,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 9.1m (29.9ft)

Find on map >>   Show street view

Structure Number: 16549E,  Location: 2.6 N JCT I-90 (Lat: 47.615444,  Lng: -122.189750),  Route carried "under" structure: Interstate 405,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 78,173 (year 2019),  Truck Traffic: 6%,  Features Intersected: 114TH AVE NE, I-405,  Facility Carried by Structure: NE 6TH ST
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 22.032,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 17283A,  Location: JCT I-405 (Lat: 47.579139,  Lng: -122.174694),  Route carried "under" structure: Interstate 90,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 77,138 (year 2019),  Truck Traffic: 4%,  Features Intersected: I-90,  Facility Carried by Structure: I-405
Minimum Vertical Clearance: 14.50m (47.57ft),  Kilometerpoint: 15.949,  Lanes on structure: 3,  Lanes under structure: 15,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.3m (165.0ft)

Find on map >>   Show street view

Structure Number: 17417A,  Location: 2.8 N JCT I-90 (Lat: 47.619278,  Lng: -122.189417),  Route carried "under" structure: Interstate 405,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 175,516 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-405,  Facility Carried by Structure: NE 10TH STREET
Minimum Vertical Clearance: 7.70m (25.26ft),  Kilometerpoint: 22.450,  Lanes on structure: 5,  Lanes under structure: 14,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 61.6m (202.1ft)

Find on map >>   Show street view

Structure Number: 17726A,  Location: 3.0 N JCT I-90 (Lat: 47.621425,  Lng: -122.189331),  Route carried "under" structure: Interstate 405,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 175,516 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-405,  Facility Carried by Structure: NE 12 ST
Minimum Vertical Clearance: 7.16m (23.49ft),  Kilometerpoint: 22.724,  Lanes on structure: 5,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.3m (188.0ft)

Find on map >>   Show street view

Structure Number: 17726B,  Location: 2.8 N JCT I-90 (Lat: 47.619361,  Lng: -122.188308),  Route carried "under" structure: Ramp Interstate 405,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 10,585 (year 2019),  Truck Traffic: 3%,  Features Intersected: CD RAMP AND TERRAIN,  Facility Carried by Structure: N-E RAMP
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 1.384,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 17726G,  Location: 3.1 N JCT I-90 (Lat: 47.623333,  Lng: -122.188208),  Route carried "under" structure: Ramp Interstate 405,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 35,284 (year 2019),  Truck Traffic: 3%,  Features Intersected: I-405 N-E & N-W RAMPS
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.354,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 17963B,  Location: 5.2 E JCT SR 513 (Lat: 47.640494,  Lng: -122.196781),  Route carried "under" structure: City street 520,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 15,083 (year 2010),  Truck Traffic: 5%,  Features Intersected: 108TH AVE NE
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.097,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.4m (149.0ft)

Find on map >>   Show street view

Structure Number: 17963D,  Location: 4.9 E JCT SR 513 (Lat: 47.641861,  Lng: -122.201056),  Route carried "under" structure: State highway 520,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 68,515 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 520,  Facility Carried by Structure: BELLEVUE WAY NE
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 9.608,  Lanes on structure: 6,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 200536,  Location: 2.6 N JCT I-90 (Lat: 47.615222,  Lng: -122.189444),  Route carried "under" structure: Interstate 405,  Year Built: 2023,  Structure Length: 0. m,  Average Daily Traffic: 156,345 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-405, RAMPS,  Facility Carried by Structure: SOUND TRANSIT RAIL
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 22.000,  Lanes under structure: 8,  Toll: Toll bridge,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 112.8m (370.1ft)

Find on map >>   Show street view

Structure Number: 200537,  Location: 6.4 E JCT I-5 (Lat: 47.579686,  Lng: -122.192589),  Route carried "under" structure: Interstate 90,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 83,051 (year 2019),  Truck Traffic: 4%,  Features Intersected: I-90 WB, RAMPS, STREET,  Facility Carried by Structure: SOUND TRANSIT RAIL
Minimum Vertical Clearance: 7.92m (25.98ft),  Kilometerpoint: 14.774,  Lanes under structure: 3,  Toll: Toll bridge,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 109.7m (359.9ft)

Find on map >>   Show street view

Structure Number: 85009,  Location: 148TH AV SE & SE 16TH ST (Lat: 47.591908,  Lng: -122.142911),  Route carried "under" structure: City street 2450,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 39,067 (year 2019),  Truck Traffic: 2%,  Features Intersected: 148TH AVENUE,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 4.104,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 89033,  Location: 0.1M W COAL CR PKWY/I-405 (Lat: 47.569378,  Lng: -122.180528),  Route carried "under" structure: City street 2005,  Year Built: 1916,  Structure Length: 0. m,  Average Daily Traffic: 7,840 (year 2015),  Truck Traffic: 3%,  Features Intersected: LAKE WASHINGTON BLVD,  Facility Carried by Structure: ERC TRAIL
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.001,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft)

Discuss Bellevue, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.