Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cottonton-Seale, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 148ft / 45.3mTotal length
  • $18,503,000Total costs
  • 52,778Total average daily traffic
  • 7,694Total average daily truck traffic
  • 80,770Total future (year 2028) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cottonton-Seale
  • No street view available for this location

New bridges in Cottonton-Seale, AL - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 21920-1929
  • 51950-1959
  • 11960-1969
  • 11970-1979
  • 41980-1989
Average Bridge Daily Traffic in Cottonton-Seale, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 66.7%Satisfactory
  • 33.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 66.7%Good
  • 33.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 66.7%Good
  • 33.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 35.7%Good
  • 42.9%Satisfactory
  • 21.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 18.2%Good
  • 72.7%Satisfactory
  • 9.1%Fair
Find on map >>   Show street view

Structure Number: 117,  Location: 6.0 MI East I-20/59 (Lat: 32.875286,  Lng: -87.869097),  Route carried "on" structure: US 11,  Year Built: 1918,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2,088 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,896 (year 2039),  Design Load: H 15,  Features Intersected: Trib. to Minters Creek,  Facility Carried by Structure: AL-7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 76.103,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $287,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $316,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 354,  Location: 1.9 MI E OF HATCHECHUBBEE (Lat: 32.277972,  Lng: -85.254556),  Route carried "on" structure: State highway 26,  Year Built: 1926,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,670 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,038 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.807,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 75.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $352,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 355,  Location: 0.1 MI W JCT US 431 (Lat: 32.298372,  Lng: -85.170975),  Route carried "on" structure: County highway 18,  Year Built: 1926,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,370 (year 2003),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,700 (year 2034),  Design Load: H 15,  Features Intersected: SILVER RUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $272,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $299,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4451,  Location: 7.8 MI N COTTONTON (Lat: 32.240000,  Lng: -85.003333),  Route carried "on" structure: State highway 165,  Year Built: 1952,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 3,240 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,953 (year 2033),  Design Load: H 15,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.948,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 40.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $254,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $279,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4452,  Location: 7.5 MI S PHENIX CITY (Lat: 32.305000,  Lng: -85.010333),  Route carried "on" structure: State highway 165,  Year Built: 1952,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 8,510 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 10,384 (year 2033),  Design Load: H 15,  Features Intersected: SWEETWATER BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.436,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $303,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7493,  Location: SR 165 * HATCHECHUBBEE CK (Lat: 32.139750,  Lng: -85.066000),  Route carried "on" structure: State highway 165,  Year Built: 1961,  Status: Open,  Structure Length: 11.25m (36.91ft),  Average Daily Traffic: 2,080 (year 2013),  Truck Traffic: 19%,  Average Future Daily Traffic: 2,538 (year 2033),  Design Load: HS 20,  Features Intersected: HATCHECHUBBEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.770,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 36.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.13m (39.80ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $2,495,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $2,745,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 117,  Location: 4.5 MI N JCT US 431 (Lat: 32.377706,  Lng: -85.180939),  Route carried "on" structure: State highway 169,  Year Built: 1976,  Status: Open,  Structure Length: 19.60m (64.30ft),  Average Daily Traffic: 2,090 (year 2013),  Truck Traffic: 17%,  Average Future Daily Traffic: 2,798 (year 2033),  Design Load: HS 20,  Features Intersected: UCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.117,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 13,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 53.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 20.16m (66.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $6,498,000,  Roadway Improvement Cost: $650,000,  Total Project Cost: $7,148,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1356,  Location: 3.8 MI N OF PITTSVIEW (Lat: 32.243250,  Lng: -85.166222),  Route carried "on" structure: US 431,  Year Built: 1985,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 8,100 (year 2009),  Truck Traffic: 14%,  Average Future Daily Traffic: 16,120 (year 2034),  Design Load: HS 20,  Features Intersected: WATERMELON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 149.671,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,063,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $2,269,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13561,  Location: 0.3 MI S JCT SR 26 (Lat: 32.292283,  Lng: -85.169233),  Route carried "on" structure: County highway 137,  Year Built: 1985,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 7,450 (year 2003),  Truck Traffic: 14%,  Average Future Daily Traffic: 14,820 (year 2028),  Design Load: HS 20,  Features Intersected: SILVER RUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $448,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $493,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13937,  Location: 2.3 MI WEST OF SEALE (Lat: 32.288167,  Lng: -85.215778),  Route carried "on" structure: State highway 26,  Year Built: 1986,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 1,670 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,038 (year 2033),  Design Load: HS 20,  Features Intersected: WEOLUSTEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.471,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $836,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $920,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13938,  Location: 1 MI WEST OF SEALE (Lat: 32.297072,  Lng: -85.196797),  Route carried "on" structure: State highway 26,  Year Built: 1986,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 2,080 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 2,538 (year 2033),  Design Load: HS 20,  Features Intersected: WATERMELON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.560,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,474,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $1,621,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14711,  Location: 0.6 MI NORTH COTTONTON (Lat: 32.154556,  Lng: -85.058472),  Route carried "on" structure: State highway 165,  Year Built: 1955,  Status: Open,  Structure Length: 0.71m (2.33ft),  Average Daily Traffic: 3,810 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,649 (year 2033),  Design Load: H 15,  Features Intersected: ROCKY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.502,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.36m (4.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $704,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $774,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14712,  Location: 4.4 MI NORTH COTTONTON (Lat: 32.201750,  Lng: -85.029917),  Route carried "on" structure: State highway 165,  Year Built: 1955,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,810 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,649 (year 2033),  Design Load: HS 20,  Features Intersected: BLUFF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.733,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $526,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $579,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14713,  Location: 5.7 MI NORTH COTTONTON (Lat: 32.213194,  Lng: -85.012333),  Route carried "on" structure: State highway 165,  Year Built: 1955,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 3,810 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,649 (year 2033),  Design Load: HS 20,  Features Intersected: SNAKE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.760,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.1m (13.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 55.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $368,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $405,000 ( Estimate for 2022)
Discuss Cottonton-Seale, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.