  • National Bridge Inventory (NBI) Statistics
  • 97Number of bridges
  • 807ft / 246mTotal length
  • $108,836,000Total costs
  • 609,951Total average daily traffic
  • 46,663Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Dothan
  • No street view available for this location

New bridges in Dothan, AL - historical statistics
  • New bridges - historical statistics
  • 61920-1929
  • 51930-1939
  • 11940-1949
  • 151950-1959
  • 171960-1969
  • 201970-1979
  • 91980-1989
  • 71990-1999
  • 132000-2009
  • 42010-2019
Reconstructed bridges in Dothan, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 21970-1979
  • 11980-1989
  • 01990-1999
  • 12000-2009
  • 22010-2019
Average Bridge Daily Traffic in Dothan, AL
Average Bridge Truck Traffic in Dothan, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 17.0%Excellent
  • 12.8%Very good
  • 19.1%Good
  • 21.3%Satisfactory
  • 29.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 19.1%Excellent
  • 12.8%Very good
  • 14.9%Good
  • 36.2%Satisfactory
  • 17.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 17.0%Excellent
  • 12.8%Very good
  • 23.4%Good
  • 29.8%Satisfactory
  • 17.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Excellent
  • 10.0%Very good
  • 31.3%Good
  • 38.8%Satisfactory
  • 13.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 2.2%Excellent
  • 2.2%Very good
  • 30.4%Good
  • 41.3%Satisfactory
  • 23.9%Fair
Find on map >>   Show street view

Structure Number: 11177,  Location: DOTHAN (Lat: 31.194531,  Lng: -85.384117),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 420 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2041),  Design Load: H 15,  Features Intersected: STREAM,  Facility Carried by Structure: COE DAIRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.309,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 25.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $435,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $479,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11197,  Location: 0.5 MI.E. U.S. 231 (Lat: 31.223067,  Lng: -85.383550),  Route carried "on" structure: US 84,  Year Built: 1974,  Status: Open,  Structure Length: 11.25m (36.91ft),  Average Daily Traffic: 9,995 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,409 (year 2033),  Design Load: HS 20,  Features Intersected: RANGE ST C/GA * BAYL R R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 338.770,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 86.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.13m (39.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,659,000,  Roadway Improvement Cost: $366,000,  Total Project Cost: $4,025,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11198,  Location: 0.5 MI E. US 231 (Lat: 31.223033,  Lng: -85.383053),  Route carried "on" structure: US 84,  Year Built: 1974,  Status: Open,  Structure Length: 11.25m (36.91ft),  Average Daily Traffic: 9,995 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,409 (year 2033),  Design Load: HS 20,  Features Intersected: RANGE ST C/GA * BAYL R R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 338.770,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 86.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.13m (39.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,659,000,  Roadway Improvement Cost: $366,000,  Total Project Cost: $4,025,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11199,  Location: 1.2 MI. E. U.S. 231 (Lat: 31.221283,  Lng: -85.371433),  Route carried "on" structure: US 84,  Year Built: 1974,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 17,300 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 23,209 (year 2033),  Design Load: HS 20,  Features Intersected: DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 339.995,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,195,000,  Roadway Improvement Cost: $220,000,  Total Project Cost: $2,415,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11302,  Location: 1 MI. E. SR.210 (Lat: 31.210350,  Lng: -85.355533),  Route carried "on" structure: US 84,  Year Built: 1927,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 20,960 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 28,119 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 341.912,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $939,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,033,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11615,  Location: DOTHAN (Lat: 31.223331,  Lng: -85.374614),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 1,890 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,295 (year 2041),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: PLANT ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.17m (7.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,240,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,364,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11799,  Location: 5.6 MI.E.JCT.SR 123 (Lat: 31.238733,  Lng: -85.539383),  Route carried "on" structure: US 84,  Year Built: 1977,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 9,045 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 12,134 (year 2033),  Design Load: HS 20,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 323.533,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Underwater Inspection Date: January 2021,  Bridge Improvement Cost: $1,830,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $2,013,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 118,  Location: 5.6 MI.E.JCT.SR-123 (Lat: 31.239028,  Lng: -85.539367),  Route carried "on" structure: US 84,  Year Built: 1977,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 9,045 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 12,134 (year 2033),  Design Load: HS 20,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 323.533,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Underwater Inspection Date: January 2021,  Bridge Improvement Cost: $1,830,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $2,013,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11948,  Location: US 231 TO CO RD 19 (Lat: 31.130303,  Lng: -85.400236),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 1.75m (5.74ft),  Average Daily Traffic: 240 (year 1992),  Truck Traffic: 3%,  Average Future Daily Traffic: 850 (year 2033),  Features Intersected: CYPRESS CREEK,  Facility Carried by Structure: IRIS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $752,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $827,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11949,  Location: TRELAWNY FARMS (Lat: 31.134392,  Lng: -85.363869),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 84 (year 1993),  Average Future Daily Traffic: 325 (year 2033),  Design Load: HS 20,  Features Intersected: MEMPHIS CH BRANCH,  Facility Carried by Structure: QUAIL DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11971,  Location: DOTHAN (Lat: 31.229336,  Lng: -85.352331),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,810 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,857 (year 2041),  Design Load: H 15,  Features Intersected: STREAM,  Facility Carried by Structure: E.BURDESHAW AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $440,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12135,  Location: 0.5 N. OLD KINSEY RD. (Lat: 31.262189,  Lng: -85.375008),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,260 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,192 (year 2041),  Features Intersected: ROCKY BRANCH,  Facility Carried by Structure: ROCKY BRANCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12166,  Location: DOTHAN (Lat: 31.254900,  Lng: -85.448600),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 2,100 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,942 (year 2041),  Design Load: H 15,  Features Intersected: LITTLE CHOCTAWHATCHEE RV,  Facility Carried by Structure: BUENA VISTA DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.810,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 63.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $947,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,042,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12545,  Location: DOTHAN (Lat: 31.206347,  Lng: -85.409592),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 7,415 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,287 (year 2041),  Design Load: HS 15,  Features Intersected: STREAM,  Facility Carried by Structure: SOUTH PARK AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.719,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $587,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $646,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1255,  Location: 4 MI.W.SR-210 (Lat: 31.238467,  Lng: -85.502750),  Route carried "on" structure: US 84,  Year Built: 1981,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 9,310 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,490 (year 2033),  Design Load: HS 20,  Features Intersected: BEAVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 327.112,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 74.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Underwater Inspection Date: January 2021,  Bridge Improvement Cost: $1,787,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $1,966,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12554,  Location: DOTHAN (Lat: 31.205400,  Lng: -85.413400),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 840 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,194 (year 2041),  Features Intersected: STREAM,  Facility Carried by Structure: WOODLAND DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.520,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $388,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $427,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12803,  Location: .2 MI. W. SR 210 (Lat: 31.205883,  Lng: -85.426583),  Route carried "on" structure: State highway 52,  Year Built: 1983,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 13,050 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 17,856 (year 2033),  Design Load: HS 20,  Features Intersected: BEAVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.515,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $749,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $824,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12993,  Location: 0.1 MI. W. JCT. SR 210 (Lat: 31.203125,  Lng: -85.420958),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,700 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,538 (year 2041),  Design Load: H 10,  Features Intersected: MENDHIEM CREEK,  Facility Carried by Structure: TIMBERS DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.019,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $358,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13112,  Location: CIRCLE TO PILGRAM REST CH (Lat: 31.208919,  Lng: -85.475186),  Route carried "on" structure: County highway 40,  Year Built: 1984,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 820 (year 1993),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,150 (year 2033),  Design Load: HS 20,  Features Intersected: PINHOOK CREEK,  Facility Carried by Structure: FORTNER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $615,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $677,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13278,  Location: DOTHAN (Lat: 31.219822,  Lng: -85.406808),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 650 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,174 (year 2041),  Design Load: HS 20,  Features Intersected: FOLKES BRANCH,  Facility Carried by Structure: VIRGINIA DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.319,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $283,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $311,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13461,  Location: SEC-27 T-4-N R-26-E (Lat: 31.286850,  Lng: -85.419106),  Route carried "on" structure: County highway 10,  Year Built: 1985,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 394 (year 2000),  Truck Traffic: 7%,  Average Future Daily Traffic: 585 (year 2034),  Design Load: HS 20,  Features Intersected: LITT.CHOCTAWHATCHEERIVER
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $679,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $747,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13923,  Location: 0.5 MI.N.OLD WEBB ROAD (Lat: 31.250833,  Lng: -85.352369),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 305 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 600 (year 2041),  Design Load: H 15,  Features Intersected: POPULAR SPRINGS BRANCH,  Facility Carried by Structure: DUNN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.520,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $477,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $525,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15158,  Location: 1.6 MI. N. JCT. US 84 (Lat: 31.251156,  Lng: -85.435972),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 26,565 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 50,933 (year 2041),  Design Load: HS 20,  Features Intersected: ROCK CREEK,  Facility Carried by Structure: WESTGATE PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.588,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 23.3m (76.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.29m (23.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,800,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $4,180,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15164,  Location: US 231 TO COWARTS (Lat: 31.143633,  Lng: -85.362031),  Route carried "on" structure: County highway 19,  Year Built: 1990,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 325 (year 1990),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,200 (year 2033),  Design Load: HS 20,  Features Intersected: DOUBLE BRIDGE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 74.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $440,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $484,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15182,  Location: CIRCLE TO PILGRAM REST CH (Lat: 31.215856,  Lng: -85.502525),  Route carried "on" structure: County highway 40,  Year Built: 1990,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 490 (year 1992),  Truck Traffic: 7%,  Average Future Daily Traffic: 900 (year 2033),  Design Load: HS 20,  Features Intersected: NEWTON CREEK,  Facility Carried by Structure: FORTNER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.58m (15.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $848,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $933,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1565,  Location: CO RD 59 TO U.S. 84 (Lat: 31.219997,  Lng: -85.480169),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,230 (year 1999),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,800 (year 2041),  Features Intersected: SPANN BRANCH,  Facility Carried by Structure: FLOWERS CHAPEL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $519,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $571,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15651,  Location: 0.2 S BEVERLYE ROAD (Lat: 31.186242,  Lng: -85.350175),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 0.58m (1.90ft),  Average Daily Traffic: 355 (year 2003),  Truck Traffic: 7%,  Average Future Daily Traffic: 926 (year 2041),  Features Intersected: GOLF CREEK,  Facility Carried by Structure: CURTIS MCCALLISTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $272,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $299,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16126,  Location: .4 MI. W. US 431 (Lat: 31.271314,  Lng: -85.383489),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 6,480 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,600 (year 2041),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: WESTGATE PKWY.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.439,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,423,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $1,565,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16534,  Location: WILSON MILL TO ST PARK (Lat: 31.151953,  Lng: -85.303467),  Route carried "on" structure: County highway 24,  Year Built: 1996,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 680 (year 1996),  Truck Traffic: 25%,  Average Future Daily Traffic: 900 (year 2033),  Design Load: HS 20,  Features Intersected: COWARTS CREEK,  Facility Carried by Structure: LUCY GRADE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.031,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 87.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $802,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $882,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16937,  Location: WILSON MILL TO CO RD 55 (Lat: 31.153736,  Lng: -85.309683),  Route carried "on" structure: County highway 24,  Year Built: 1997,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 580 (year 1997),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,100 (year 2033),  Design Load: HS 20,  Features Intersected: COOPER CREEK,  Facility Carried by Structure: LUCY GRADE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17269,  Location: CO RD 49 TO CO RD 59 (Lat: 31.198728,  Lng: -85.510044),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 160 (year 1996),  Truck Traffic: 4%,  Average Future Daily Traffic: 210 (year 2033),  Design Load: HS 20,  Features Intersected: NEWTON CREEK,  Facility Carried by Structure: CO LINE RD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $1,051,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,156,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 18266,  Location: COWARTS TO US 431 (Lat: 31.258789,  Lng: -85.332225),  Route carried "on" structure: County highway 51,  Year Built: 2002,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 1,104 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,312 (year 2034),  Design Load: HS 20,  Features Intersected: OMUSSEE CREEK,  Facility Carried by Structure: OMUSSEE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,149,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,264,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18581,  Location: CO RD 33 TO US 84 (Lat: 31.165083,  Lng: -85.320375),  Route carried "on" structure: County highway 107,  Year Built: 2002,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 808 (year 2005),  Truck Traffic: 15%,  Average Future Daily Traffic: 500 (year 2033),  Design Load: HS 20,  Features Intersected: COOPER CREEK,  Facility Carried by Structure: SANITARY DAIRY RD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18588,  Location: CO RD 20 TO CO RD 34 (Lat: 31.130644,  Lng: -85.292367),  Route carried "on" structure: County highway 17,  Year Built: 2002,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 245 (year 1993),  Average Future Daily Traffic: 240 (year 2033),  Design Load: HS 20,  Features Intersected: COWARTS CREEK,  Facility Carried by Structure: EDGAR SMITH RD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,051,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,156,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18799,  Location: 1.2 MI N JCT US 84 (Lat: 31.253919,  Lng: -85.460522),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 3,725 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,391 (year 2041),  Design Load: HS 20,  Features Intersected: LITTLE CHOCTAWHATCHEE RI,  Facility Carried by Structure: JOHN D ODOM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.209,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 70.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,841,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $2,025,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19141,  Location: .8 MI.EAST U.S. 84 (Lat: 31.223017,  Lng: -85.362617),  Route carried "on" structure: State highway 52,  Year Built: 2009,  Status: Open,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 4,210 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,760 (year 2033),  Design Load: HS 20,  Features Intersected: C.S.X. RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 105.649,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.77m (25.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,091,000,  Roadway Improvement Cost: $309,000,  Total Project Cost: $3,400,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1956,  Location: DOTHAN (Lat: 31.227103,  Lng: -85.366492),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 590 (year 2005),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,194 (year 2041),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: SUNSET DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.109,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.7m (25.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $405,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $446,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19711,  Location: COWARTS TO US 431 (Lat: 31.249125,  Lng: -85.330017),  Route carried "on" structure: County highway 51,  Year Built: 2007,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 837 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,294 (year 2033),  Design Load: HS 20,  Features Intersected: GOLF CREEK,  Facility Carried by Structure: OMUSSEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.31m (10.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $612,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $673,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19759,  Location: DOTHAN??????????????????? (Lat: 31.215000,  Lng: -85.418333),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,375 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,000 (year 2042),  Design Load: HS 20,  Features Intersected: FOLKES BRANCH???????????,  Facility Carried by Structure: HAISTEN DRIVE?????
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.309,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 88.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $441,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $485,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1976,  Location: DOTHAN??????????????????? (Lat: 31.215000,  Lng: -85.421667),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,045 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,000 (year 2042),  Design Load: HS 20,  Features Intersected: FOLKES BRANCH???????????,  Facility Carried by Structure: BRACEWELL AVENUE??
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.119,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $441,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $485,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Discuss Dothan, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.