Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Clinton, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 65Number of bridges
  • 1,106ft / 337mTotal length
  • $2,663,876,000Total costs
  • 349,151Total average daily traffic
  • 54,781Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Clinton
  • No street view available for this location

New bridges in Clinton, MS - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 41950-1959
  • 151960-1969
  • 91970-1979
  • 41980-1989
  • 91990-1999
  • 102000-2009
  • 92010-2019
  • 32020-2022
Reconstructed bridges in Clinton, MS - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
  • 22020-2022
Average Bridge Daily Traffic in Clinton, MS
Average Bridge Truck Traffic in Clinton, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 36.4%Good
  • 43.6%Satisfactory
  • 9.1%Fair
  • 1.8%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.6%Excellent
  • 21.8%Very good
  • 36.4%Good
  • 27.3%Satisfactory
  • 7.3%Fair
  • 3.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.8%Excellent
  • 18.2%Very good
  • 38.2%Good
  • 18.2%Satisfactory
  • 12.7%Fair
  • 7.3%Poor
  • 3.6%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.2%Very good
  • 28.9%Good
  • 35.6%Satisfactory
  • 11.1%Fair
  • 2.2%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 33.3%Good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: 11000200250315B,  Location: 11.0 MI E SR 22 (Lat: 32.355936,  Lng: -90.409183),  Route carried "on" structure: Interstate 20,  Year Built: 2016,  Status: Open,  Structure Length: 51.12m (167.72ft),  Average Daily Traffic: 15,000 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 17,500 (year 2040),  Design Load: HL 93,  Features Intersected: MERIDIAN SPEEDWAY RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.536,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 11,  Length of Maximum Span: 83.8m (274.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 41.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000200250316,  Location: 11.1 MI E SR 22 (Lat: 32.355403,  Lng: -90.405358),  Route carried "on" structure: Interstate 20,  Year Built: 1971,  Status: Open,  Structure Length: 18.44m (60.50ft),  Average Daily Traffic: 15,000 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 17,500 (year 2040),  Design Load: HS 20,  Features Intersected: KCS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.433,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1100020025032,  Location: 11.6 MI E SR 22 (Lat: 32.354653,  Lng: -90.402328),  Route carried "on" structure: Interstate 20,  Year Built: 1966,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 30,000 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 35,000 (year 2040),  Design Load: HS 20,  Features Intersected: BAKERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.136,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 11000200250325A,  Location: 11.9 MI E SR 22 (Lat: 32.352522,  Lng: -90.394003),  Route carried "on" structure: Interstate 20,  Year Built: 1971,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 15,000 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 17,500 (year 2040),  Design Load: HS 20,  Features Intersected: NORRELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.318,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Fair,  Operating Rating: 61.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000200250325B,  Location: 11.9 MI E SR 22 (Lat: 32.351903,  Lng: -90.394739),  Route carried "on" structure: Interstate 20,  Year Built: 1971,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 15,000 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 18,000 (year 2040),  Design Load: HS 20,  Features Intersected: NORRELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.969,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 61.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000200250360A,  Location: 1.1 MI E NATCHEZ TRACE (Lat: 32.334211,  Lng: -90.337578),  Route carried "on" structure: Interstate 20,  Year Built: 2008,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 17,000 (year 2020),  Truck Traffic: 39%,  Average Future Daily Traffic: 19,500 (year 2040),  Design Load: HS 20,  Features Intersected: CLINTON RAYMOND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.565,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 70.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000200250360B,  Location: 1.1 MI E NATCHEZ TRACE (Lat: 32.334411,  Lng: -90.338325),  Route carried "on" structure: Interstate 20,  Year Built: 2008,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 17,000 (year 2020),  Truck Traffic: 39%,  Average Future Daily Traffic: 19,500 (year 2040),  Design Load: HS 20,  Features Intersected: RAYMOND CLINTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.691,  Lanes on structure: 3,  Lanes under structure: 7,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 70.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18000200250316C,  Location: 2.7 MI W NATCHEZ TRACE (Lat: 32.357122,  Lng: -90.405819),  Route carried "on" structure: ServiceInterstate 20,  Year Built: 2020,  Status: Open,  Structure Length: 50.39m (165.32ft),  Average Daily Traffic: 800 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 800 (year 2040),  Design Load: HL 93,  Features Intersected: MERIDIAN SPEEDWAY RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.670,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 10,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 53.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2100049025169,  Location: 2.3 MI N NATCHEZ TRACE (Lat: 32.409597,  Lng: -90.285792),  Route carried "on" structure: US 49,  Year Built: 1958,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 13,000 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 13,000 (year 2040),  Design Load: HS 15,  Features Intersected: DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.348,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $99,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $347,000,000
Find on map >>   Show street view

Structure Number: 21000490251719,  Location: 5.3 MI N NATCHEZ TRACE (Lat: 32.448347,  Lng: -90.293456),  Route carried "on" structure: US 49,  Year Built: 1958,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 12,000 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 12,000 (year 2040),  Design Load: HS 15,  Features Intersected: LIME KILN CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.949,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $129,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $382,000,000
Find on map >>   Show street view

Structure Number: 21000800250316,  Location: 11.5 MI E SR 22 (Lat: 32.353428,  Lng: -90.419103),  Route carried "on" structure: US 80,  Year Built: 1927,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 1,100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,100 (year 2040),  Design Load: H 15,  Features Intersected: KCS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.732,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $480,000,000,  Roadway Improvement Cost: $48,000,000,  Total Project Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21000800250324,  Location: 12.3 MI E SR 22 (Lat: 32.353500,  Lng: -90.405658),  Route carried "on" structure: US 80,  Year Built: 1927,  Status: Posted for load,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 1,100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,100 (year 2040),  Design Load: H 15,  Features Intersected: BAKERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.118,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 35.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $312,000,000,  Roadway Improvement Cost: $31,000,000,  Total Project Cost: $930,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570139P,  Location: 0.3 MILES NORTH OF I-20. (Lat: 32.344872,  Lng: -90.352278),  Route carried "on" structure: Federal lands road 1,  Year Built: 1965,  Status: Posted for load-capacity,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 728 (year 2010),  Average Future Daily Traffic: 800 (year 2030),  Design Load: H 15,  Features Intersected: U.S. ROUTE 80 (NORTH FRO,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 140.882,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $110,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $165,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5570140P,  Location: 8.0 MILES FROM MS ROUTE 4 (Lat: 32.342472,  Lng: -90.354108),  Route carried "on" structure: Federal lands road 1,  Year Built: 1965,  Status: Posted for load-capacity,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 728 (year 2010),  Average Future Daily Traffic: 800 (year 2030),  Design Load: H 15,  Features Intersected: I-20,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 140.174,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.2m (82.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $75,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570141P,  Location: 0.2 MILES SOUTH OF I-20. (Lat: 32.339136,  Lng: -90.355750),  Route carried "on" structure: Federal lands road 1,  Year Built: 1965,  Status: Posted for load-capacity,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 728 (year 2010),  Average Future Daily Traffic: 800 (year 2030),  Design Load: H 15,  Features Intersected: I-20 SOUTH FRONTAGE ROAD,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 140.013,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $53,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570142P,  Location: 1.1 MILES SOUTH OF I-20. (Lat: 32.330553,  Lng: -90.359897),  Route carried "on" structure: Federal lands road 1,  Year Built: 1967,  Status: Posted for load-capacity,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 728 (year 2010),  Average Future Daily Traffic: 800 (year 2030),  Design Load: H 15,  Features Intersected: LINDSEY CREEK,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 138.693,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.9m (42.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $45,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570143P,  Location: 2.5 MILES SOUTH OF I-20. (Lat: 32.314928,  Lng: -90.378825),  Route carried "on" structure: Federal lands road 1,  Year Built: 1967,  Status: Posted for load-capacity,  Structure Length: 3.94m (12.93ft),  Average Daily Traffic: 728 (year 2006),  Average Future Daily Traffic: 800 (year 2026),  Design Load: H 15,  Features Intersected: COUNTY ROAD,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 136.440,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.0m (52.5ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $45,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570144P,  Location: 3.7 MILES FROM I-20 (Lat: 32.305278,  Lng: -90.389961),  Route carried "on" structure: Federal lands road 1,  Year Built: 1967,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 728 (year 2010),  Average Future Daily Traffic: 800 (year 2030),  Design Load: H 15,  Features Intersected: BAKERS CREEK RELIEF CHAN,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 134.840,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $26,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570145P,  Location: 3.7 MILES FROM I-20 (Lat: 32.303078,  Lng: -90.392214),  Route carried "on" structure: Federal lands road 1,  Year Built: 1967,  Status: Posted for load-capacity,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 728 (year 2010),  Average Future Daily Traffic: 800 (year 2030),  Design Load: H 15,  Features Intersected: BAKERS CREEK,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 134.525,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $53,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570498P,  Location: 0.30 MILES NORTH OF I-20. (Lat: 32.350556,  Lng: -90.342694),  Route carried "on" structure: Federal lands road 1,  Year Built: 2004,  Status: Posted for load-capacity,  Structure Length: 8.20m (26.90ft),  Average Daily Traffic: 9,100 (year 2013),  Average Future Daily Traffic: 10,920 (year 2033),  Features Intersected: KANSAS CITY SOUTHERN RAI,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 141.300,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 3.3m (10.8ft),  Right: 0.0m,  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $40,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $60,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570499P,  Location: 0.80 MILES NORTH OF I-20. (Lat: 32.354500,  Lng: -90.332061),  Route carried "on" structure: Federal lands road 1,  Year Built: 2004,  Status: Posted for load-capacity,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 9,100 (year 2013),  Average Future Daily Traffic: 10,920 (year 2033),  Features Intersected: WEST NORTHSIDE DRIVE,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 142.025,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.8m (140.4ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 0.0m,  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $40,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $60,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570500P,  Location: 1.44 MILES NORTH OF I-20. (Lat: 32.356056,  Lng: -90.323000),  Route carried "on" structure: Federal lands road 1,  Year Built: 2004,  Status: Posted for load-capacity,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 9,100 (year 2013),  Average Future Daily Traffic: 10,920 (year 2033),  Features Intersected: PINEHAVEN DRIVE,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 143.199,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.8m (140.4ft),  Curb or Sidewalk Widths: Left: 3.3m (10.8ft),  Right: 0.0m,  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $53,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570501P,  Location: 2.96 MILES NORTH OF I-20. (Lat: 32.362833,  Lng: -90.297250),  Route carried "on" structure: Federal lands road 1,  Year Built: 2004,  Status: Posted for load-capacity,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 9,100 (year 2013),  Average Future Daily Traffic: 10,920 (year 2033),  Features Intersected: ARROW DRIVE,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 145.646,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $53,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570502P,  Location: 3.86 MILES NORTH OF I-20 (Lat: 32.370333,  Lng: -90.284083),  Route carried "on" structure: Federal lands road 1,  Year Built: 2004,  Status: Open,  Structure Length: 15.25m (50.03ft),  Average Daily Traffic: 9,105 (year 2019),  Average Future Daily Traffic: 10,925 (year 2039),  Design Load: HS 20,  Features Intersected: BOGUE CHITTO,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 147.094,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $38,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570503P,  Location: 4 MILES NORTH OF I-20. (Lat: 32.373139,  Lng: -90.280222),  Route carried "on" structure: Federal lands road 1,  Year Built: 2004,  Status: Posted for load-capacity,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 9,100 (year 2013),  Average Future Daily Traffic: 10,920 (year 2033),  Features Intersected: COUNTY ROAD G,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 147.416,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $53,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA2500000000118,  Location: SEC 5 T 5N R 1W B (Lat: 32.307722,  Lng: -90.326000),  Route carried "on" structure: County highway 6932,  Year Built: 1990,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 10,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 14,700 (year 2040),  Design Load: HS 20,  Features Intersected: BAKERS CR,  Facility Carried by Structure: SPRINGRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2500000000164,  Location: SEC 2 T 5N R 2W (Lat: 32.298250,  Lng: -90.363750),  Route carried "on" structure: County highway 8277,  Year Built: 2010,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 2,500 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,750 (year 2040),  Design Load: HS 20,  Features Intersected: SMITH CREEK,  Facility Carried by Structure: MCRAVEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.160,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2500000000165,  Location: SEC 3 T 5N R 2W B (Lat: 32.301611,  Lng: -90.391306),  Route carried "on" structure: County highway 410,  Year Built: 1972,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 3,400 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,100 (year 2040),  Design Load: HS 20,  Features Intersected: BAKERS CR,  Facility Carried by Structure: RAYMOND CLINTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.382,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $291,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $358,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA2500000000166,  Location: SEC 3 T 5N R 2W B (Lat: 32.304444,  Lng: -90.388611),  Route carried "on" structure: City street 410,  Year Built: 1957,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,500 (year 2040),  Design Load: HS 20,  Features Intersected: BAKERS CR RELIEF,  Facility Carried by Structure: RAYMOND CLINTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.543,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: SA2500000000167,  Location: SEC 11 T 5N R 2W (Lat: 32.284000,  Lng: -90.372361),  Route carried "on" structure: County highway 5186,  Year Built: 1972,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 300 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 450 (year 2038),  Design Load: H 15,  Features Intersected: BCH OF BAKERS CREEK,  Facility Carried by Structure: SNAKE CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.988,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 7.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 4.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $208,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA2500000000168,  Location: SEC 11 T 5N R 2W (Lat: 32.290972,  Lng: -90.380556),  Route carried "on" structure: County highway 5187,  Year Built: 2007,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 325 (year 2040),  Design Load: HS 20,  Features Intersected: BCH OF BAKERS CREEK,  Facility Carried by Structure: E AIRPORT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2500000000169,  Location: SEC 13 T 5N R 2W (Lat: 32.282278,  Lng: -90.351944),  Route carried "on" structure: County highway 5096,  Year Built: 1994,  Status: Open,  Structure Length: 2.82m (9.25ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 750 (year 2040),  Design Load: HS 20,  Features Intersected: SMITH CR,  Facility Carried by Structure: WELLS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.735,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA250000000017,  Location: SEC 14 T 5N R 2W B (Lat: 32.282250,  Lng: -90.369472),  Route carried "on" structure: County highway 4167,  Year Built: 1965,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 960 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,440 (year 2040),  Design Load: H 15,  Features Intersected: BCH OF BAKERS CREEK,  Facility Carried by Structure: N MIDWAY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.002,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $103,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $127,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2500000000195,  Location: SEC 4 T 6N R 1W B (Lat: 32.391833,  Lng: -90.309444),  Route carried "on" structure: County highway 4105,  Year Built: 1959,  Status: Posted for load,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 4,300 (year 2015),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,450 (year 2035),  Design Load: H 15,  Features Intersected: BOGUE CHITTO CREEK,  Facility Carried by Structure: PINEHAVEN DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.149,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 17.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 10.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $269,000 ( Estimate for 2016),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA2500000000197,  Location: SEC 5 T 6N R 1W B (Lat: 32.398611,  Lng: -90.312778),  Route carried "on" structure: County highway 415,  Year Built: 2010,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 940 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,410 (year 2040),  Design Load: HL 93,  Features Intersected: BOGUE CHITTO CREEK,  Facility Carried by Structure: KICKAPOO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA25000000002,  Location: SEC 7 T 6N R 1W B (Lat: 32.381917,  Lng: -90.338583),  Route carried "on" structure: County highway 489,  Year Built: 2010,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,100 (year 2040),  Design Load: HS 20,  Features Intersected: STAIGHT FENCE CREEK,  Facility Carried by Structure: CLINTON TINNIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.735,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA250000000022,  Location: SEC 19 T 6N R 1W (Lat: 32.342806,  Lng: -90.333472),  Route carried "on" structure: City street 7308,  Year Built: 1993,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 180 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 270 (year 2040),  Design Load: H 15,  Features Intersected: LARGE STREAM,  Facility Carried by Structure: VERNON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.321,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $142,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $175,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA2500000000271,  Location: SEC 1 T 6N R 2W (Lat: 32.393189,  Lng: -90.359986),  Route carried "on" structure: County highway 5034,  Year Built: 1967,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 260 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 390 (year 2040),  Design Load: H 15,  Features Intersected: BCH OF STRAIGHT FENCE CR,  Facility Carried by Structure: WILLIAMSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.379,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $208,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA2500000000275,  Location: SEC 4 T 6N R 2W B (Lat: 32.388528,  Lng: -90.416111),  Route carried "on" structure: County highway 5029,  Year Built: 1978,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 300 (year 2040),  Design Load: H 15,  Features Intersected: FLEETWOOD CR,  Facility Carried by Structure: MT OLIVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.643,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $138,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $170,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA2500000000283,  Location: SEC 15 T 6N R 2W (Lat: 32.358611,  Lng: -90.398611),  Route carried "on" structure: County highway 412,  Year Built: 1961,  Status: Closed,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 180 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 270 (year 2040),  Design Load: H 10,  Features Intersected: BAKERS CREEK,  Facility Carried by Structure: N.NORREL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.598,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Poor,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $208,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Clinton, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.