Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for East Providence, Rhode Island (RI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 54Number of bridges
  • 928ft / 283mTotal length
  • $312,717,000Total costs
  • 1,874,391Total average daily traffic
  • 198,027Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for East Providence
  • No street view available for this location

New bridges in East Providence, RI - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 21920-1929
  • 11930-1939
  • 11940-1949
  • 131950-1959
  • 71960-1969
  • 41970-1979
  • 31990-1999
  • 72000-2009
  • 142010-2019
Reconstructed bridges in East Providence, RI - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 31980-1989
  • 21990-1999
  • 42000-2009
Average Bridge Daily Traffic in East Providence, RI
Average Bridge Truck Traffic in East Providence, RI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.8%Very good
  • 52.9%Good
  • 29.4%Satisfactory
  • 8.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 19.4%Very good
  • 27.8%Good
  • 30.6%Satisfactory
  • 11.1%Fair
  • 5.6%Poor
  • 5.6%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 36.1%Good
  • 38.9%Satisfactory
  • 11.1%Fair
  • 2.8%Poor
  • 2.8%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Good
  • 75.0%Satisfactory
Find on map >>   Show street view

Structure Number: 946,  Location: 0.1 Mi N of Waterfrt Dr (Lat: 41.826300,  Lng: -71.378864),  Route carried "on" structure: Spur City street ,  Year Built: 1994,  Status: Posted for load,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 200 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 240 (year 2036),  Design Load: H 15,  Features Intersected: P&W RR R.O.W.,  Facility Carried by Structure: WATERMAN AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.056,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 30.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $1,339,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $2,009,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 994,  Location: 0.1 Mi N of No Broadway (Lat: 41.833664,  Lng: -71.360669),  Route carried "on" structure: City street ,  Year Built: 1946,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 10,151 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 12,182 (year 2036),  Design Load: HS 20,  Features Intersected: TEN MILE RIVER,  Facility Carried by Structure: ROGER WILLIAMS AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.945,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $241,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $362,000
Find on map >>   Show street view

Structure Number: 1092,  Location: 0.4 mi W of RI 103 (Lat: 41.758822,  Lng: -71.353742),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 1.23m (4.04ft),  Average Daily Traffic: 5,600 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 6,160 (year 2041),  Design Load: H 20,  Features Intersected: Bullock Cove,  Facility Carried by Structure: Crescent View Av
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.525,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.3m (43.6ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 2.0m (6.6ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 463,  Location: 1.4 Mi W of JCT RI 114 (Lat: 41.818608,  Lng: -71.381433),  Route carried "under" structure: Interstate 195,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 82,500 (year 2008),  Truck Traffic: 10%,  Features Intersected: I-195 EB & WB,  Facility Carried by Structure: TAUNTON AV RAMP
Minimum Vertical Clearance: 8.11m (26.61ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.6m (175.9ft)

Find on map >>   Show street view

Structure Number: 464,  Location: 400ft S.of Jct RI 403 (Lat: 41.817675,  Lng: -71.382333),  Route carried "under" structure: US 6,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 16,300 (year 2008),  Truck Traffic: 10%,  Features Intersected: US 6 WARREN AV,  Facility Carried by Structure: I-195 RAMP CR-3
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 465,  Location: 0.1 Mi E of SEEKONK RVR (Lat: 41.817567,  Lng: -71.382053),  Route carried "under" structure: US 6,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 18,950 (year 1992),  Truck Traffic: 10%,  Features Intersected: US 6 WARREN AV,  Facility Carried by Structure: I-195 RAMP DR-2
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 4665,  Location: 0.5 Mi W of JCT RI 114 (Lat: 41.818408,  Lng: -71.380972),  Route carried "under" structure: Interstate 195,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 16,300 (year 2008),  Truck Traffic: 10%,  Features Intersected: I-195 EB & WB,  Facility Carried by Structure: US 6 WRRN AV & RMP
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 467,  Location: 0.1 Mi S of JCT US 44 (Lat: 41.818139,  Lng: -71.380292),  Route carried "under" structure: Interstate 195,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 82,500 (year 2008),  Truck Traffic: 10%,  Features Intersected: I-195 EB & WB,  Facility Carried by Structure: POTTER ST
Minimum Vertical Clearance: 6.68m (21.92ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 468,  Location: 0.2 Mi S of JCT US 44 (Lat: 41.817392,  Lng: -71.378375),  Route carried "under" structure: Interstate 195,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 82,500 (year 2008),  Truck Traffic: 10%,  Features Intersected: I-195 EB & WB,  Facility Carried by Structure: PURCHASE ST
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 469,  Location: 0.9 Mi N of JCT Vet Mem P (Lat: 41.816244,  Lng: -71.375053),  Route carried "under" structure: Interstate 195,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 82,500 (year 2008),  Truck Traffic: 10%,  Features Intersected: I-195 EB & WB,  Facility Carried by Structure: LYON AV
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 4715,  Location: 0.7 Mi S of JCT US 44 (Lat: 41.812250,  Lng: -71.358450),  Route carried "under" structure: Interstate 195,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 115,300 (year 2001),  Features Intersected: I-195EB & WB,  Facility Carried by Structure: RI 114 PAWTUCKT AV
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.7m (71.2ft)

Find on map >>   Show street view

Structure Number: 4725,  Location: 0.7 Mi W of MASS LINE (Lat: 41.810800,  Lng: -71.351461),  Route carried "under" structure: Interstate 195,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 121,000 (year 2008),  Truck Traffic: 10%,  Features Intersected: I-195 EB & WB,  Facility Carried by Structure: RI 114 LANE F
Minimum Vertical Clearance: 7.32m (24.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 473,  Location: 0.1 Mi W of MASS LINE (Lat: 41.807881,  Lng: -71.341675),  Route carried "under" structure: US 6,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 86,400 (year 2021),  Truck Traffic: 14%,  Features Intersected: US 6 WARREN AV,  Facility Carried by Structure: I-195 EB & WB
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 4755,  Location: 1.1 Mi N of JCT RI 114 (Lat: 41.810000,  Lng: -71.353889),  Route carried "under" structure: Alternate US 6,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 18,700 (year 2015),  Truck Traffic: 3%,  Features Intersected: US 6 WARREN AV,  Facility Carried by Structure: I-195 LANE E
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.3m (148.6ft)

Find on map >>   Show street view

Structure Number: 477,  Location: 1.0 Mi S of JCT I-195 (Lat: 41.795406,  Lng: -71.351372),  Route carried "under" structure: State highway 114,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 10,100 (year 2021),  Truck Traffic: 7%,  Features Intersected: RI 114 EAST SHORE EXPWY,  Facility Carried by Structure: WAMPANOAG TRAIL
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.9m (52.2ft)

Find on map >>   Show street view

Structure Number: 597,  Location: 0.5 Mi W of JCT RI 114 (Lat: 41.825850,  Lng: -71.365183),  Route carried "under" structure: Ramp Interstate 195,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 76,000 (year 2008),  Truck Traffic: 10%,  Features Intersected: RAMP (SEEKONK RVR CRSS),  Facility Carried by Structure: NORTH BROADWAY
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 7,  Location: 0.2 Mi W of JCT US 6 (Lat: 41.819267,  Lng: -71.386550),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 80,500 (year 2021),  Truck Traffic: 19%,  Features Intersected: SEEKONK RIVER,  Facility Carried by Structure: I-195 WB
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.8m (130.6ft)

Find on map >>   Show street view

Structure Number: 7,  Location: 0.2 Mi W of JCT US 6 (Lat: 41.819267,  Lng: -71.386550),  Route carried "under" structure: Alternate City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 80,500 (year 2021),  Truck Traffic: 19%,  Features Intersected: SEEKONK RIVER,  Facility Carried by Structure: I-195 WB
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.8m (130.6ft)

Find on map >>   Show street view

Structure Number: 7,  Location: 0.2 Mi W of JCT US 6 (Lat: 41.819267,  Lng: -71.386550),  Route carried "under" structure: Alternate City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 80,500 (year 2021),  Truck Traffic: 19%,  Features Intersected: SEEKONK RIVER,  Facility Carried by Structure: I-195 WB
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.8m (130.6ft)

Find on map >>   Show street view

Structure Number: 7,  Location: 0.2 Mi W of JCT US 6 (Lat: 41.819267,  Lng: -71.386550),  Route carried "under" structure: Alternate City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 80,500 (year 2021),  Truck Traffic: 19%,  Features Intersected: SEEKONK RIVER,  Facility Carried by Structure: I-195 WB
Minimum Vertical Clearance: 4.33m (14.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.8m (130.6ft)

Discuss East Providence, Rhode Island (RI) on our hugely popular Rhode Island forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.