Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cornwall, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 31Number of bridges
  • 226ft / 69.1mTotal length
  • $68,699,000Total costs
  • 333,188Total average daily traffic
  • 19,121Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cornwall
  • No street view available for this location

New bridges in Cornwall, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11910-1919
  • 31920-1929
  • 21930-1939
  • 61940-1949
  • 61950-1959
  • 31960-1969
  • 11970-1979
  • 11980-1989
  • 21990-1999
  • 22010-2019
  • 32020-2022
Reconstructed bridges in Cornwall, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Cornwall, NY
Average Bridge Truck Traffic in Cornwall, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.0%Excellent
  • 5.0%Very good
  • 10.0%Good
  • 25.0%Satisfactory
  • 30.0%Fair
  • 15.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Excellent
  • 14.3%Very good
  • 19.0%Good
  • 23.8%Satisfactory
  • 19.0%Fair
  • 4.8%Poor
  • 4.8%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 19.0%Excellent
  • 4.8%Very good
  • 9.5%Good
  • 42.9%Satisfactory
  • 19.0%Fair
  • 4.8%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.7%Excellent
  • 40.0%Satisfactory
  • 53.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Excellent
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 1007209,  Location: 4.6 MI N JCT US9W & SH293 (Lat: 41.420411,  Lng: -74.027564),  Route carried "on" structure: US 9W,  Year Built: 1937,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 13,013 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,074 (year 2040),  Design Load: H 20,  Features Intersected: BLACK FOREST CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.364,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $334,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $530,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 100721,  Location: 6.6 MI N JCT RTS 9W+293 (Lat: 41.427636,  Lng: -74.042169),  Route carried "on" structure: County highway ,  Year Built: 2021,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 3,675 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,547 (year 2040),  Design Load: HL 93,  Features Intersected: 9W 9W83021111 NB, 9W 9,  Facility Carried by Structure: ANGOLA ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 13.178,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1007229,  Location: 7 MI N JCT US 9W & SH 293 (Lat: 41.432839,  Lng: -74.044867),  Route carried "on" structure: US 9,  Year Built: 2021,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 13,338 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,400 (year 2040),  Design Load: HL 93,  Features Intersected: COUNTY ROAD 107 - QUAKER
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 18.552,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 32 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 20.8m (68.2ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 100723,  Location: .6 MI SW JCT US9W & SH218 (Lat: 41.441481,  Lng: -74.041592),  Route carried "on" structure: County highway ,  Year Built: 1941,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 1,124 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,390 (year 2040),  Design Load: H 20,  Features Intersected: RTE 9W,  Facility Carried by Structure: WILLOW AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.076,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,210,000,  Roadway Improvement Cost: $1,294,000,  Total Project Cost: $3,505,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1007249,  Location: 8.3 MI N JCT RTS 9W + 293 (Lat: 41.449075,  Lng: -74.032336),  Route carried "on" structure: US 9W,  Year Built: 1941,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 11,368 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,421 (year 2040),  Design Load: H 20,  Features Intersected: RTE 218
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.708,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,866,000,  Roadway Improvement Cost: $1,092,000,  Total Project Cost: $2,958,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102224,  Location: 1.6 MI S JCT RTS 32+94 (Lat: 41.433094,  Lng: -74.054192),  Route carried "on" structure: State highway 32,  Year Built: 1932,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 15,896 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 19,310 (year 2040),  Design Load: HS 20,  Features Intersected: MOODNA CREEK
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 15.961,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 53.3m (174.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.48m (17.98ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $6,414,000,  Roadway Improvement Cost: $3,756,000,  Total Project Cost: $10,169,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222312,  Location: 4.2 MI SW OF CORNWALL (Lat: 41.404869,  Lng: -74.077969),  Route carried "on" structure: ServiceOther road ,  Year Built: 2016,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 967 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,354 (year 2038),  Design Load: HL 93,  Features Intersected: WOODBURY CREEK,  Facility Carried by Structure: TAYLOR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.639,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Superstructure: Very good,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $505,000,  Roadway Improvement Cost: $296,000,  Total Project Cost: $800,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 222313,  Location: 1.5 MI SW OF CORNWALL (Lat: 41.424603,  Lng: -74.029389),  Route carried "on" structure: Other road ,  Year Built: 1920,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 204 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 286 (year 2036),  Features Intersected: IDLEWILD CREEK,  Facility Carried by Structure: BOULEVARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $299,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $474,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 321012,  Location: 4.9 MI N OF LUDLOWVILLE (Lat: 42.622944,  Lng: -76.537700),  Route carried "on" structure: Other road ,  Year Built: 1977,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 213 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 298 (year 2036),  Design Load: HS 20,  Features Intersected: SALMON CREEK,  Facility Carried by Structure: SALMON CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.109,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $748,000,  Roadway Improvement Cost: $438,000,  Total Project Cost: $1,185,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 321032,  Location: 1 MI SW FREEVLE VIRGIL CK (Lat: 42.504850,  Lng: -76.349675),  Route carried "on" structure: Other road ,  Year Built: 1985,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 524 (year 2016),  Truck Traffic: 11%,  Average Future Daily Traffic: 734 (year 2036),  Design Load: HS 20,  Features Intersected: VIRGIL CREEK,  Facility Carried by Structure: JOHNSON ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.595,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $358,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $567,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334428,  Location: 1.1 MI W OF CORNWALL (Lat: 41.434142,  Lng: -74.035597),  Route carried "on" structure: Other road ,  Year Built: 1940,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,531 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,143 (year 2040),  Design Load: H 15,  Features Intersected: IDLEWILD CREEK,  Facility Carried by Structure: HASBROUCK AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $404,000,  Total Project Cost: $1,093,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334429,  Location: 4.4 MI SW OF CORNWALL (Lat: 41.402081,  Lng: -74.078997),  Route carried "on" structure: Other road ,  Year Built: 1910,  Status: Posted for load,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 25 (year 2016),  Average Future Daily Traffic: 35 (year 2036),  Features Intersected: WOODBURY CREEK,  Facility Carried by Structure: CREAMERY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Channel: Fair,  Operating Rating: 6.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 4.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $1,916,000,  Roadway Improvement Cost: $1,122,000,  Total Project Cost: $3,038,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33443,  Location: 1.0 MI W OF CORNWALL (Lat: 41.436917,  Lng: -74.032983),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,124 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,390 (year 2040),  Design Load: HS 20,  Features Intersected: IDLEWILD CREEK,  Facility Carried by Structure: WILLOW AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.977,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $212,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $336,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334431,  Location: 3.3 MI E WASHINGTONVILLE (Lat: 41.425972,  Lng: -74.087494),  Route carried "on" structure: Other road ,  Year Built: 1966,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 1,483 (year 2015),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,076 (year 2035),  Design Load: HS 20,  Features Intersected: MOODNA CREEK,  Facility Carried by Structure: OTTERKILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.432,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,948,000,  Roadway Improvement Cost: $1,140,000,  Total Project Cost: $3,088,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334432,  Location: 0.8 MI N OF CORNWALL (Lat: 41.452622,  Lng: -74.021033),  Route carried "on" structure: Other road ,  Year Built: 1962,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,452 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,033 (year 2038),  Design Load: H 20,  Features Intersected: IDLEWILD CREEK,  Facility Carried by Structure: SHORE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $989,000,  Roadway Improvement Cost: $579,000,  Total Project Cost: $1,568,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334433,  Location: 2.7 MI SW OF CORNWALL (Lat: 41.409317,  Lng: -74.073336),  Route carried "on" structure: County highway ,  Year Built: 1969,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 501 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 619 (year 2040),  Design Load: HS 20,  Features Intersected: MOODNA CREEK,  Facility Carried by Structure: PLEASANT HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,631,000,  Roadway Improvement Cost: $955,000,  Total Project Cost: $2,586,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334543,  Location: 0.9 MI W OF CORNWALL (Lat: 41.443000,  Lng: -74.029036),  Route carried "on" structure: County highway ,  Year Built: 1929,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,350 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,670 (year 2040),  Features Intersected: IDLEWILD CREEK,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.350,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 39.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 11.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $575,000,  Roadway Improvement Cost: $337,000,  Total Project Cost: $912,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334544,  Location: 1.0 MI W OF CORNWALL (Lat: 41.434814,  Lng: -74.035500),  Route carried "on" structure: County highway ,  Year Built: 1929,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 5,623 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,957 (year 2040),  Features Intersected: IDLEWILD CREEK,  Facility Carried by Structure: MAIN STREET CR9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.159,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 51.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $753,000,  Roadway Improvement Cost: $441,000,  Total Project Cost: $1,194,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 55143,  Location: 1.8 MI S JCT CR20 & I87 (Lat: 41.406353,  Lng: -74.080119),  Route carried "on" structure: Other road ,  Year Built: 1953,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 967 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,354 (year 2038),  Design Load: HS 20,  Features Intersected: 87IX (SB), RTE I87,  Facility Carried by Structure: TAYLOR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.12m (20.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,368,000,  Roadway Improvement Cost: $1,387,000,  Total Project Cost: $3,754,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5514319,  Location: 3.0 MI S JCT RTS 94(Lat: 41.409339,  Lng: -74.077108),  Route carried "on" structure: Interstate 87,  Year Built: 1953,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 39,792 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 67,383 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MOODNA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.206,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.0m (101.7ft),  Curb-To-Curb Width: 33.2m (108.9ft),  Out-to-Out Width: 34.1m (111.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.09m (19.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $8,143,000,  Roadway Improvement Cost: $4,769,000,  Total Project Cost: $12,912,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 551432,  Location: 2.9 MI S JCT RTS 94 & I87 (Lat: 41.412142,  Lng: -74.073633),  Route carried "on" structure: County highway ,  Year Built: 1953,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 501 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 619 (year 2040),  Design Load: HS 20,  Features Intersected: 87IX, RTE I87,  Facility Carried by Structure: CR-79
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.142,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.65m (25.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,001,000,  Roadway Improvement Cost: $1,757,000,  Total Project Cost: $4,759,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 551433,  Location: 1.6 MI S. RTS 94 & I87 (Lat: 41.429725,  Lng: -74.068278),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 3,991 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,848 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 87IX - Northbound, RTE I,  Facility Carried by Structure: County Road 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.020,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.4m (149.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.04m (26.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,230,000,  Roadway Improvement Cost: $1,891,000,  Total Project Cost: $5,121,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5514349,  Location: 1.2 MI S JCT SH 94 & I87 (Lat: 41.434986,  Lng: -74.067803),  Route carried "on" structure: Interstate 87,  Year Built: 1953,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 39,792 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 67,383 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: ABAND. RR (NY ONT AND WE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.295,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 33.2m (108.9ft),  Skew: 31 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 31.5m (103.3ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 81.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $5,140,000,  Roadway Improvement Cost: $3,010,000,  Total Project Cost: $8,150,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1007229,  Location: 7 MI N JCT US 9W & SH 293 (Lat: 41.432839,  Lng: -74.044867),  Route carried "under" structure: County highway ,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 12,767 (year 2018),  Truck Traffic: 3%,  Features Intersected: COUNTY ROAD 107 - QUAKER,  Facility Carried by Structure: RTE 9
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 100723,  Location: .6 MI SW JCT US9W & SH218 (Lat: 41.441481,  Lng: -74.041592),  Route carried "under" structure: US 9W,  Year Built: 1941,  Structure Length: 0. m,  Average Daily Traffic: 13,183 (year 1998),  Features Intersected: RTE 9W,  Facility Carried by Structure: WILLOW AVENUE
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 19.742,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 1007249,  Location: 8.3 MI N JCT RTS 9W + 293 (Lat: 41.449075,  Lng: -74.032336),  Route carried "under" structure: State highway 218,  Year Built: 1941,  Structure Length: 0. m,  Average Daily Traffic: 9,450 (year 1978),  Features Intersected: RTE 218,  Facility Carried by Structure: RTE 9W
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 20.804,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 55143,  Location: 1.8 MI S JCT CR20 & I87 (Lat: 41.406353,  Lng: -74.080119),  Route carried "under" structure: Interstate 87,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 51,500 (year 2014),  Features Intersected: 87IX (SB), RTE I87,  Facility Carried by Structure: TAYLOR RD
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 84.585,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 551432,  Location: 2.9 MI S JCT RTS 94 & I87 (Lat: 41.412142,  Lng: -74.073633),  Route carried "under" structure: Interstate 87,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 48,006 (year 2014),  Features Intersected: 87IX, RTE I87,  Facility Carried by Structure: CR-79
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 85.438,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 551433,  Location: 1.6 MI S. RTS 94 & I87 (Lat: 41.429725,  Lng: -74.068278),  Route carried "under" structure: Interstate 87,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 31,562 (year 1990),  Features Intersected: 87IX - Northbound, RTE I,  Facility Carried by Structure: County Road 20
Minimum Vertical Clearance: 6.81m (22.34ft),  Kilometerpoint: 87.481,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.4m (149.0ft)

Find on map >>   Show street view

Structure Number: 70349,  Location: 2.2 MI SW JCT SH94 & I87 (Lat: 41.435772,  Lng: -74.101281),  Route carried "under" structure: State highway 94,  Year Built: 1940,  Structure Length: 0. m,  Average Daily Traffic: 7,766 (year 1999),  Features Intersected: RTE 94,  Facility Carried by Structure: MNRR PJ LINE
Minimum Vertical Clearance: 8.71m (28.58ft),  Kilometerpoint: 43.057,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 771296,  Location: 4.6 MI WEST OF CORNWALL (Lat: 41.426450,  Lng: -74.097408),  Route carried "under" structure: County highway ,  Year Built: 1907,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2015),  Truck Traffic: 2%,  Features Intersected: ORRS MILLS R CR20, OTTER,  Facility Carried by Structure: MNRR PJ LINE
Minimum Vertical Clearance: 22.86m (75.00ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Discuss Cornwall, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.