Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Chester, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 81Number of bridges
  • 2,398ft / 731mTotal length
  • $119,042,000Total costs
  • 2,754,667Total average daily traffic
  • 176,804Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Chester
  • No street view available for this location

New bridges in Chester, PA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 21920-1929
  • 21930-1939
  • 41940-1949
  • 401960-1969
  • 131970-1979
  • 21980-1989
  • 21990-1999
  • 12000-2009
  • 142010-2019
Reconstructed bridges in Chester, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 51980-1989
  • 11990-1999
  • 12000-2009
  • 42010-2019
Average Bridge Daily Traffic in Chester, PA
Average Bridge Truck Traffic in Chester, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 22.2%Good
  • 52.8%Satisfactory
  • 13.9%Fair
  • 2.8%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.3%Very good
  • 38.5%Good
  • 25.6%Satisfactory
  • 20.5%Fair
  • 2.6%Poor
  • 2.6%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.1%Very good
  • 35.9%Good
  • 43.6%Satisfactory
  • 12.8%Fair
  • 2.6%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.7%Very good
  • 20.0%Good
  • 53.3%Satisfactory
  • 13.3%Fair
  • 6.7%Poor
Find on map >>   Show street view

Structure Number: 49032,  Location: EDGMONT AVE. RAMP 3807C3 (Lat: 39.856947,  Lng: -75.361489),  Route carried "on" structure: Ramp State highway ,  Year Built: 2004,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 5,198 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,903 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OPEN GROUND,  Facility Carried by Structure: RAMP D (SR 8021)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54893,  Location: W OF SPROUL ST 3807-B5 (Lat: 39.848697,  Lng: -75.362597),  Route carried "on" structure: City street 10,  Year Built: 1963,  Status: Closed,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 1,000 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,500 (year 2038),  Design Load: HS 20,  Features Intersected: CHESTER CREEK,  Facility Carried by Structure: SIXTH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.3m (119.1ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14875,  Location: US322 RAMP 42K06 (Lat: 39.839983,  Lng: -75.406239),  Route carried "under" structure: Ramp State highway ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 1,390 (year 2021),  Truck Traffic: 7%,  Features Intersected: RAMP A TO HIGHLAND AVE.,  Facility Carried by Structure: INTERSTATE 95(NB)
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 10.4m (34.1ft)

Find on map >>   Show street view

Structure Number: 14878,  Location: US 322 INTERCHANGE 42K06 (Lat: 39.840872,  Lng: -75.406992),  Route carried "under" structure: US 322,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 19,497 (year 2022),  Truck Traffic: 6%,  Features Intersected: US 322 EB & RAMP A,  Facility Carried by Structure: INTERSTATE 95(SB)
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 10.800,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 14878,  Location: US 322 INTERCHANGE 42K06 (Lat: 39.840872,  Lng: -75.406992),  Route carried "under" structure: Ramp State highway ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 1,370 (year 2010),  Truck Traffic: 7%,  Features Intersected: US 322 EB & RAMP A,  Facility Carried by Structure: INTERSTATE 95(SB)
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 14881,  Location: .3MI.N.OF US-322 43A06 (Lat: 39.841633,  Lng: -75.401883),  Route carried "under" structure: Interstate 95,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 96,776 (year 2022),  Truck Traffic: 6%,  Features Intersected: INTERSTATE 95,  Facility Carried by Structure: HIGHLAND AV.RELOC.
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 4.807,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 14881,  Location: .3MI.N.OF US-322 43A06 (Lat: 39.841633,  Lng: -75.401883),  Route carried "under" structure: Interstate 95,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 85,010 (year 2022),  Truck Traffic: 6%,  Features Intersected: INTERSTATE 95,  Facility Carried by Structure: HIGHLAND AV.RELOC.
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 4.831,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 14886,  Location: BARRY BRIDGE RAMPS 43C05 (Lat: 39.847033,  Lng: -75.387472),  Route carried "under" structure: State highway ,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 20,550 (year 2021),  Truck Traffic: 10%,  Features Intersected: RAMP E &RAMP F TO BARRY,  Facility Carried by Structure: INTERSTATE 95
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: 14886,  Location: BARRY BRIDGE RAMPS 43C05 (Lat: 39.847033,  Lng: -75.387472),  Route carried "under" structure: US 322,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 10,378 (year 2021),  Truck Traffic: 14%,  Features Intersected: RAMP E &RAMP F TO BARRY,  Facility Carried by Structure: INTERSTATE 95
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: 14892,  Location: CITY OF CHESTER 43E04 (Lat: 39.851764,  Lng: -75.373750),  Route carried "under" structure: State highway ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 17,534 (year 2022),  Truck Traffic: 2%,  Features Intersected: KERLIN STREET,  Facility Carried by Structure: INTERSTATE 95
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 14899,  Location: OVER RIDLEY CREEK 43J02 (Lat: 39.863872,  Lng: -75.348878),  Route carried "under" structure: State highway ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 600 (year 1980),  Truck Traffic: 7%,  Features Intersected: RIDLEY CREEK & SUN DRIVE,  Facility Carried by Structure: INTERSTATE 95
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 14964,  Location: .7MI.S. RIDLEY CK. 43G03 (Lat: 39.857069,  Lng: -75.360775),  Route carried "under" structure: Interstate 95,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 98,656 (year 2022),  Truck Traffic: 6%,  Features Intersected: CSX & INTERSTATE 95,  Facility Carried by Structure: MADISON STREET(NB)
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 8.097,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 14964,  Location: .7MI.S. RIDLEY CK. 43G03 (Lat: 39.857069,  Lng: -75.360775),  Route carried "under" structure: Interstate 95,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 80,639 (year 2022),  Truck Traffic: 7%,  Features Intersected: CSX & INTERSTATE 95,  Facility Carried by Structure: MADISON STREET(NB)
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 8.053,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 14988,  Location: 1MILE WEST OF I-95 42J06 (Lat: 39.843439,  Lng: -75.415894),  Route carried "under" structure: Alternate State highway ,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 772 (year 2022),  Truck Traffic: 7%,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: CONCHESTER HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 14988,  Location: 1MILE WEST OF I-95 42J06 (Lat: 39.843439,  Lng: -75.415894),  Route carried "under" structure: Alternate State highway ,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 1,348 (year 2022),  Truck Traffic: 36%,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: CONCHESTER HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 14989,  Location: .8MI.S.RIDLEY CK. 43G03 (Lat: 39.856947,  Lng: -75.361150),  Route carried "under" structure: Interstate 95,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 98,656 (year 2022),  Truck Traffic: 6%,  Features Intersected: INTERSTATE 95;CSX RAILRO,  Facility Carried by Structure: EDGMONT AVENUE
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 8.097,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 14989,  Location: .8MI.S.RIDLEY CK. 43G03 (Lat: 39.856947,  Lng: -75.361150),  Route carried "under" structure: Interstate 95,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 80,639 (year 2022),  Truck Traffic: 7%,  Features Intersected: INTERSTATE 95;CSX RAILRO,  Facility Carried by Structure: EDGMONT AVENUE
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 8.053,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 15445,  Location: 400FEET N.PA320 3807-C3 (Lat: 39.857631,  Lng: -75.359458),  Route carried "under" structure: Interstate 95,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 80,639 (year 2022),  Truck Traffic: 7%,  Features Intersected: INTERSTATE 95;CSX R.R.,  Facility Carried by Structure: UPLAND STREET
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 8.879,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 15445,  Location: 400FEET N.PA320 3807-C3 (Lat: 39.857631,  Lng: -75.359458),  Route carried "under" structure: Interstate 95,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 98,656 (year 2022),  Truck Traffic: 6%,  Features Intersected: INTERSTATE 95;CSX R.R.,  Facility Carried by Structure: UPLAND STREET
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 8.919,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 15446,  Location: 900' N of PA-320 3807-C3 (Lat: 39.858178,  Lng: -75.358039),  Route carried "under" structure: Interstate 95,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 80,639 (year 2022),  Truck Traffic: 7%,  Features Intersected: INTERSTATE 95; CSX R.R.,  Facility Carried by Structure: POTTER STREET
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 8.879,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 15446,  Location: 900' N of PA-320 3807-C3 (Lat: 39.858178,  Lng: -75.358039),  Route carried "under" structure: Interstate 95,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 98,656 (year 2022),  Truck Traffic: 6%,  Features Intersected: INTERSTATE 95; CSX R.R.,  Facility Carried by Structure: POTTER STREET
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 8.919,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 15448,  Location: .3 Mi N of PA-320 3807-D3 (Lat: 39.859436,  Lng: -75.355672),  Route carried "under" structure: Interstate 95,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 98,656 (year 2022),  Truck Traffic: 6%,  Features Intersected: INTERSTATE 95; CSX R.R.,  Facility Carried by Structure: CHESTNUT STREET
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 8.919,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 15448,  Location: .3 Mi N of PA-320 3807-D3 (Lat: 39.859436,  Lng: -75.355672),  Route carried "under" structure: Interstate 95,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 80,639 (year 2022),  Truck Traffic: 7%,  Features Intersected: INTERSTATE 95; CSX R.R.,  Facility Carried by Structure: CHESTNUT STREET
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 8.879,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 15449,  Location: .5 Mi N of PA-320 3807-D3 (Lat: 39.860661,  Lng: -75.353383),  Route carried "under" structure: Ramp State highway ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 3,522 (year 2021),  Truck Traffic: 5%,  Features Intersected: I-95; RAMPS; & CSX R.R.,  Facility Carried by Structure: MELROSE AVENUE
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 15449,  Location: .5 Mi N of PA-320 3807-D3 (Lat: 39.860661,  Lng: -75.353383),  Route carried "under" structure: Interstate 95,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 98,656 (year 2022),  Truck Traffic: 6%,  Features Intersected: I-95; RAMPS; & CSX R.R.,  Facility Carried by Structure: MELROSE AVENUE
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 8.919,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 15449,  Location: .5 Mi N of PA-320 3807-D3 (Lat: 39.860661,  Lng: -75.353383),  Route carried "under" structure: Interstate 95,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 80,639 (year 2022),  Truck Traffic: 7%,  Features Intersected: I-95; RAMPS; & CSX R.R.,  Facility Carried by Structure: MELROSE AVENUE
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 8.879,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 15449,  Location: .5 Mi N of PA-320 3807-D3 (Lat: 39.860661,  Lng: -75.353383),  Route carried "under" structure: Ramp State highway ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 4,382 (year 2022),  Truck Traffic: 5%,  Features Intersected: I-95; RAMPS; & CSX R.R.,  Facility Carried by Structure: MELROSE AVENUE
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 1545,  Location: RAMP B COMM BARRY 43D06 (Lat: 39.840000,  Lng: -75.383333),  Route carried "under" structure: City street ,  Year Built: 1974,  Structure Length: 0. m,  Features Intersected: SEVENTH STREET,  Facility Carried by Structure: RAMP B COMM BARRY
Minimum Vertical Clearance: 7.68m (25.20ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Toll: Toll bridge,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 15451,  Location: RAMP A COM BARRY 43D06 (Lat: 39.840508,  Lng: -75.383172),  Route carried "under" structure: City street ,  Year Built: 1974,  Structure Length: 0. m,  Features Intersected: SEVENTH ST;FLOWER STREET,  Facility Carried by Structure: RAMP A COMM BARRY
Minimum Vertical Clearance: 7.67m (25.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Toll: Toll bridge,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 15451,  Location: RAMP A COM BARRY 43D06 (Lat: 39.840508,  Lng: -75.383172),  Route carried "under" structure: City street ,  Year Built: 1974,  Structure Length: 0. m,  Features Intersected: SEVENTH ST;FLOWER STREET,  Facility Carried by Structure: RAMP A COMM BARRY
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Toll: Toll bridge,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 15452,  Location: 2 MILES WEST OF US 130 (Lat: 39.842311,  Lng: -75.384931),  Route carried "under" structure: ServiceOther road ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 312 (year 2012),  Truck Traffic: 1%,  Features Intersected: DELAWARE RIVER,  Facility Carried by Structure: US 322
Minimum Vertical Clearance: 4.46m (14.63ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 501.1m (1,644.0ft)

Find on map >>   Show street view

Structure Number: 15468,  Location: HIGHLAND AVE.INTER.42K06 (Lat: 39.840156,  Lng: -75.408619),  Route carried "under" structure: Ramp State highway ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 1,370 (year 2010),  Truck Traffic: 7%,  Features Intersected: LR 180:EB, WB, RAMP A,  Facility Carried by Structure: RAMP N SOUTHBOUND
Minimum Vertical Clearance: 7.60m (24.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 15468,  Location: HIGHLAND AVE.INTER.42K06 (Lat: 39.840156,  Lng: -75.408619),  Route carried "under" structure: US 322,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 9,848 (year 2020),  Truck Traffic: 17%,  Features Intersected: LR 180:EB, WB, RAMP A,  Facility Carried by Structure: RAMP N SOUTHBOUND
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 10.789,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 15468,  Location: HIGHLAND AVE.INTER.42K06 (Lat: 39.840156,  Lng: -75.408619),  Route carried "under" structure: US 322,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 19,497 (year 2022),  Truck Traffic: 6%,  Features Intersected: LR 180:EB, WB, RAMP A,  Facility Carried by Structure: RAMP N SOUTHBOUND
Minimum Vertical Clearance: 7.77m (25.49ft),  Kilometerpoint: 10.800,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 15473,  Location: FLOWER ST.INTERCH. 43C05 (Lat: 39.846667,  Lng: -75.390000),  Route carried "under" structure: Ramp US 322,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 10,378 (year 2021),  Truck Traffic: 14%,  Features Intersected: RAMP E TO S.B.I-95,  Facility Carried by Structure: RAMP F S.B. TO BAR
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 45384,  Location: COMM. BARRY BRDG 3806K07 (Lat: 39.833614,  Lng: -75.380406),  Route carried "under" structure: City street ,  Year Built: 2011,  Structure Length: 0. m,  Features Intersected: 2nd ST,FRONT & REANEY ST,  Facility Carried by Structure: RAMP A
Minimum Vertical Clearance: 19.20m (62.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 59.4m (194.9ft)

Find on map >>   Show street view

Structure Number: 45384,  Location: COMM. BARRY BRDG 3806K07 (Lat: 39.833614,  Lng: -75.380406),  Route carried "under" structure: City street ,  Year Built: 2011,  Structure Length: 0. m,  Features Intersected: 2nd ST,FRONT & REANEY ST,  Facility Carried by Structure: RAMP A
Minimum Vertical Clearance: 21.34m (70.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 59.4m (194.9ft)

Find on map >>   Show street view

Structure Number: 45384,  Location: COMM. BARRY BRDG 3806K07 (Lat: 39.833614,  Lng: -75.380406),  Route carried "under" structure: State highway 291,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 1,778 (year 2020),  Truck Traffic: 11%,  Features Intersected: 2nd ST,FRONT & REANEY ST,  Facility Carried by Structure: RAMP A
Minimum Vertical Clearance: 23.47m (77.00ft),  Kilometerpoint: 2.044,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 59.4m (194.9ft)

Find on map >>   Show street view

Structure Number: 45384,  Location: COMM. BARRY BRDG 3806K07 (Lat: 39.833614,  Lng: -75.380406),  Route carried "under" structure: State highway 291,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 1,778 (year 2020),  Truck Traffic: 11%,  Features Intersected: 2nd ST,FRONT & REANEY ST,  Facility Carried by Structure: RAMP A
Minimum Vertical Clearance: 23.47m (77.00ft),  Kilometerpoint: 2.042,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 59.4m (194.9ft)

Find on map >>   Show street view

Structure Number: 45385,  Location: COMMODORE BARRY BRIDGE (Lat: 39.835936,  Lng: -75.376153),  Route carried "under" structure: City street ,  Year Built: 2011,  Structure Length: 0. m,  Features Intersected: US 291; LOCAL ROAD,  Facility Carried by Structure: RAMP B
Minimum Vertical Clearance: 17.15m (56.27ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.5m (191.9ft)

Find on map >>   Show street view

Structure Number: 45385,  Location: COMMODORE BARRY BRIDGE (Lat: 39.835936,  Lng: -75.376153),  Route carried "under" structure: State highway 291,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 1,778 (year 2020),  Truck Traffic: 11%,  Features Intersected: US 291; LOCAL ROAD,  Facility Carried by Structure: RAMP B
Minimum Vertical Clearance: 21.95m (72.01ft),  Kilometerpoint: 2.044,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.5m (191.9ft)

Find on map >>   Show street view

Structure Number: 45385,  Location: COMMODORE BARRY BRIDGE (Lat: 39.835936,  Lng: -75.376153),  Route carried "under" structure: City street ,  Year Built: 2011,  Structure Length: 0. m,  Features Intersected: US 291; LOCAL ROAD,  Facility Carried by Structure: RAMP B
Minimum Vertical Clearance: 14.02m (46.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.5m (191.9ft)

Find on map >>   Show street view

Structure Number: 45385,  Location: COMMODORE BARRY BRIDGE (Lat: 39.835936,  Lng: -75.376153),  Route carried "under" structure: City street ,  Year Built: 2011,  Structure Length: 0. m,  Features Intersected: US 291; LOCAL ROAD,  Facility Carried by Structure: RAMP B
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.5m (191.9ft)

Find on map >>   Show street view

Structure Number: 45385,  Location: COMMODORE BARRY BRIDGE (Lat: 39.835936,  Lng: -75.376153),  Route carried "under" structure: State highway 291,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 1,778 (year 2020),  Truck Traffic: 11%,  Features Intersected: US 291; LOCAL ROAD,  Facility Carried by Structure: RAMP B
Minimum Vertical Clearance: 21.95m (72.01ft),  Kilometerpoint: 2.042,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.5m (191.9ft)

Discuss Chester, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.