Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Dunmore, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 97Number of bridges
  • 1,299ft / 396mTotal length
  • $8,961,000Total costs
  • 996,261Total average daily traffic
  • 175,809Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Dunmore
  • No street view available for this location

New bridges in Dunmore, PA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11930-1939
  • 11950-1959
  • 11960-1969
  • 171970-1979
  • 11980-1989
  • 721990-1999
  • 32010-2019
Reconstructed bridges in Dunmore, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 11990-1999
  • 32000-2009
Average Bridge Daily Traffic in Dunmore, PA
Average Bridge Truck Traffic in Dunmore, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.9%Very good
  • 55.6%Good
  • 11.1%Satisfactory
  • 8.3%Fair
  • 8.3%Poor
  • 2.8%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 50.0%Good
  • 13.9%Satisfactory
  • 11.1%Fair
  • 5.6%Poor
  • 2.8%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 66.7%Good
  • 11.1%Satisfactory
  • 13.9%Fair
  • 8.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Very good
  • 28.6%Good
  • 21.4%Satisfactory
  • 28.6%Fair
  • 14.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 80.0%Good
  • 20.0%Satisfactory
Find on map >>   Show street view

Structure Number: 52844,  Location: RORNG BR TP 1.9M N SR2010 (Lat: 41.373414,  Lng: -75.608686),  Route carried "on" structure: State highway 307,  Year Built: 2015,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 5,813 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,957 (year 2032),  Design Load: HL 93,  Features Intersected: STAFFORD MEADOW BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.801,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 26.9m (88.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 57558,  Location: 600 FT NW OF TIGUE STREET (Lat: 41.415761,  Lng: -75.599900),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 800 (year 2040),  Features Intersected: LITTLE ROARING BROOK,  Facility Carried by Structure: DUNHAM DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Channel: Good,  Culverts: Good,  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 57559,  Location: 860 FT FROM E. DRINKER ST (Lat: 41.415864,  Lng: -75.608300),  Route carried "on" structure: City street ,  Year Built: 1979,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 10 (year 2020),  Average Future Daily Traffic: 10 (year 2040),  Features Intersected: LITTLE ROARING BROOK,  Facility Carried by Structure: BRANCH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 20454,  Location: DUNMORE REEVE ST OVR I-81 (Lat: 41.427206,  Lng: -75.614486),  Route carried "under" structure: Ramp State highway ,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 1,861 (year 2021),  Truck Traffic: 8%,  Features Intersected: I-81 NB&SB, I-84, RAMPS,  Facility Carried by Structure: SR 2103 REEVES ST
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 20454,  Location: DUNMORE REEVE ST OVR I-81 (Lat: 41.427206,  Lng: -75.614486),  Route carried "under" structure: Interstate 81,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 28,029 (year 2022),  Truck Traffic: 15%,  Features Intersected: I-81 NB&SB, I-84, RAMPS,  Facility Carried by Structure: SR 2103 REEVES ST
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 14.066,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 20454,  Location: DUNMORE REEVE ST OVR I-81 (Lat: 41.427206,  Lng: -75.614486),  Route carried "under" structure: Interstate 81,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 26,651 (year 2022),  Truck Traffic: 15%,  Features Intersected: I-81 NB&SB, I-84, RAMPS,  Facility Carried by Structure: SR 2103 REEVES ST
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 13.935,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 20454,  Location: DUNMORE REEVE ST OVR I-81 (Lat: 41.427206,  Lng: -75.614486),  Route carried "under" structure: Interstate 84,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 24,599 (year 2022),  Truck Traffic: 18%,  Features Intersected: I-81 NB&SB, I-84, RAMPS,  Facility Carried by Structure: SR 2103 REEVES ST
Minimum Vertical Clearance: 6.50m (21.33ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 20454,  Location: DUNMORE REEVE ST OVR I-81 (Lat: 41.427206,  Lng: -75.614486),  Route carried "under" structure: Ramp State highway ,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 3,478 (year 2021),  Truck Traffic: 25%,  Features Intersected: I-81 NB&SB, I-84, RAMPS,  Facility Carried by Structure: SR 2103 REEVES ST
Minimum Vertical Clearance: 6.65m (21.82ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 20494,  Location: DUNMORE BORO OVR TIGUE ST (Lat: 41.415450,  Lng: -75.601494),  Route carried "under" structure: City street ,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 1992),  Features Intersected: TIGUE STREET,  Facility Carried by Structure: SR 0084 I-84 EB
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 20496,  Location: DUNMORE BORO OVR TIGUE ST (Lat: 41.414169,  Lng: -75.600608),  Route carried "under" structure: City street ,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 1992),  Features Intersected: TIGUE STREET,  Facility Carried by Structure: SR 0084 I-84 WB
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 20499,  Location: DUNMORE BORO OVER TR 435 (Lat: 41.400697,  Lng: -75.585547),  Route carried "under" structure: State highway 435,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 5,970 (year 2021),  Truck Traffic: 6%,  Features Intersected: TR 435 SB,  Facility Carried by Structure: SR 0084 I-84 WB
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 22.384,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 20505,  Location: ROARNG BR TP OVER I-380 N (Lat: 41.372750,  Lng: -75.573989),  Route carried "under" structure: Interstate 380,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 14,230 (year 2022),  Truck Traffic: 23%,  Features Intersected: SR 0380 I-380 NB,  Facility Carried by Structure: SR 0084 I-84 EB
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 16.026,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 20506,  Location: ROARNG BRK TP .2M W TR435 (Lat: 41.386003,  Lng: -75.553233),  Route carried "under" structure: Other road ,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 1993),  Features Intersected: LACKA COUNTY RAIL AUTH,  Facility Carried by Structure: SR 0084 I-84 EB
Minimum Vertical Clearance: 8.38m (27.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: 20507,  Location: ROARNG BRK TP .2M W TR435 (Lat: 41.386192,  Lng: -75.553550),  Route carried "under" structure: Other road ,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2004),  Truck Traffic: 10%,  Features Intersected: LACKA COUNTY RAIL AUTH,  Facility Carried by Structure: SR 0084 I-84 WB
Minimum Vertical Clearance: 8.51m (27.92ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: 20613,  Location: ROARING BR TWP OVER I-84 (Lat: 41.387467,  Lng: -75.551083),  Route carried "under" structure: Interstate 84,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 7,962 (year 2021),  Truck Traffic: 40%,  Features Intersected: SR 0084 I-84 EB & WB,  Facility Carried by Structure: SR 0435 TR435;SIGN
Minimum Vertical Clearance: 5.55m (18.21ft),  Kilometerpoint: 9.883,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 20613,  Location: ROARING BR TWP OVER I-84 (Lat: 41.387467,  Lng: -75.551083),  Route carried "under" structure: Interstate 84,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 8,658 (year 2021),  Truck Traffic: 35%,  Features Intersected: SR 0084 I-84 EB & WB,  Facility Carried by Structure: SR 0435 TR435;SIGN
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 8.882,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 20738,  Location: DUNMORE BORO OVER I-81 (Lat: 41.417747,  Lng: -75.611806),  Route carried "under" structure: Interstate 81,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 10,326 (year 2022),  Truck Traffic: 17%,  Features Intersected: SR 0081 I-81 NB & SB,  Facility Carried by Structure: SR 2020 DRINKER ST
Minimum Vertical Clearance: 8.26m (27.10ft),  Kilometerpoint: 13.145,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 20738,  Location: DUNMORE BORO OVER I-81 (Lat: 41.417747,  Lng: -75.611806),  Route carried "under" structure: Interstate 81,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 10,263 (year 2022),  Truck Traffic: 19%,  Features Intersected: SR 0081 I-81 NB & SB,  Facility Carried by Structure: SR 2020 DRINKER ST
Minimum Vertical Clearance: 6.55m (21.49ft),  Kilometerpoint: 13.296,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 20738,  Location: DUNMORE BORO OVER I-81 (Lat: 41.417747,  Lng: -75.611806),  Route carried "under" structure: Ramp State highway ,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 15,478 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR 0081 I-81 NB & SB,  Facility Carried by Structure: SR 2020 DRINKER ST
Minimum Vertical Clearance: 6.61m (21.69ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 20738,  Location: DUNMORE BORO OVER I-81 (Lat: 41.417747,  Lng: -75.611806),  Route carried "under" structure: Ramp State highway ,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 20,030 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR 0081 I-81 NB & SB,  Facility Carried by Structure: SR 2020 DRINKER ST
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 20965,  Location: ROARNG BR TP OVR I-84&380 (Lat: 41.372450,  Lng: -75.574286),  Route carried "under" structure: Interstate 380,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 14,230 (year 2022),  Truck Traffic: 23%,  Features Intersected: I-84 EB & I-380 NB
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 16.026,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 20965,  Location: ROARNG BR TP OVR I-84&380 (Lat: 41.372450,  Lng: -75.574286),  Route carried "under" structure: Interstate 84,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 7,962 (year 2021),  Truck Traffic: 40%,  Features Intersected: I-84 EB & I-380 NB,  Facility Carried by Structure: SR 8008 TO I-380 S
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 6.677,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 39621,  Location: DUNMORE BORO 1.5M N TR307 (Lat: 41.407903,  Lng: -75.626883),  Route carried "under" structure: City street ,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 1992),  Truck Traffic: 1%,  Features Intersected: RR & ROARING BK &MILL ST,  Facility Carried by Structure: SR 0081 I-81 NB
Minimum Vertical Clearance: 11.00m (36.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.5m (146.0ft)

Find on map >>   Show street view

Structure Number: 39621,  Location: DUNMORE BORO 1.5M N TR307 (Lat: 41.407903,  Lng: -75.626883),  Route carried "under" structure: City street ,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2003),  Truck Traffic: 1%,  Features Intersected: RR & ROARING BK &MILL ST,  Facility Carried by Structure: SR 0081 I-81 NB
Minimum Vertical Clearance: 8.60m (28.22ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.5m (146.0ft)

Find on map >>   Show street view

Structure Number: 39622,  Location: DUNMORE BORO 1.5M N TR307 (Lat: 41.407694,  Lng: -75.628000),  Route carried "under" structure: City street ,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 1992),  Truck Traffic: 1%,  Features Intersected: RR & ROARING BK &MILL ST,  Facility Carried by Structure: SR 0081 I-81 SB
Minimum Vertical Clearance: 11.28m (37.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.5m (146.0ft)

Find on map >>   Show street view

Structure Number: 39657,  Location: DUNMORE BORO OVER I-81 (Lat: 41.430669,  Lng: -75.622594),  Route carried "under" structure: Ramp State highway ,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 4,807 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR 0081 NB & SB, RAMPS,  Facility Carried by Structure: SR 0347 TR 347
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 39657,  Location: DUNMORE BORO OVER I-81 (Lat: 41.430669,  Lng: -75.622594),  Route carried "under" structure: Interstate 81,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 28,029 (year 2022),  Truck Traffic: 15%,  Features Intersected: SR 0081 NB & SB, RAMPS,  Facility Carried by Structure: SR 0347 TR 347
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 14.867,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 39657,  Location: DUNMORE BORO OVER I-81 (Lat: 41.430669,  Lng: -75.622594),  Route carried "under" structure: Interstate 81,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 26,651 (year 2022),  Truck Traffic: 15%,  Features Intersected: SR 0081 NB & SB, RAMPS,  Facility Carried by Structure: SR 0347 TR 347
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 14.787,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 39657,  Location: DUNMORE BORO OVER I-81 (Lat: 41.430669,  Lng: -75.622594),  Route carried "under" structure: Ramp State highway ,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 4,380 (year 2021),  Truck Traffic: 25%,  Features Intersected: SR 0081 NB & SB, RAMPS,  Facility Carried by Structure: SR 0347 TR 347
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 39966,  Location: DUNMORE BORO OVR TIGUE ST (Lat: 41.414444,  Lng: -76.600000),  Route carried "under" structure: City street ,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2003),  Truck Traffic: 10%,  Features Intersected: TIGUE STREET,  Facility Carried by Structure: SR 8024 RAMP
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 40025,  Location: DUNMORE BORO OVER EXIT 1 (Lat: 41.413889,  Lng: -76.600000),  Route carried "under" structure: Ramp State highway ,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 594 (year 2021),  Truck Traffic: 25%,  Features Intersected: SR0084 EXIT 1 RAMP,  Facility Carried by Structure: SR8024 RAMP TO I84
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 4052,  Location: ROARING BK TP .2 M E I-81 (Lat: 41.421028,  Lng: -75.600781),  Route carried "under" structure: Ramp State highway ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 2,208 (year 2021),  Truck Traffic: 8%,  Features Intersected: RAMP LSE TO I-84 EB, RR,  Facility Carried by Structure: TR6 RAMP EB
Minimum Vertical Clearance: 6.27m (20.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 61.3m (201.1ft)

Find on map >>   Show street view

Structure Number: 40521,  Location: DUNMORE BORO OVER SR 8024 (Lat: 41.420758,  Lng: -75.604803),  Route carried "under" structure: Ramp State highway ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 2,752 (year 2021),  Truck Traffic: 8%,  Features Intersected: RAMPS ELN, LN-1 TO TR 6,  Facility Carried by Structure: SR 0084 I-84 WB
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.9m (167.0ft)

Find on map >>   Show street view

Structure Number: 40521,  Location: DUNMORE BORO OVER SR 8024 (Lat: 41.420758,  Lng: -75.604803),  Route carried "under" structure: Ramp State highway ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 6,034 (year 2021),  Truck Traffic: 8%,  Features Intersected: RAMPS ELN, LN-1 TO TR 6,  Facility Carried by Structure: SR 0084 I-84 WB
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.9m (167.0ft)

Find on map >>   Show street view

Structure Number: 40522,  Location: DUNMORE BO OVER SR 8024 (Lat: 41.419253,  Lng: -75.603600),  Route carried "under" structure: Ramp State highway ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 2,208 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR 8024 & RAILROAD,  Facility Carried by Structure: SR 0084 I-84 WB
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 40523,  Location: DUNMORE BORO OVER SR 8024 (Lat: 41.419964,  Lng: -75.606089),  Route carried "under" structure: Ramp State highway ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 6,034 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR 8024 FROM 81N TO 6E,  Facility Carried by Structure: SR 0084 I-84 EB
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.5m (191.9ft)

Find on map >>   Show street view

Structure Number: 40524,  Location: DUNMORE BO OVR DNM DR&I84 (Lat: 41.422397,  Lng: -75.606853),  Route carried "under" structure: City street ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2003),  Truck Traffic: 1%,  Features Intersected: DUNHAM DRIVE & I-84 RAMP,  Facility Carried by Structure: SR 8024 - RAMP
Minimum Vertical Clearance: 7.64m (25.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 40524,  Location: DUNMORE BO OVR DNM DR&I84 (Lat: 41.422397,  Lng: -75.606853),  Route carried "under" structure: Interstate 84,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 26,263 (year 2022),  Truck Traffic: 21%,  Features Intersected: DUNHAM DRIVE & I-84 RAMP,  Facility Carried by Structure: SR 8024 - RAMP
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 40525,  Location: DUNMORE BO RMP TO I-81 SB (Lat: 41.420581,  Lng: -75.609819),  Route carried "under" structure: Interstate 81,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 10,263 (year 2022),  Truck Traffic: 19%,  Features Intersected: I-81, I-84 EB, RMP TO 81,  Facility Carried by Structure: SR 8024 - RAMP
Minimum Vertical Clearance: 14.75m (48.39ft),  Kilometerpoint: 13.296,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 73.2m (240.2ft)

Find on map >>   Show street view

Structure Number: 40525,  Location: DUNMORE BO RMP TO I-81 SB (Lat: 41.420581,  Lng: -75.609819),  Route carried "under" structure: Interstate 84,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 24,599 (year 2022),  Truck Traffic: 18%,  Features Intersected: I-81, I-84 EB, RMP TO 81,  Facility Carried by Structure: SR 8024 - RAMP
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 73.2m (240.2ft)

Find on map >>   Show street view

Structure Number: 40525,  Location: DUNMORE BO RMP TO I-81 SB (Lat: 41.420581,  Lng: -75.609819),  Route carried "under" structure: State highway ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 3,337 (year 2021),  Truck Traffic: 8%,  Features Intersected: I-81, I-84 EB, RMP TO 81,  Facility Carried by Structure: SR 8024 - RAMP
Minimum Vertical Clearance: 13.31m (43.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 73.2m (240.2ft)

Find on map >>   Show street view

Structure Number: 40525,  Location: DUNMORE BO RMP TO I-81 SB (Lat: 41.420581,  Lng: -75.609819),  Route carried "under" structure: Interstate 81,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 10,326 (year 2022),  Truck Traffic: 17%,  Features Intersected: I-81, I-84 EB, RMP TO 81,  Facility Carried by Structure: SR 8024 - RAMP
Minimum Vertical Clearance: 14.45m (47.41ft),  Kilometerpoint: 13.145,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 73.2m (240.2ft)

Find on map >>   Show street view

Structure Number: 40526,  Location: DUNMORE BORO OVER SR 8024 (Lat: 41.419469,  Lng: -75.603264),  Route carried "under" structure: Ramp State highway ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 6,034 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR 8024 SEGS 250 & 500,  Facility Carried by Structure: SR 2101 DUNHAM DR
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 40526,  Location: DUNMORE BORO OVER SR 8024 (Lat: 41.419469,  Lng: -75.603264),  Route carried "under" structure: Ramp State highway ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 2,752 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR 8024 SEGS 250 & 500,  Facility Carried by Structure: SR 2101 DUNHAM DR
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 40527,  Location: ROARING BR TP .2 M E I-81 (Lat: 41.421308,  Lng: -75.600233),  Route carried "under" structure: Ramp State highway ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 2,208 (year 2021),  Truck Traffic: 8%,  Features Intersected: RAMP LSE & RAILROAD,  Facility Carried by Structure: TR 6 WB CASEY HWY
Minimum Vertical Clearance: 5.99m (19.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 52.7m (172.9ft)

Find on map >>   Show street view

Structure Number: 40528,  Location: DUNMORE BORO OVER SR 8024 (Lat: 41.419953,  Lng: -75.606072),  Route carried "under" structure: Ramp State highway ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 1,516 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR 8024 RAMP & RR,  Facility Carried by Structure: SR 0084 I-84
Minimum Vertical Clearance: 7.09m (23.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 40529,  Location: DUNMORE OVER SR 8024 RAMP (Lat: 41.418922,  Lng: -75.602689),  Route carried "under" structure: Ramp State highway ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 1,978 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR 8024 RAMP,  Facility Carried by Structure: SR 2102 DUNHAM DR
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 4053,  Location: DUNMORE BORO OVER SR 8024 (Lat: 41.420161,  Lng: -75.603950),  Route carried "under" structure: US 6,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 11,532 (year 2021),  Truck Traffic: 12%,  Features Intersected: SR 8024 (RAMP) & RR,  Facility Carried by Structure: SR 2100 DUNHAM DR
Minimum Vertical Clearance: 6.30m (20.67ft),  Kilometerpoint: 13.061,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 4053,  Location: DUNMORE BORO OVER SR 8024 (Lat: 41.420161,  Lng: -75.603950),  Route carried "under" structure: Ramp State highway ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 2,208 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR 8024 (RAMP) & RR,  Facility Carried by Structure: SR 2100 DUNHAM DR
Minimum Vertical Clearance: 6.32m (20.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 40531,  Location: DUNMORE BO OVER DUNHAM DR (Lat: 41.424444,  Lng: -75.608333),  Route carried "under" structure: City street ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2003),  Truck Traffic: 1%,  Features Intersected: DUNHAM DRIVE,  Facility Carried by Structure: SR 8024 - RAMP
Minimum Vertical Clearance: 8.44m (27.69ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.5m (136.2ft)

Find on map >>   Show street view

Structure Number: 40532,  Location: DUNMORE BORO .1 M N I-81 (Lat: 41.425217,  Lng: -75.610144),  Route carried "under" structure: Ramp State highway ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 3,066 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR 8024 - TUNNEL,  Facility Carried by Structure: RAMPS W, WB, CB/LS
Minimum Vertical Clearance: 5.32m (17.45ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 40534,  Location: DUNMORE BORO OVER I-84&81 (Lat: 41.420942,  Lng: -75.609817),  Route carried "under" structure: Interstate 81,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 10,326 (year 2022),  Truck Traffic: 17%,  Features Intersected: I-81, I-84, RAMPS,  Facility Carried by Structure: SR 8024 - RAMP
Minimum Vertical Clearance: 14.94m (49.02ft),  Kilometerpoint: 13.145,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 76.8m (252.0ft)

Find on map >>   Show street view

Structure Number: 40534,  Location: DUNMORE BORO OVER I-84&81 (Lat: 41.420942,  Lng: -75.609817),  Route carried "under" structure: Interstate 84,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 24,599 (year 2022),  Truck Traffic: 18%,  Features Intersected: I-81, I-84, RAMPS,  Facility Carried by Structure: SR 8024 - RAMP
Minimum Vertical Clearance: 8.38m (27.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 76.8m (252.0ft)

Find on map >>   Show street view

Structure Number: 40534,  Location: DUNMORE BORO OVER I-84&81 (Lat: 41.420942,  Lng: -75.609817),  Route carried "under" structure: Ramp State highway ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 3,337 (year 2021),  Truck Traffic: 8%,  Features Intersected: I-81, I-84, RAMPS,  Facility Carried by Structure: SR 8024 - RAMP
Minimum Vertical Clearance: 13.72m (45.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 76.8m (252.0ft)

Find on map >>   Show street view

Structure Number: 40534,  Location: DUNMORE BORO OVER I-84&81 (Lat: 41.420942,  Lng: -75.609817),  Route carried "under" structure: Ramp State highway ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 3,066 (year 2021),  Truck Traffic: 8%,  Features Intersected: I-81, I-84, RAMPS,  Facility Carried by Structure: SR 8024 - RAMP
Minimum Vertical Clearance: 14.94m (49.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 76.8m (252.0ft)

Find on map >>   Show street view

Structure Number: 40534,  Location: DUNMORE BORO OVER I-84&81 (Lat: 41.420942,  Lng: -75.609817),  Route carried "under" structure: Interstate 81,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 10,263 (year 2022),  Truck Traffic: 19%,  Features Intersected: I-81, I-84, RAMPS,  Facility Carried by Structure: SR 8024 - RAMP
Minimum Vertical Clearance: 14.94m (49.02ft),  Kilometerpoint: 13.296,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 76.8m (252.0ft)

Find on map >>   Show street view

Structure Number: 40535,  Location: DUNMORE BORO OVER I-81 (Lat: 41.422111,  Lng: -75.609014),  Route carried "under" structure: Interstate 81,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 10,326 (year 2022),  Truck Traffic: 17%,  Features Intersected: SR 0081 I-81 NB & SB,  Facility Carried by Structure: SR 0084 I-84 EB
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 13.145,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 40535,  Location: DUNMORE BORO OVER I-81 (Lat: 41.422111,  Lng: -75.609014),  Route carried "under" structure: Interstate 81,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 10,263 (year 2022),  Truck Traffic: 19%,  Features Intersected: SR 0081 I-81 NB & SB,  Facility Carried by Structure: SR 0084 I-84 EB
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 13.296,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 48979,  Location: ROARING BRK TP OVR TR 348 (Lat: 41.390886,  Lng: -75.552581),  Route carried "under" structure: State highway 348,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 7,047 (year 2021),  Truck Traffic: 5%,  Features Intersected: SR 0348 TR 348,  Facility Carried by Structure: SR 0435 TR 435
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 15.5m (50.9ft)

Discuss Dunmore, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.