  • 113Number of bridges
  • 764ft / 233mTotal length
  • $63,687,000Total costs
  • 238,647Total average daily traffic
  • 27,209Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Duncan
  • No street view available for this location

New bridges in Duncan, OK - historical statistics
  • New bridges - historical statistics
  • 71920-1929
  • 11930-1939
  • 31940-1949
  • 111950-1959
  • 91960-1969
  • 141970-1979
  • 41980-1989
  • 151990-1999
  • 232000-2009
  • 242010-2019
  • 22020-2022
Reconstructed bridges in Duncan, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 21940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 21990-1999
Average Bridge Daily Traffic in Duncan, OK
Average Bridge Truck Traffic in Duncan, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 48.3%Good
  • 33.3%Satisfactory
  • 10.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.0%Excellent
  • 28.3%Very good
  • 16.7%Good
  • 38.3%Satisfactory
  • 11.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.3%Excellent
  • 18.3%Very good
  • 26.7%Good
  • 30.0%Satisfactory
  • 18.3%Fair
  • 3.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.1%Excellent
  • 20.4%Very good
  • 25.8%Good
  • 39.8%Satisfactory
  • 9.7%Fair
  • 3.2%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.3%Very good
  • 30.2%Good
  • 37.2%Satisfactory
  • 16.3%Fair
Find on map >>   Show street view

Structure Number: 1312,  Location: .5E OF US 81 (Lat: 34.452797,  Lng: -97.965086),  Route carried "on" structure: County highway N2820,  Year Built: 1923,  Year Reconstructed: 1951,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 2,500 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,000 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.28m (10.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1342,  Location: 2.6S OF SH 7 (Lat: 34.453881,  Lng: -97.965075),  Route carried "on" structure: County highway N2820,  Year Built: 1923,  Year Reconstructed: 1944,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 2,500 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,000 (year 2040),  Design Load: HS 20,  Features Intersected: CLARIDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $480,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1512,  Location: 12.5 MI W OF VELMA (Lat: 34.492597,  Lng: -97.866019),  Route carried "on" structure: County highway 6911,  Year Built: 1925,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 904 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,446 (year 2040),  Design Load: H 20,  Features Intersected: CREEK,  Facility Carried by Structure: 6920C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.213,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.58m (11.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1513,  Location: 9.7 MI W OF VELMA (Lat: 34.492642,  Lng: -97.817811),  Route carried "on" structure: County highway 6911,  Year Built: 1925,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 904 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,446 (year 2040),  Design Load: H 20,  Features Intersected: CREEK,  Facility Carried by Structure: 6920C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.622,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.58m (11.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1701,  Location: 15.8 MI W OF VELMA (Lat: 34.492581,  Lng: -97.922050),  Route carried "on" structure: County highway 6911,  Year Built: 1926,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 904 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,446 (year 2040),  Design Load: H 20,  Features Intersected: COW CREEK O'FLOW,  Facility Carried by Structure: 6920C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.52m (11.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1702,  Location: 15.3 MI W OF VELMA (Lat: 34.492358,  Lng: -97.913489),  Route carried "on" structure: County highway 6911,  Year Built: 1926,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 904 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,446 (year 2040),  Design Load: H 20,  Features Intersected: COW CREEK O'FLOW,  Facility Carried by Structure: 6920C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.58m (11.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1719,  Location: 15.7 MI W OF VELMA (Lat: 34.492592,  Lng: -97.919961),  Route carried "on" structure: County highway 6911,  Year Built: 1926,  Status: Posted for load,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 904 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,446 (year 2040),  Design Load: H 20,  Features Intersected: COW CREEK,  Facility Carried by Structure: 6920C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $201,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $319,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 497,  Location: 6.4 MI W JCT SH 76 (Lat: 34.637783,  Lng: -97.709372),  Route carried "on" structure: State highway 29,  Year Built: 1936,  Year Reconstructed: 1940,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 1,800 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,880 (year 2040),  Design Load: H 20,  Features Intersected: BLACK BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.186,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.92m (16.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $435,000,  Roadway Improvement Cost: $717,000,  Total Project Cost: $1,217,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8723,  Location: 5.6 MI W JCT SH 76 (Lat: 34.637764,  Lng: -97.696881),  Route carried "on" structure: State highway 29,  Year Built: 1940,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,800 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,880 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.312,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 8898,  Location: BETW 4TH & 5 ST (Lat: 34.498344,  Lng: -97.952664),  Route carried "on" structure: City street E1736,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 400 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 640 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.73m (12.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $191,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $303,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11467,  Location: 1.S .2W 81 & 7 (Lat: 34.579739,  Lng: -97.971644),  Route carried "on" structure: County highway E1680,  Year Built: 1950,  Status: Posted for load,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 10.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 7.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.66m (8.73ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $136,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11816,  Location: 3.1W OF US 81 (Lat: 34.536111,  Lng: -98.021608),  Route carried "on" structure: County highway E1710,  Year Built: 1950,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 3.28m (10.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $265,000 ( Estimate for 2015),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11827,  Location: 7.1 E 4. S OF US 81 (Lat: 34.434503,  Lng: -97.841467),  Route carried "on" structure: County highway E1780,  Year Built: 1991,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 30.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.28m (10.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $265,000 ( Estimate for 2015),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1219,  Location: 6.6 E 4. S OF US 81 (Lat: 34.434522,  Lng: -97.848794),  Route carried "on" structure: County highway E1780,  Year Built: 1950,  Year Reconstructed: 1990,  Status: Posted for load,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 10,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 21.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.59m (15.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 12957,  Location: 4.0 MI W JCT SH76 (Lat: 34.637744,  Lng: -97.669433),  Route carried "on" structure: State highway 29,  Year Built: 1953,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,600 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,560 (year 2040),  Design Load: HS 20,  Features Intersected: WEST FISH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.821,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13161,  Location: 0.1 MI W OF US 81 (Lat: 34.514250,  Lng: -97.967403),  Route carried "on" structure: City street E1725,  Year Built: 1954,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,268 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,629 (year 2040),  Design Load: HS 20,  Features Intersected: COW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 13162,  Location: BRTW 2ND & 4 ST (Lat: 34.514231,  Lng: -97.947633),  Route carried "on" structure: City street E1725,  Year Built: 1957,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,961 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,138 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1318,  Location: 0.1 MI W OF US 81 (Lat: 34.502897,  Lng: -97.969322),  Route carried "on" structure: City street E1733,  Year Built: 1954,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 3,026 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,842 (year 2040),  Design Load: HS 20,  Features Intersected: COW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.73m (12.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13181,  Location: 0.1 MI W OF US 81 (Lat: 34.510739,  Lng: -97.967728),  Route carried "on" structure: City street E1727,  Year Built: 1954,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,878 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,005 (year 2040),  Design Load: HS 20,  Features Intersected: COW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 13182,  Location: BETW 3RD & 5 ST81 (Lat: 34.503286,  Lng: -97.951083),  Route carried "on" structure: City street E1733,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 240 (year 2040),  Design Load: H 20,  Features Intersected: WILLOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.58m (11.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $183,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $290,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13313,  Location: 1.2 MI S JCT SH 7 (Lat: 34.575458,  Lng: -97.966653),  Route carried "on" structure: US 81,  Year Built: 1955,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 14,400 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 23,040 (year 2040),  Design Load: HS 20,  Features Intersected: STAGE STAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.188,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1405,  Location: 0.1 MI W OF US 81 (Lat: 34.494383,  Lng: -97.969933),  Route carried "on" structure: City street E1739,  Year Built: 1958,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 800 (year 2040),  Design Load: HS 20,  Features Intersected: CLARIDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 14051,  Location: 0.1 MI W OF US 81 (Lat: 34.504950,  Lng: -97.967906),  Route carried "on" structure: City street E1731,  Year Built: 1958,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 3,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,800 (year 2040),  Design Load: HS 20,  Features Intersected: COW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 14658,  Location: 8.4E 2.S US81 SH 7 (Lat: 34.463542,  Lng: -97.817550),  Route carried "on" structure: County highway E1760,  Year Built: 1960,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: H 10,  Features Intersected: EAST MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 23.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $241,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1482,  Location: BETW 4TH & 5 ST (Lat: 34.499286,  Lng: -97.952064),  Route carried "on" structure: City street E1736,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 480 (year 2040),  Design Load: HS 20,  Features Intersected: WILLOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.73m (12.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $191,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $303,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14821,  Location: BETW 5 ST & 3RD (Lat: 34.502303,  Lng: -97.951189),  Route carried "on" structure: City street E1734,  Year Built: 1960,  Year Reconstructed: 1995,  Status: Closed,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 240 (year 2040),  Design Load: H 20,  Features Intersected: WILLOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $276,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 16867,  Location: 3.2 MI E JCT US 81 (Lat: 34.481742,  Lng: -97.919531),  Route carried "on" structure: State highway 7,  Year Built: 1967,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4,500 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 7,200 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.148,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $444,000,  Total Project Cost: $754,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 16917,  Location: 7.2 MI E JCT US 81 (Lat: 34.448744,  Lng: -97.860658),  Route carried "on" structure: State highway 7,  Year Built: 1967,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 4,100 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 6,560 (year 2040),  Design Load: HS 20,  Features Intersected: WEST MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.586,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 26 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $532,000,  Roadway Improvement Cost: $877,000,  Total Project Cost: $1,488,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 16932,  Location: 3.1 MI E JCT US 81 (Lat: 34.483333,  Lng: -97.921253),  Route carried "on" structure: State highway 7,  Year Built: 1967,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 4,500 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 7,200 (year 2040),  Design Load: HS 20,  Features Intersected: COW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.987,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $577,000,  Roadway Improvement Cost: $953,000,  Total Project Cost: $1,616,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 17374,  Location: 0.8 MI W OF JCT US 81 (Lat: 34.507000,  Lng: -97.979978),  Route carried "on" structure: City street 4700,  Year Built: 1969,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,461 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,538 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 21.5m (70.5ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17424,  Location: 0.2 MI E OF JCT US 81 (Lat: 34.521581,  Lng: -97.964067),  Route carried "on" structure: City street 4720,  Year Built: 1969,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 2,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,000 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.73m (12.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17734,  Location: BETWEEN 3RD & 4TH ST (Lat: 34.506994,  Lng: -97.949689),  Route carried "on" structure: City street 4702,  Year Built: 1970,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,000 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 18387,  Location: 1.1 MI E JCT US 81 (Lat: 34.491756,  Lng: -97.949897),  Route carried "on" structure: State highway 7,  Year Built: 1973,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 6,000 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,600 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 18388,  Location: 2.0 MI E OF US 81 (Lat: 34.491811,  Lng: -97.933931),  Route carried "on" structure: State highway 7,  Year Built: 1973,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.249,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 50.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $407,000,  Total Project Cost: $691,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 18442,  Location: 0.9 MI E US 81 DUNCAN (Lat: 34.491581,  Lng: -97.954056),  Route carried "on" structure: State highway 7,  Year Built: 1973,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 9,100 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,560 (year 2040),  Design Load: HS 20,  Features Intersected: WILLOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 83.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $656,000,  Roadway Improvement Cost: $1,082,000,  Total Project Cost: $1,836,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 18494,  Location: US81 & SH7 JCT (Lat: 34.490892,  Lng: -97.968992),  Route carried "on" structure: State highway 7,  Year Built: 1973,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 5,050 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,080 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 81 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.67m (18.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,382,000,  Roadway Improvement Cost: $2,280,000,  Total Project Cost: $3,869,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 18581,  Location: .7 MI E OF US 81 (Lat: 34.492317,  Lng: -97.956383),  Route carried "on" structure: State highway 7,  Year Built: 1973,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 4,150 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,640 (year 2040),  Design Load: HS 20,  Features Intersected: U.P. R.R. & 7 ST. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 64.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.58m (28.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,101,000,  Roadway Improvement Cost: $1,816,000,  Total Project Cost: $3,082,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 18582,  Location: .7 MI E OF US 81 (Lat: 34.492075,  Lng: -97.956408),  Route carried "on" structure: State highway 7,  Year Built: 1973,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 4,750 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,600 (year 2040),  Design Load: HS 20,  Features Intersected: U.P. R.R. & 7 ST. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 64.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.58m (28.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,101,000,  Roadway Improvement Cost: $1,816,000,  Total Project Cost: $3,082,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 194,  Location: 0.1 MI W US 81 (Lat: 34.492511,  Lng: -97.969858),  Route carried "on" structure: City street 4680,  Year Built: 1978,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 4,608 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,373 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.394,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 19411,  Location: N2960E1640004 (Lat: 34.631169,  Lng: -97.721275),  Route carried "on" structure: County highway 6966C,  Year Built: 1978,  Status: Posted for load,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 291 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 466 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.602,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.88m (12.73ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $198,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $315,000 ( Estimate for 2015),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous