Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Decatur, Illinois (IL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 157Number of bridges
  • 1,893ft / 577mTotal length
  • $33,994,000Total costs
  • 927,425Total average daily traffic
  • 94,922Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Decatur
  • No street view available for this location

New bridges in Decatur, IL - historical statistics
  • New bridges - historical statistics
  • 151900-1909
  • 11910-1919
  • 21920-1929
  • 71930-1939
  • 21940-1949
  • 81950-1959
  • 211960-1969
  • 491970-1979
  • 171980-1989
  • 201990-1999
  • 32000-2009
  • 112010-2019
  • 12020-2022
Reconstructed bridges in Decatur, IL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 11970-1979
  • 71980-1989
  • 61990-1999
  • 32000-2009
Average Bridge Daily Traffic in Decatur, IL
Average Bridge Truck Traffic in Decatur, IL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.2%Excellent
  • 8.1%Very good
  • 9.3%Good
  • 50.0%Satisfactory
  • 20.9%Fair
  • 5.8%Poor
  • 3.5%Serious
  • 1.2%Critical
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 1.2%Excellent
  • 10.5%Very good
  • 15.1%Good
  • 34.9%Satisfactory
  • 22.1%Fair
  • 9.3%Poor
  • 4.7%Serious
  • 2.3%Critical
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.2%Excellent
  • 10.5%Very good
  • 33.7%Good
  • 33.7%Satisfactory
  • 16.3%Fair
  • 3.5%Poor
  • 1.2%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.3%Excellent
  • 18.2%Very good
  • 33.8%Good
  • 27.3%Satisfactory
  • 11.7%Fair
  • 6.5%Poor
  • 1.3%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 22.2%Very good
  • 22.2%Good
  • 38.9%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 580101,  Location: 1 MI S OF DECATUR (Lat: 39.785328,  Lng: -88.978142),  Route carried "under" structure: Other road ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 6,350 (year 2020),  Truck Traffic: 10%,  Features Intersected: FA 710/IC RR (BS 51),  Facility Carried by Structure: FAP 322(NB) (US 5
Minimum Vertical Clearance: 8.66m (28.41ft),  Kilometerpoint: 14.323,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 580102,  Location: 1 MI S OF DECATUR (Lat: 39.785553,  Lng: -88.978083),  Route carried "under" structure: Other road ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 6,350 (year 2020),  Truck Traffic: 10%,  Features Intersected: FA 710/IC RR (BS 51),  Facility Carried by Structure: FAP 322(SB) (US 51
Minimum Vertical Clearance: 8.59m (28.18ft),  Kilometerpoint: 14.307,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 580104,  Location: 1 MI S OF DECATUR (Lat: 39.785844,  Lng: -88.980989),  Route carried "under" structure: Other road ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 275 (year 2020),  Truck Traffic: 4%,  Features Intersected: FAU 7426(TAYLOR RD),  Facility Carried by Structure: FAP 322(NB) (US 5
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 4.055,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.9m (88.3ft)

Find on map >>   Show street view

Structure Number: 580105,  Location: 1 MI S OF DECATUR (Lat: 39.785547,  Lng: -88.980981),  Route carried "under" structure: Other road ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 275 (year 2020),  Truck Traffic: 4%,  Features Intersected: FAU 7426(TAYLOR RD),  Facility Carried by Structure: FAP 322(SB) (US 5
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 4.088,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.9m (88.3ft)

Find on map >>   Show street view

Structure Number: 580108,  Location: .5 MI SW OF DECATUR (Lat: 39.799903,  Lng: -89.008189),  Route carried "under" structure: State highway 48,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 4,250 (year 2021),  Truck Traffic: 12%,  Features Intersected: IL 48 & N&S RR,  Facility Carried by Structure: FAP 322(SB)(US 51)
Minimum Vertical Clearance: 7.09m (23.26ft),  Kilometerpoint: 78.840,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.4m (122.7ft)

Find on map >>   Show street view

Structure Number: 580109,  Location: .5 MI SW OF DECATUR (Lat: 39.800158,  Lng: -89.007897),  Route carried "under" structure: State highway 48,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 4,250 (year 2021),  Truck Traffic: 12%,  Features Intersected: IL 48 & N&S RR,  Facility Carried by Structure: FAP 322(NB)(US 51)
Minimum Vertical Clearance: 7.06m (23.16ft),  Kilometerpoint: 78.872,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.4m (122.7ft)

Find on map >>   Show street view

Structure Number: 580121,  Location: FAIRVIEW(DECATUR) (Lat: 39.847319,  Lng: -88.977519),  Route carried "under" structure: State highway 48,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 12,500 (year 2021),  Truck Traffic: 4%,  Features Intersected: FAU 7429(IL 48),  Facility Carried by Structure: N&S RR
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 85.406,  Lanes under structure: 4,  Material/Design: Steel,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 580122,  Location: 2 MI S OF ELWIN (Lat: 39.765639,  Lng: -88.980675),  Route carried "under" structure: US 51,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 2,600 (year 2021),  Truck Traffic: 18%,  Features Intersected: FAP 322(US 51),  Facility Carried by Structure: FAP 710(NB BS RT 5
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 333.640,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 580123,  Location: 2 MI S OF ELWIN (Lat: 39.765761,  Lng: -88.980439),  Route carried "under" structure: US 51,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 2,600 (year 2021),  Truck Traffic: 18%,  Features Intersected: FAP 322(US 51),  Facility Carried by Structure: TR 114B(RILEY RD)
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 333.672,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 580124,  Location: .5 MI E OF ELWIN (Lat: 39.777603,  Lng: -88.969292),  Route carried "under" structure: US 51,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 2,600 (year 2021),  Truck Traffic: 18%,  Features Intersected: FAP 322(US 51),  Facility Carried by Structure: FAS 552(CH 30)
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 335.507,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 580127,  Location: IN DECATUR (Lat: 39.846875,  Lng: -88.977511),  Route carried "under" structure: State highway 48,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 12,500 (year 2021),  Truck Traffic: 4%,  Features Intersected: FAU 7429(IL 48),  Facility Carried by Structure: FAP 323(US 36)
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 85.357,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 580136,  Location: S EDGE FORSYTH (Lat: 39.908144,  Lng: -88.955361),  Route carried "under" structure: Interstate 72,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2021),  Truck Traffic: 29%,  Features Intersected: I-72,  Facility Carried by Structure: FAP 322(US 51)
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 227.668,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.3m (125.7ft)

Find on map >>   Show street view

Structure Number: 583013,  Location: 0.3 MI S OF FAU 7369 (Lat: 39.859094,  Lng: -88.897969),  Route carried "under" structure: Other road ,  Year Built: 1932,  Structure Length: 0. m,  Average Daily Traffic: 8,850 (year 2020),  Truck Traffic: 9%,  Features Intersected: BRUSH COLLEGE(U 7448,  Facility Carried by Structure: N&W RR
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 4.876,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 8.3m (27.2ft)

Find on map >>   Show street view

Structure Number: 583014,  Location: 0.33 M S OF FAU 7369 (Lat: 39.858661,  Lng: -88.897961),  Route carried "under" structure: Other road ,  Year Built: 1932,  Structure Length: 0. m,  Average Daily Traffic: 8,850 (year 2020),  Truck Traffic: 9%,  Features Intersected: BRUSH COLLEGE(U 7448,  Facility Carried by Structure: N&W RR
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 4.924,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 8.1m (26.6ft)

Find on map >>   Show street view

Structure Number: 586001,  Location: 1.54 MI E OF US 51 (Lat: 39.862811,  Lng: -88.926789),  Route carried "under" structure: State highway 121,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 14,600 (year 2021),  Truck Traffic: 10%,  Features Intersected: IL 121(FAP 320),  Facility Carried by Structure: GARFIELD AV(FAU 73
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 115.580,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 586004,  Location: 0.1 MI N OF US 36 (Lat: 39.847389,  Lng: -88.963647),  Route carried "under" structure: Other road ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 7,600 (year 2020),  Truck Traffic: 3%,  Features Intersected: MONROE ST(FAU 7432),  Facility Carried by Structure: N&W RR
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 6.502,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 589004,  Location: 1 BLOCK N US 36 (Lat: 39.847853,  Lng: -88.940564),  Route carried "under" structure: Other road ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 8,100 (year 2020),  Truck Traffic: 2%,  Features Intersected: JASPER ST(FAU 7439),  Facility Carried by Structure: RR SWITCH YARDS
Minimum Vertical Clearance: 3.40m (11.15ft),  Kilometerpoint: 3.267,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 12.5m (41.0ft)

Find on map >>   Show street view

Structure Number: 589005,  Location: 1 BLOCK N US 36 (Lat: 39.847375,  Lng: -88.940550),  Route carried "under" structure: Other road ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 8,100 (year 2020),  Truck Traffic: 2%,  Features Intersected: JASPER ST(FAU 7439),  Facility Carried by Structure: RR SWITCH YARDS
Minimum Vertical Clearance: 3.40m (11.15ft),  Kilometerpoint: 3.315,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 12.5m (41.0ft)

Find on map >>   Show street view

Structure Number: 589006,  Location: SW DECATUR (Lat: 39.841081,  Lng: -88.973114),  Route carried "under" structure: Other road ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 3,650 (year 2020),  Truck Traffic: 3%,  Features Intersected: MAIN ST(FAU 7386),  Facility Carried by Structure: N&S RR
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 4.973,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 5899,  Location: W OF PINE ST (Lat: 39.845600,  Lng: -88.967511),  Route carried "under" structure: US 36,  Year Built: 1937,  Structure Length: 0. m,  Average Daily Traffic: 12,200 (year 2021),  Truck Traffic: 6%,  Features Intersected: US 36(FAP 323),  Facility Carried by Structure: N&S RR
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 222.856,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 589904,  Location: W LAKE SHORE BR (Lat: 39.828789,  Lng: -88.958711),  Route carried "under" structure: City street ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 3%,  Features Intersected: LINCOLN PKRD(U 7392),  Facility Carried by Structure: IC RR
Minimum Vertical Clearance: 6.12m (20.08ft),  Kilometerpoint: 0.016,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 589905,  Location: E OF BROADWAY (Lat: 39.842697,  Lng: -88.948317),  Route carried "under" structure: Other road ,  Year Built: 1915,  Structure Length: 0. m,  Average Daily Traffic: 1,650 (year 2020),  Truck Traffic: 5%,  Features Intersected: PRAIRIE ST(FAU 7385),  Facility Carried by Structure: IC RR
Minimum Vertical Clearance: 4.11m (13.48ft),  Kilometerpoint: 0.418,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 7.6m (24.9ft)

Find on map >>   Show street view

Structure Number: 589906,  Location: IN DECATUR (Lat: 39.834486,  Lng: -88.976003),  Route carried "under" structure: City street ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 275 (year 2020),  Truck Traffic: 1%,  Features Intersected: SUNSET AVE(MS 2480B),  Facility Carried by Structure: N&S RR
Minimum Vertical Clearance: 10.67m (35.01ft),  Kilometerpoint: 0.097,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 589907,  Location: EAST OF ILL 48 (Lat: 39.836972,  Lng: -88.975786),  Route carried "under" structure: City street ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 450 (year 2020),  Truck Traffic: 1%,  Features Intersected: FOREST AVE(MS 2450A),  Facility Carried by Structure: N&S RR
Minimum Vertical Clearance: 3.48m (11.42ft),  Kilometerpoint: 0.129,  Lanes under structure: 2,  Material/Design: Concrete,  Length of Maximum Span: 5.2m (17.1ft)

Find on map >>   Show street view

Structure Number: 589909,  Location: AT W MAIN (Lat: 39.841631,  Lng: -88.972750),  Route carried "under" structure: Other road ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 3%,  Features Intersected: OAKLAND AVE(FAU 7430,  Facility Carried by Structure: N&W RR
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 1.593,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 58991,  Location: S SIDE OF DECATUR (Lat: 39.846919,  Lng: -88.968261),  Route carried "under" structure: City street ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 1,800 (year 2020),  Truck Traffic: 6%,  Features Intersected: VAN DYKE ST(MS 6750E,  Facility Carried by Structure: N&W RR
Minimum Vertical Clearance: 3.78m (12.40ft),  Kilometerpoint: 0.869,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 589912,  Location: 3 BLKS E BROADWAY (Lat: 39.855058,  Lng: -88.945508),  Route carried "under" structure: Other road ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 8,300 (year 2020),  Truck Traffic: 3%,  Features Intersected: GRAND AVE(FAU 7374),  Facility Carried by Structure: IC RR
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 7.451,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 589913,  Location: 3 BLKS W OF JASPER (Lat: 39.852911,  Lng: -88.946414),  Route carried "under" structure: Other road ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 900 (year 2020),  Truck Traffic: 1%,  Features Intersected: CONDIT ST(FAU 7375),  Facility Carried by Structure: IC RR
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.821,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 589914,  Location: N OF NELSON PK RD (Lat: 39.836242,  Lng: -88.913225),  Route carried "under" structure: Other road ,  Year Built: 1928,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2021),  Truck Traffic: 5%,  Features Intersected: LAKE SHORE DR(U 7390,  Facility Carried by Structure: CSX RR
Minimum Vertical Clearance: 3.43m (11.25ft),  Kilometerpoint: 3.573,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 11.9m (39.0ft)

Find on map >>   Show street view

Structure Number: 589915,  Location: SW CL OF DECATUR (Lat: 39.823931,  Lng: -88.961011),  Route carried "under" structure: Other road ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 5%,  Features Intersected: FAP 714 FR 0.01,  Facility Carried by Structure: IC RR
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.225,  Lanes under structure: 2,  Material/Design: Wood or Timber,  Length of Maximum Span: 13.7m (44.9ft)

Discuss Decatur, Illinois (IL) on our hugely popular Illinois forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.