Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cedar City, Utah (UT)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 53Number of bridges
  • 394ft / 120mTotal length
  • 751,133Total average daily traffic
  • 231,615Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cedar City
  • No street view available for this location

New bridges in Cedar City, UT - historical statistics
  • New bridges - historical statistics
  • 41950-1959
  • 371960-1969
  • 11970-1979
  • 11980-1989
  • 41990-1999
  • 52000-2009
  • 12010-2019
Reconstructed bridges in Cedar City, UT - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 81980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Cedar City, UT
Average Bridge Truck Traffic in Cedar City, UT
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Good
  • 56.3%Satisfactory
  • 15.6%Fair
  • 3.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.4%Very good
  • 40.6%Good
  • 43.8%Satisfactory
  • 6.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 37.5%Good
  • 46.9%Satisfactory
  • 15.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 1F 119,  Location: CEDAR CITY INTERCHANGE (Lat: 37.680522,  Lng: -113.079692),  Route carried "under" structure: State highway 56,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 11,521 (year 2020),  Truck Traffic: 42%,  Features Intersected: SR-56,200 NORTH STREET,  Facility Carried by Structure: I-15 (SR-15) NBL
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 97.151,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.2m (79.4ft)

Find on map >>   Show street view

Structure Number: 1F 181,  Location: SOUTH CEDAR CITY INTCHG. (Lat: 37.654314,  Lng: -113.082253),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Features Intersected: CITY ST. & INT. X-RO,  Facility Carried by Structure: I-15 (SR-15) NBL
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.4m (83.3ft)

Find on map >>   Show street view

Structure Number: 3C 502,  Location: SO CEDAR CITY INTERCHANGE (Lat: 37.651389,  Lng: -113.083611),  Route carried "under" structure: Interstate 15,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 29,862 (year 2020),  Truck Traffic: 34%,  Features Intersected: I-15 (SR-15) NBL & S,  Facility Carried by Structure: SR-130 SBL ONLY
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 91.390,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 3D 753,  Location: NO.KANARRAVILLE INTCHG. (Lat: 37.602761,  Lng: -113.161467),  Route carried "under" structure: County highway 1752,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 475 (year 2020),  Features Intersected: CO RD TO KANARRAVILLE,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 4.73m (15.52ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 12.3m (40.4ft)

Find on map >>   Show street view

Structure Number: 3D 762,  Location: NORTH of CEDAR CITY (Lat: 37.721925,  Lng: -113.058922),  Route carried "under" structure: City street 1781,  Year Built: 1965,  Structure Length: 0. m,  Features Intersected: NICHOLS CANYON ROAD,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 16.3m (53.5ft)

Find on map >>   Show street view

Structure Number: 3D 788,  Location: 2.2 MI NO CEDAR CITY INT. (Lat: 37.712017,  Lng: -113.068031),  Route carried "under" structure: County highway ,  Year Built: 1968,  Structure Length: 0. m,  Features Intersected: CITY ST. TO NO. FIELDS,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 4.31m (14.14ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 10.5m (34.4ft)

Find on map >>   Show street view

Structure Number: 3F 117,  Location: 0.7 MI.N.CEDAR CITY INT. (Lat: 37.687111,  Lng: -113.079297),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 0. m,  Features Intersected: 560 N.,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 7.57m (24.84ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.4m (76.8ft)

Find on map >>   Show street view

Structure Number: 3F 119,  Location: CEDAR CITY INTERCHANGE (Lat: 37.681142,  Lng: -113.079911),  Route carried "under" structure: State highway 56,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 11,521 (year 2020),  Truck Traffic: 42%,  Features Intersected: SR-56,200 NORTH STREET,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 97.185,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.2m (79.4ft)

Find on map >>   Show street view

Structure Number: 3F 181,  Location: SO.CEDAR CITY INTCHG. (Lat: 37.654672,  Lng: -113.082433),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Features Intersected: CITY ST. , INT. X-ROAD.,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.4m (83.3ft)

Discuss Cedar City, Utah (UT) on our hugely popular Utah forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.