Bridge Statistics for Brookings, South Dakota (SD)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 99Number of bridges
  • 919ft / 280mTotal length
  • $54,516,000Total costs
  • 255,285Total average daily traffic
  • 36,204Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Brookings
  • No street view available for this location

New bridges in Brookings, SD - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11910-1919
  • 11920-1929
  • 71930-1939
  • 11940-1949
  • 41950-1959
  • 321960-1969
  • 301970-1979
  • 71980-1989
  • 31990-1999
  • 82000-2009
  • 42010-2019
Reconstructed bridges in Brookings, SD - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 21950-1959
  • 01960-1969
  • 01970-1979
  • 31980-1989
  • 11990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Brookings, SD
Average Bridge Truck Traffic in Brookings, SD
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.6%Very good
  • 30.3%Good
  • 47.4%Satisfactory
  • 14.5%Fair
  • 3.9%Poor
  • 1.3%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 1.3%Very good
  • 25.0%Good
  • 52.6%Satisfactory
  • 14.5%Fair
  • 5.3%Poor
  • 1.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.6%Very good
  • 10.5%Good
  • 40.8%Satisfactory
  • 32.9%Fair
  • 11.8%Poor
  • 1.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.8%Excellent
  • 32.1%Very good
  • 39.7%Good
  • 15.4%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 6193211,  Location: 0.8 E I 29 INTERCH (Lat: 44.238994,  Lng: -96.739872),  Route carried "on" structure: State highway 324,  Year Built: 1974,  Status: Open,  Structure Length: 6.37m (20.90ft),  Average Daily Traffic: 1,407 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,116 (year 2041),  Design Load: HS 20,  Features Intersected: MEDARY CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 576.741,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 13.0m (42.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 83.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 619416,  Location: 0.9 E I 29 INTERCH (Lat: 44.311558,  Lng: -96.739542),  Route carried "on" structure: US 14,  Year Built: 1973,  Status: Open,  Structure Length: 2.24m (7.35ft),  Average Daily Traffic: 4,937 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 7,425 (year 2041),  Design Load: HS 20,  Features Intersected: WEST BR DEER CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 680.012,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 6196156,  Location: 1.4 E I 29 INTERCH (Lat: 44.316331,  Lng: -96.736450),  Route carried "on" structure: Bypass US 14,  Year Built: 1967,  Status: Open,  Structure Length: 2.24m (7.35ft),  Average Daily Traffic: 3,276 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,927 (year 2041),  Design Load: HS 20,  Features Intersected: DEER CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 680.527,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 62.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.24m (7.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $80,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 620116,  Location: 1.6 E I 29 INTERCH (Lat: 44.311508,  Lng: -96.726433),  Route carried "on" structure: US 14,  Year Built: 1973,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 4,609 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 6,932 (year 2041),  Design Load: HS 20,  Features Intersected: CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 681.605,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 6202201,  Location: 3.1E & 4.1S BROOKINGS (Lat: 44.253200,  Lng: -96.725358),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 1.50m (4.92ft),  Average Daily Traffic: 92 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 92 (year 2032),  Features Intersected: DEER CREEK,  Facility Carried by Structure: 216TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.7m (48.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 21.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $356,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $743,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 620311,  Location: 5N & 3.3E BROOKINGS (Lat: 44.383675,  Lng: -96.720139),  Route carried "on" structure: County highway ,  Year Built: 1974,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 120 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 120 (year 2032),  Design Load: HS 20,  Features Intersected: SIX MILE CK,  Facility Carried by Structure: 207TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.4m (37.4ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 53.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.87m (12.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $626,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $1,128,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 620416,  Location: 1.9 E I 29 INTERCH (Lat: 44.311478,  Lng: -96.720397),  Route carried "on" structure: US 14,  Year Built: 1973,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 4,609 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 6,932 (year 2041),  Design Load: HS 20,  Features Intersected: DEER CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 682.120,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 63.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $86,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 620915,  Location: 3.9E & 1N BROOKINGS (Lat: 44.325953,  Lng: -96.709717),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 2.00m (6.56ft),  Average Daily Traffic: 77 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 105 (year 2032),  Design Load: HL 93,  Features Intersected: DEER CK,  Facility Carried by Structure: 211TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.75m (9.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $870,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6210121,  Location: 2.9N & 3W BUSHNELL (Lat: 44.368889,  Lng: -96.707161),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Posted for load,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 92 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 92 (year 2032),  Features Intersected: CK,  Facility Carried by Structure: 475TH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.3m (40.4ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 20.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $321,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $689,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 615415,  Location: 1N 1.6W BROOKINGS (Lat: 44.325783,  Lng: -96.822258),  Route carried "under" structure: Bypass US 14,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 7,718 (year 2020),  Truck Traffic: 7%,  Features Intersected: US014 B
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 673.076,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 6167164,  Location: 6TH AVENUE (Lat: 44.306042,  Lng: -96.795297),  Route carried "under" structure: City street ,  Year Built: 1936,  Structure Length: 0. m,  Average Daily Traffic: 330 (year 1997),  Truck Traffic: 1%,  Features Intersected: 6TH AVENUE,  Facility Carried by Structure: CP/DM&E RR
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 6184169,  Location: 0.9 S US 14 INTERCH (Lat: 44.298406,  Lng: -96.758794),  Route carried "under" structure: City street ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 20 (year 2020),  Features Intersected: 8TH ST S, CP/DM&E RR,  Facility Carried by Structure: I029 S
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.4m (50.5ft)

Find on map >>   Show street view

Structure Number: 618511,  Location: 3 S SD 30 INTERCH (Lat: 44.383764,  Lng: -96.756872),  Route carried "under" structure: Interstate 29,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 9,960 (year 2020),  Truck Traffic: 16%,  Features Intersected: I029,  Facility Carried by Structure: 207 ST
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 221.752,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 618513,  Location: 2 N US14 BY PASS (Lat: 44.355069,  Lng: -96.757336),  Route carried "under" structure: Interstate 29,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 9,960 (year 2020),  Truck Traffic: 16%,  Features Intersected: I029,  Facility Carried by Structure: 209 ST
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 218.565,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 618515,  Location: US14 BY-PASS INTERCHANGE (Lat: 44.325803,  Lng: -96.757883),  Route carried "under" structure: Interstate 29,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 9,960 (year 2020),  Truck Traffic: 16%,  Features Intersected: I029,  Facility Carried by Structure: US014 B
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 215.314,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 6185159,  Location: US 14 & I 29 INTERCHANGE (Lat: 44.311681,  Lng: -96.758108),  Route carried "under" structure: Interstate 29,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 10,990 (year 2020),  Truck Traffic: 15%,  Features Intersected: I029,  Facility Carried by Structure: US014
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 213.689,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 6185169,  Location: 0.9 S US 14 INTERCH (Lat: 44.298331,  Lng: -96.758453),  Route carried "under" structure: City street ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 20 (year 2020),  Features Intersected: 8TH ST S, CP/DM&E RR,  Facility Carried by Structure: I029 N
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.4m (50.5ft)

Find on map >>   Show street view

Structure Number: 618519,  Location: 3 S US 14 INTERCH (Lat: 44.268103,  Lng: -96.757433),  Route carried "under" structure: Interstate 29,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 12,240 (year 2020),  Truck Traffic: 20%,  Features Intersected: I029,  Facility Carried by Structure: 215 ST
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 208.893,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 618521,  Location: SD 324 INTERCHANGE (Lat: 44.239078,  Lng: -96.756697),  Route carried "under" structure: Interstate 29,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 12,240 (year 2020),  Truck Traffic: 20%,  Features Intersected: I029,  Facility Carried by Structure: SD324
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 205.690,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 618523,  Location: 1 N MOODY CO LINE (Lat: 44.210122,  Lng: -96.756833),  Route carried "under" structure: Interstate 29,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 12,630 (year 2020),  Truck Traffic: 18%,  Features Intersected: I029,  Facility Carried by Structure: 219 ST
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 202.455,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Discuss Brookings, South Dakota (SD) on our hugely popular South Dakota forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.