Bridge Statistics for East Fishkill, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 56Number of bridges
  • 472ft / 144mTotal length
  • $125,568,000Total costs
  • 593,279Total average daily traffic
  • 34,237Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for East Fishkill
  • No street view available for this location

New bridges in East Fishkill, NY - historical statistics
  • New bridges - historical statistics
  • 101930-1939
  • 21940-1949
  • 261960-1969
  • 51980-1989
  • 31990-1999
  • 62000-2009
  • 22010-2019
  • 22020-2022
Reconstructed bridges in East Fishkill, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41980-1989
  • 21990-1999
  • 42000-2009
  • 22010-2019
Average Bridge Daily Traffic in East Fishkill, NY
Average Bridge Truck Traffic in East Fishkill, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.3%Excellent
  • 13.3%Very good
  • 23.3%Good
  • 33.3%Satisfactory
  • 20.0%Fair
  • 6.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.1%Excellent
  • 18.2%Very good
  • 27.3%Good
  • 27.3%Satisfactory
  • 21.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.1%Excellent
  • 6.1%Very good
  • 24.2%Good
  • 36.4%Satisfactory
  • 21.2%Fair
  • 6.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.6%Good
  • 50.0%Satisfactory
  • 44.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Very good
  • 80.0%Satisfactory
Find on map >>   Show street view

Structure Number: 102685,  Location: 1.5 MI E JCT RTS 52+82 (Lat: 41.538581,  Lng: -73.843267),  Route carried "on" structure: State highway 52,  Year Built: 1935,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 9,190 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,233 (year 2040),  Design Load: H 20,  Features Intersected: WICOPEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.224,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: June 2019,  Bridge Improvement Cost: $533,000,  Roadway Improvement Cost: $312,000,  Total Project Cost: $845,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102686,  Location: .1 MI E JCT SH 52 & SH376 (Lat: 41.553675,  Lng: -73.793853),  Route carried "on" structure: State highway 52,  Year Built: 1935,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 11,373 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,426 (year 2040),  Design Load: H 20,  Features Intersected: GAYHEAD POND INLT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.034,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $580,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1026879,  Location: JCT TSP & RTE 52 (Lat: 41.557853,  Lng: -73.780528),  Route carried "on" structure: State highway 987G,  Year Built: 1937,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 30,092 (year 2020),  Average Future Daily Traffic: 42,450 (year 2040),  Design Load: H 20,  Features Intersected: RTE 52
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.015,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,576,000,  Roadway Improvement Cost: $923,000,  Total Project Cost: $2,499,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 10323,  Location: .3 MI N JCT SH 82 & SH376 (Lat: 41.583397,  Lng: -73.804069),  Route carried "on" structure: State highway 82,  Year Built: 1936,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 14,256 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 17,318 (year 2040),  Design Load: H 20,  Features Intersected: Dutchess Rail Trail, MNR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.321,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.8m (110.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $2,119,000,  Roadway Improvement Cost: $1,241,000,  Total Project Cost: $3,359,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1032319,  Location: JCT TSP & RTE 82 (Lat: 41.625350,  Lng: -73.774297),  Route carried "on" structure: Other road 987G,  Year Built: 1938,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 16,584 (year 2020),  Average Future Daily Traffic: 23,395 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 82
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.559,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,770,000,  Roadway Improvement Cost: $1,036,000,  Total Project Cost: $2,806,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103253,  Location: 2.4 MI E JCT I84 & US 9 (Lat: 41.530514,  Lng: -73.845294),  Route carried "on" structure: Other road ,  Year Built: 1963,  Status: Open,  Structure Length: 9.63m (31.59ft),  Average Daily Traffic: 2,949 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,129 (year 2034),  Design Load: H 20,  Features Intersected: 84I84I 82021084-WB, RTE,  Facility Carried by Structure: FISHKILL HOOK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.63m (31.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,168,000,  Roadway Improvement Cost: $1,855,000,  Total Project Cost: $5,024,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1032541,  Location: 2.8 MI E JCT RTS I84+9 (Lat: 41.532125,  Lng: -73.839364),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 24,544 (year 1999),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: WICCOPEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.095,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $626,000,  Roadway Improvement Cost: $367,000,  Total Project Cost: $993,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1032542,  Location: 2.8 MI E JCT RTS I84+9 (Lat: 41.531778,  Lng: -73.839197),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 20,558 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 34,813 (year 2040),  Design Load: HS 20,  Features Intersected: WICCOPEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.063,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $624,000,  Roadway Improvement Cost: $366,000,  Total Project Cost: $990,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103255,  Location: 4.1 MI E JCT RTS I84+9 (Lat: 41.529781,  Lng: -73.812194),  Route carried "on" structure: Other road ,  Year Built: 1963,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 8.14m (26.71ft),  Truck Traffic: 10%,  Design Load: HS 20+Mod,  Features Intersected: 84I84I 82021101 WB, RTE,  Facility Carried by Structure: LIMEKILN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.384,  Lanes on structure: 5,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.13m (26.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $6,091,000,  Roadway Improvement Cost: $3,567,000,  Total Project Cost: $9,658,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103256,  Location: 5.0 MI E JCT RTS I84+9 (Lat: 41.532606,  Lng: -73.795017),  Route carried "on" structure: Other road ,  Year Built: 1963,  Status: Open,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 1,498 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,097 (year 2040),  Design Load: H 20,  Features Intersected: 84I 84I82021111 WB, RTE,  Facility Carried by Structure: SHENANDOAH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.510,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.5m (60.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.59m (28.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,333,000,  Roadway Improvement Cost: $1,952,000,  Total Project Cost: $5,285,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1032571,  Location: INT RTS I84(WB)& TSP (Lat: 41.539225,  Lng: -73.771878),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 10.58m (34.71ft),  Average Daily Traffic: 26,344 (year 2009),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: 987G 987G82031029 SB, R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.919,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.57m (34.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $5,383,000,  Roadway Improvement Cost: $3,152,000,  Total Project Cost: $8,535,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1032572,  Location: INT RTS I84(EB) & TSP (Lat: 41.538708,  Lng: -73.771794),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 10.91m (35.79ft),  Average Daily Traffic: 22,731 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 38,492 (year 2040),  Design Load: HS 20,  Features Intersected: 987G 987G82031029 SB, R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.887,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.91m (35.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $5,543,000,  Roadway Improvement Cost: $3,246,000,  Total Project Cost: $8,788,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 104697,  Location: 0.1 MI N JCT RTS 376+52 (Lat: 41.555150,  Lng: -73.795908),  Route carried "on" structure: State highway 376,  Year Built: 1935,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 9,722 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,029 (year 2040),  Design Load: H 20,  Features Intersected: GAYHEAD POND STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 28.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $879,000,  Roadway Improvement Cost: $515,000,  Total Project Cost: $1,393,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104698,  Location: 1.5 MI N JCT RTS 376+52 (Lat: 41.571619,  Lng: -73.806781),  Route carried "on" structure: State highway 376,  Year Built: 1947,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 9,722 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,029 (year 2040),  Design Load: HS 20,  Features Intersected: FISHKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.446,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,141,000,  Roadway Improvement Cost: $1,254,000,  Total Project Cost: $3,395,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104699,  Location: .3 MI N JCT SH 376 & SH82 (Lat: 41.584578,  Lng: -73.809181),  Route carried "on" structure: State highway 376,  Year Built: 2005,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 5,367 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,640 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WHORTLE KILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.087,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.4m (24.3ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $368,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1052351,  Location: .9 MI E JCT I84 & TSP (Lat: 41.543503,  Lng: -73.754528),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 26,344 (year 2009),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: HOSNER MOUNTAIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.496,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.2m (118.8ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.77m (12.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,226,000,  Roadway Improvement Cost: $1,304,000,  Total Project Cost: $3,530,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1052352,  Location: .9 MI E JCT I84 & TSP (Lat: 41.543278,  Lng: -73.754064),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 17,936 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 30,372 (year 2040),  Design Load: HS 20,  Features Intersected: HOSNER MTN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.448,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.23m (13.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,426,000,  Roadway Improvement Cost: $1,421,000,  Total Project Cost: $3,847,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1052361,  Location: 2.1 MILES E JCT I84 & TSP (Lat: 41.548386,  Lng: -73.732278),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 9.78m (32.09ft),  Average Daily Traffic: 26,344 (year 2009),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: RTE 52
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.427,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.78m (32.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $3,608,000,  Roadway Improvement Cost: $2,113,000,  Total Project Cost: $5,722,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1052362,  Location: 2.1 MILES E JCT I84 & TSP (Lat: 41.547958,  Lng: -73.732325),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 17,936 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 30,372 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 52
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.395,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.8m (97.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.14m (29.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $4,422,000,  Roadway Improvement Cost: $2,590,000,  Total Project Cost: $7,012,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 105237,  Location: 3.1 MI E JCT I84 & TSP (Lat: 41.543678,  Lng: -73.714606),  Route carried "on" structure: Other road ,  Year Built: 1968,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 8.41m (27.59ft),  Average Daily Traffic: 701 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 981 (year 2038),  Design Load: HS 20,  Features Intersected: 84I 84I82021157 - EB, RT,  Facility Carried by Structure: STORMVILLE MOUNTAI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.285,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.41m (27.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,700,000,  Roadway Improvement Cost: $1,581,000,  Total Project Cost: $4,281,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 105239,  Location: 5.4 MI E JCT I84+TSP (Lat: 41.520322,  Lng: -73.690731),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Open,  Structure Length: 9.17m (30.09ft),  Average Daily Traffic: 1,809 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,238 (year 2040),  Design Load: HS 20,  Features Intersected: 84I 84I82021177 NB, RTE,  Facility Carried by Structure: HOLMES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.17m (30.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,985,000,  Roadway Improvement Cost: $1,748,000,  Total Project Cost: $4,733,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 107846,  Location: 0.4 Mi NW JCT I-84 & TSP (Lat: 41.544775,  Lng: -73.774775),  Route carried "on" structure: Other road ,  Year Built: 2006,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 802 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,123 (year 2040),  Design Load: HL 93,  Features Intersected: RTE 987,  Facility Carried by Structure: HOSNER MOUNTAIN RO
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 1.496,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,025,000,  Roadway Improvement Cost: $1,186,000,  Total Project Cost: $3,210,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107847,  Location: 0.4 Mi NW of I84 & TSP (Lat: 41.544639,  Lng: -73.775258),  Route carried "on" structure: Other road 987,  Year Built: 2006,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 802 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,123 (year 2040),  Design Load: HL 93,  Features Intersected: 987G 987G82031036
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,978,000,  Roadway Improvement Cost: $1,158,000,  Total Project Cost: $3,136,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 109135,  Location: NW QUAD RAMPS I84+TSP INT (Lat: 41.540653,  Lng: -73.773425),  Route carried "on" structure: Ramp Interstate 84,  Year Built: 1962,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 3,580 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,062 (year 2040),  Design Load: HS 20,  Features Intersected: STERN STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $460,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 226278,  Location: 0.8 MI SE OF HOPEWELL JCT (Lat: 41.581814,  Lng: -73.794239),  Route carried "on" structure: Other road ,  Year Built: 1987,  Status: Posted for load,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 449 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 629 (year 2039),  Features Intersected: FISH KILL CREEK,  Facility Carried by Structure: CAROL DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.981,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $541,000,  Roadway Improvement Cost: $317,000,  Total Project Cost: $858,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226871,  Location: 1.1 MI S JCT I84 & HOOK (Lat: 41.525744,  Lng: -73.832103),  Route carried "on" structure: Other road ,  Year Built: 1980,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 740 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,036 (year 2040),  Features Intersected: WICCOPEE CREEK,  Facility Carried by Structure: WARREN FARM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $765,000,  Roadway Improvement Cost: $448,000,  Total Project Cost: $1,213,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 227187,  Location: 1 MI So 84 (Lat: 41.501633,  Lng: -73.835978),  Route carried "on" structure: ServiceOther road ,  Year Built: 2021,  Status: Temporarily open,  Structure Length: 1.95m (6.40ft),  Design Load: HS 20,  Features Intersected: Wiccopee Creek,  Facility Carried by Structure: EAST HOOK ROAD
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334308,  Location: 2.3 MI NE OF HOPEWELL JCT (Lat: 41.595786,  Lng: -73.762739),  Route carried "on" structure: County highway ,  Year Built: 2019,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 7,789 (year 2015),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,637 (year 2040),  Design Load: HS 20,  Features Intersected: SYLVAN LAKE OUTLT,  Facility Carried by Structure: BEEKMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.524,  Lanes on structure: 3,  Owner: County Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $377,000,  Roadway Improvement Cost: $221,000,  Total Project Cost: $597,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 334309,  Location: 1.2 MI NE OF HOPEWELL JCT (Lat: 41.588364,  Lng: -73.787544),  Route carried "on" structure: County highway ,  Year Built: 1940,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 1,181 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,653 (year 2035),  Design Load: HS 20,  Features Intersected: FISHKILL CREEK,  Facility Carried by Structure: CARPENTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.636,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.5m (80.4ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,634,000,  Roadway Improvement Cost: $957,000,  Total Project Cost: $2,591,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334311,  Location: 3.6 ME SE OF POUGHQUAG (Lat: 41.585783,  Lng: -73.745878),  Route carried "on" structure: Other road ,  Year Built: 2021,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 2,256 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,158 (year 2034),  Design Load: HL 93,  Features Intersected: FISHKILL CREEK,  Facility Carried by Structure: PHILIPS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.802,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $495,000,  Roadway Improvement Cost: $290,000,  Total Project Cost: $784,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334312,  Location: 1.1 MI SW OF HOPEWEL JCT (Lat: 41.570381,  Lng: -73.821667),  Route carried "on" structure: County highway ,  Year Built: 1963,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 6,493 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,033 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: FISHKILL CREEK,  Facility Carried by Structure: COUNTY ROAD 31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.041,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Channel: Fair,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,379,000,  Roadway Improvement Cost: $808,000,  Total Project Cost: $2,187,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 336744,  Location: 4.1MI N JCT T.S.PWY & 84I (Lat: 41.595414,  Lng: -73.764306),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 7,789 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,637 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 987G, 987G987G820310,  Facility Carried by Structure: CR 9BEEKMAN RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.395,  Lanes on structure: 3,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.1m (98.8ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 25.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.18m (20.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,831,000,  Roadway Improvement Cost: $1,658,000,  Total Project Cost: $4,489,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 337016,  Location: .5 MILE NW JCT I84 & TSP (Lat: 41.543133,  Lng: -73.778389),  Route carried "on" structure: Other road ,  Year Built: 2004,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 151 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 211 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SHENANDOAH CREEK,  Facility Carried by Structure: SOMERSET ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $577,000,  Roadway Improvement Cost: $338,000,  Total Project Cost: $915,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 370206,  Location: 2.0 MI SE OF HOPEWELL JCT (Lat: 41.568061,  Lng: -73.776511),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 934 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,308 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MNRR BE LINE,  Facility Carried by Structure: CARPENTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.595,  Lanes on structure: 2,  Owner: Railroad,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Segmental Box Girder,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Excellent,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $5,461,000,  Roadway Improvement Cost: $3,198,000,  Total Project Cost: $8,659,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 5502349,  Location: 1.7 MI SE OF HOPEWELL JCT (Lat: 41.570028,  Lng: -73.780478),  Route carried "on" structure: Other road 987G,  Year Built: 1937,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 30,092 (year 2020),  Average Future Daily Traffic: 42,450 (year 2040),  Design Load: HS 20,  Features Intersected: Maybrook Trailway, MNRR
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 8.415,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 19.0m (62.3ft),  Out-to-Out Width: 19.9m (65.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.22m (7.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,475,000,  Roadway Improvement Cost: $2,035,000,  Total Project Cost: $5,510,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5502359,  Location: 2.3 MI NE OF HOPEWEL JCT (Lat: 41.589106,  Lng: -73.765772),  Route carried "on" structure: Other road 987G,  Year Built: 1936,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 30,092 (year 2020),  Average Future Daily Traffic: 42,450 (year 2040),  Design Load: H 20,  Features Intersected: FISHKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.022,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,009,000,  Roadway Improvement Cost: $1,177,000,  Total Project Cost: $3,186,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 552353,  Location: 4MI N JCT TSP & 84I (Lat: 41.594197,  Lng: -73.762733),  Route carried "on" structure: Ramp Other road ,  Year Built: 1989,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 885 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,248 (year 2040),  Design Load: HS 20,  Features Intersected: SYLVAN LAKE OUTLET,  Facility Carried by Structure: RAMP FROM TACONIC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $385,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $611,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 552465,  Location: 1.8 MI SOUTH JCT I84 &TSP (Lat: 41.512444,  Lng: -73.787942),  Route carried "on" structure: Other road 987G,  Year Built: 1999,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 23,899 (year 2011),  Average Future Daily Traffic: 57,331 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MILLER HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 21.7m (71.2ft),  Out-to-Out Width: 24.0m (78.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,219,000,  Roadway Improvement Cost: $1,300,000,  Total Project Cost: $3,519,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1026879,  Location: JCT TSP & RTE 52 (Lat: 41.557853,  Lng: -73.780528),  Route carried "under" structure: US 52,  Year Built: 1937,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 1977),  Features Intersected: RTE 52,  Facility Carried by Structure: RTE 987G
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 20.386,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 1032319,  Location: JCT TSP & RTE 82 (Lat: 41.625350,  Lng: -73.774297),  Route carried "under" structure: State highway 82,  Year Built: 1938,  Structure Length: 0. m,  Average Daily Traffic: 5,996 (year 1999),  Features Intersected: RTE 82,  Facility Carried by Structure: RTE 987G
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 12.631,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 10.1m (33.1ft)