Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Everett, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 126Number of bridges
  • 5,469ft / 1,667mTotal length
  • $1,001,210,000Total costs
  • 4,805,444Total average daily traffic
  • 288,242Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Everett
  • No street view available for this location

New bridges in Everett, WA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 11940-1949
  • 101950-1959
  • 651960-1969
  • 81970-1979
  • 51980-1989
  • 121990-1999
  • 192000-2009
  • 32010-2019
Reconstructed bridges in Everett, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 31990-1999
  • 182000-2009
Average Bridge Daily Traffic in Everett, WA
Average Bridge Truck Traffic in Everett, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.3%Very good
  • 55.8%Good
  • 29.1%Satisfactory
  • 4.7%Fair
  • 1.2%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.1%Very good
  • 59.3%Good
  • 20.9%Satisfactory
  • 7.0%Fair
  • 4.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.0%Very good
  • 66.3%Good
  • 23.3%Satisfactory
  • 1.2%Fair
  • 2.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 53.6%Very good
  • 32.1%Good
  • 14.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 85593,  Location: 0.07 W JCT SHORE AVE (Lat: 47.951031,  Lng: -122.286289),  Route carried "on" structure: City street 420,  Year Built: 1946,  Status: Posted for load,  Structure Length: 10.85m (35.60ft),  Average Daily Traffic: 6,000 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,000 (year 2038),  Design Load: H 15,  Features Intersected: EDGEWATER CREEK,  Facility Carried by Structure: MUKILTEO BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 14.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 8.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 11.16m (36.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $5,563,000,  Roadway Improvement Cost: $1,113,000,  Total Project Cost: $11,126,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 85605,  Location: 0.1 W JCT GLENWOOD AVE (Lat: 47.956800,  Lng: -122.250200),  Route carried "on" structure: City street 420,  Year Built: 1979,  Status: Open,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 6,200 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,000 (year 2038),  Design Load: HS 20,  Features Intersected: GLENWOOD CREEK,  Facility Carried by Structure: MUKILTEO BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.058,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.24m (30.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,545,000,  Roadway Improvement Cost: $509,000,  Total Project Cost: $5,090,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85606,  Location: 0.15 W JCT HARBOR LANE (Lat: 47.957008,  Lng: -122.259456),  Route carried "on" structure: City street 42007,  Year Built: 1931,  Year Reconstructed: 1980,  Status: Posted for load,  Structure Length: 11.70m (38.39ft),  Average Daily Traffic: 6,123 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,000 (year 2036),  Design Load: HS 20,  Features Intersected: MERRILL & RING CREEK,  Facility Carried by Structure: MULIKLTEO BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 54.9m (180.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 12.01m (39.40ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $5,989,000,  Roadway Improvement Cost: $1,198,000,  Total Project Cost: $11,978,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85735,  Location: 0.1 N OF HEWITT AVE (Lat: 47.979908,  Lng: -122.203000),  Route carried "on" structure: City street 42017,  Year Built: 1989,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 400 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,000 (year 2042),  Design Load: HS 20,  Features Intersected: BURLINGTON NORTHERN RR,  Facility Carried by Structure: LOMBARD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.8m (61.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,322,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $2,645,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 85736,  Location: 0.1MI N. OF HEWITT (Lat: 47.979722,  Lng: -122.204444),  Route carried "on" structure: City street 42020,  Year Built: 1989,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 4,700 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,000 (year 2040),  Design Load: HS 20,  Features Intersected: BURLINGTON NORTHERN RR,  Facility Carried by Structure: OAKES AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 4.7m (15.4ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 22.8m (74.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,596,000,  Roadway Improvement Cost: $319,000,  Total Project Cost: $3,192,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 85737,  Location: 0.1 MI E OF BROADWAY (Lat: 47.979183,  Lng: -122.199581),  Route carried "on" structure: City street 420,  Year Built: 1989,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 9,600 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 15,650 (year 2040),  Design Load: HS 20,  Features Intersected: BURLINGTON NORTHERN RR,  Facility Carried by Structure: HEWITT AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.09m (16.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,372,000,  Roadway Improvement Cost: $474,000,  Total Project Cost: $4,743,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 86054,  Location: 2.5 N EVERETT AVE (Lat: 48.016389,  Lng: -122.207222),  Route carried "on" structure: State highway 529,  Year Built: 1993,  Status: Open,  Structure Length: 24.32m (79.79ft),  Average Daily Traffic: 5,673 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,214 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: BNRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.325,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 24.32m (79.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $5,426,000,  Roadway Improvement Cost: $1,085,000,  Total Project Cost: $10,853,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86055,  Location: 2.5 N EVERETT AVE (Lat: 48.016667,  Lng: -122.206667),  Route carried "on" structure: State highway 529,  Year Built: 1993,  Status: Open,  Structure Length: 25.82m (84.71ft),  Average Daily Traffic: 5,673 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,214 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: BNRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.325,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.0m,  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.82m (84.71ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $4,743,000,  Roadway Improvement Cost: $949,000,  Total Project Cost: $9,486,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86225,  Location: South of 56th (Lat: 47.946944,  Lng: -122.266389),  Route carried "on" structure: City street 420,  Year Built: 1993,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 300 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 500 (year 2038),  Design Load: HL 93,  Features Intersected: POWDER MILL GULCH,  Facility Carried by Structure: 25TH AVE WEST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,246,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 87269,  Location: Pacific Ave 0.25 Mi E I5 (Lat: 47.976708,  Lng: -122.199539),  Route carried "on" structure: City street 420,  Year Built: 2002,  Status: Open,  Structure Length: 22.86m (75.00ft),  Average Daily Traffic: 15,300 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 20,000 (year 2040),  Design Load: HL 93,  Features Intersected: BNSF RR, Smith Street,  Facility Carried by Structure: Pacific Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.16m (75.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $18,848,000,  Roadway Improvement Cost: $3,770,000,  Total Project Cost: $37,696,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8727,  Location: Inter Smith Ave & Pacific (Lat: 47.976050,  Lng: -122.198472),  Route carried "on" structure: City street 420,  Year Built: 2002,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 10,100 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,000 (year 2040),  Design Load: HL 93,  Features Intersected: Pacific Avenue,  Facility Carried by Structure: Smith Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.4m (103.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.61m (21.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,340,000,  Roadway Improvement Cost: $868,000,  Total Project Cost: $8,680,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87271,  Location: Inter Terminal & Everett (Lat: 47.981825,  Lng: -122.215631),  Route carried "on" structure: Business City street 420,  Year Built: 2003,  Status: Open,  Structure Length: 5.67m (18.60ft),  Average Daily Traffic: 650 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,200 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BNSF RR,  Facility Carried by Structure: Everett Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 0.0m,  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.97m (19.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,920,000,  Roadway Improvement Cost: $784,000,  Total Project Cost: $7,840,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87686,  Location: 0.01 Mi East Jct I-5 (Lat: 47.964061,  Lng: -122.196806),  Route carried "on" structure: City street 420,  Year Built: 2006,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 500 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,500 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Smith Avenue,  Facility Carried by Structure: 41st St.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 20.8m (68.2ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 87687,  Location: 0.1 E Jct I-5 (Lat: 47.963925,  Lng: -122.195231),  Route carried "on" structure: City street 420,  Year Built: 2006,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 320 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,200 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BNSF RR & Maple St,  Facility Carried by Structure: 41st St.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.35m (27.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $6,795,000,  Roadway Improvement Cost: $1,359,000,  Total Project Cost: $13,590,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 87974,  Location: 0.1 NE Jct E. Marine View (Lat: 48.011442,  Lng: -122.188767),  Route carried "on" structure: City street 420,  Year Built: 1998,  Status: Open,  Structure Length: 19.39m (63.62ft),  Average Daily Traffic: 1,000 (year 2021),  Truck Traffic: 40%,  Average Future Daily Traffic: 2,000 (year 2043),  Design Load: HS 20,  Features Intersected: BNSF Railroad,  Facility Carried by Structure: Riverside Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: Local Agency,  Maintenance Responsibility: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.69m (64.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $9,819,000,  Roadway Improvement Cost: $1,964,000,  Total Project Cost: $19,638,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 88835,  Location: 1.4 N JCT I-5 (Lat: 47.979639,  Lng: -122.201556),  Route carried "on" structure: City street 420,  Year Built: 2016,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 32,900 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 40,100 (year 2040),  Design Load: HL 93,  Features Intersected: BNSF RAILWAY,  Facility Carried by Structure: BROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.221,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 3.5m (11.5ft),  Right: 3.5m (11.5ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 30.3m (99.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8885,  Location: 0.5 mi SE JCT 1-5/41st (Lat: 47.961419,  Lng: -122.193181),  Route carried "on" structure: City street 420,  Year Built: 2012,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 1,244 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,600 (year 2038),  Design Load: HL 93,  Features Intersected: Bigelow Creek,  Facility Carried by Structure: Riverfront BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,733,000,  Roadway Improvement Cost: $347,000,  Total Project Cost: $3,466,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 89015,  Location: 4.7 NE JCT SR2 (Lat: 47.908944,  Lng: -121.824028),  Route carried "on" structure: City street ,  Year Built: 2017,  Status: Closed,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 140 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 200 (year 2040),  Design Load: HL 93,  Features Intersected: WOODS LAKE CREEK,  Facility Carried by Structure: LAKE CHAPLAIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft)

Condition: Channel: Good,  Culverts: Very good,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $109,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $218,000 ( Estimate for 2014),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: OP,  Location: 1.2 E JCT SR 525 (Lat: 47.921750,  Lng: -122.276278),  Route carried "under" structure: State highway 526,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 37,497 (year 2019),  Truck Traffic: 5%,  Features Intersected: STATE ROUTE 526,  Facility Carried by Structure: BOEING TRAFFIC
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 1.996,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 3842B,  Location: 0.1 N JCT I-5 (Lat: 47.961272,  Lng: -122.200706),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 9,003 (year 2019),  Truck Traffic: 5%,  Features Intersected: I-5 RAMPS,  Facility Carried by Structure: BROADWAY AVE. NB
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 4788A,  Location: 4.9 N JCT I-5 (Lat: 48.011250,  Lng: -122.190417),  Route carried "under" structure: State highway 529,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 11,670 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 529/E MARINE VIEW DR
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 7.918,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 9.4m (30.8ft)

Find on map >>   Show street view

Structure Number: 4788B,  Location: 4.9 N JCT I-5 (Lat: 48.011639,  Lng: -122.190389),  Route carried "under" structure: State highway 529,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 11,670 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 529/E MARINE VIEW DR
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 7.902,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 9.4m (30.8ft)

Find on map >>   Show street view

Structure Number: 7116A,  Location: JCT I-5 & SR 527 (Lat: 47.916772,  Lng: -122.208478),  Route carried "under" structure: Ramp State highway 526,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 14,426 (year 2019),  Truck Traffic: 4%,  Features Intersected: SR 526 EB TO I-5 SB,  Facility Carried by Structure: I-5 SB TO SR 99 SB
Minimum Vertical Clearance: 6.02m (19.75ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 7116B,  Location: 2.8 N JCT SR 96 (Lat: 47.915056,  Lng: -122.208917),  Route carried "under" structure: Interstate 5,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 130,102 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-5,  Facility Carried by Structure: SR 99
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 304.311,  Lanes on structure: 1,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 7651B,  Location: JCT US 2 (Lat: 47.978397,  Lng: -122.168917),  Route carried "under" structure: State highway 204,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 5,963 (year 2019),  Truck Traffic: 4%,  Features Intersected: EBEY SLOUGH AND SR 204,  Facility Carried by Structure: US 2
Minimum Vertical Clearance: 9.02m (29.59ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 7888C,  Location: JCT I-5 (Lat: 47.976611,  Lng: -122.190417),  Route carried "under" structure: State highway 529,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 6,239 (year 2019),  Truck Traffic: 8%,  Features Intersected: SR 529 / PACIFIC AVE,  Facility Carried by Structure: I-5
Minimum Vertical Clearance: 6.05m (19.85ft),  Kilometerpoint: 0.001,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 7888D,  Location: JCT I-5 (Lat: 47.976611,  Lng: -122.190689),  Route carried "under" structure: State highway 529,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 6,239 (year 2019),  Truck Traffic: 8%,  Features Intersected: SR 529 - PACIFIC AVE,  Facility Carried by Structure: I-5
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.016,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 7888E,  Location: BEGIN ROUTE US 2 EB (Lat: 47.978889,  Lng: -122.189528),  Route carried "under" structure: US 2,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 23,952 (year 2019),  Truck Traffic: 3%,  Features Intersected: US 2 EB/HEWITT AVE,  Facility Carried by Structure: I-5
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.016,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 7888F,  Location: BEGIN ROUTE US 2 EB (Lat: 47.978889,  Lng: -122.190028),  Route carried "under" structure: US 2,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 23,952 (year 2019),  Truck Traffic: 3%,  Features Intersected: US 2 EB/HEWITT AVE,  Facility Carried by Structure: I-5
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.001,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 7888G,  Location: JCT I-5 (Lat: 47.981611,  Lng: -122.186750),  Route carried "under" structure: Spur State highway 529,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 6,927 (year 2019),  Truck Traffic: 4%,  Features Intersected: SR 529 SPUR/EVERETT AVE,  Facility Carried by Structure: I-5
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 0.933,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 7888H,  Location: JCT I-5 (Lat: 47.981600,  Lng: -122.187106),  Route carried "under" structure: Spur State highway 529,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 6,927 (year 2019),  Truck Traffic: 4%,  Features Intersected: SR 529 SPUR/EVERETT AVE,  Facility Carried by Structure: I-5
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.917,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 7889A,  Location: 0.9 N JCT SR 527 (Lat: 47.929917,  Lng: -122.198556),  Route carried "under" structure: Interstate 5,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 193,876 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-5
Minimum Vertical Clearance: 6.25m (20.51ft),  Kilometerpoint: 306.113,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 8085A,  Location: 5.0 N JCT SR 527 (Lat: 47.980661,  Lng: -122.187919),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 8,374 (year 2019),  Truck Traffic: 5%,  Features Intersected: S-E RAMP,  Facility Carried by Structure: US 2
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.338,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 10.7m (35.1ft)

Find on map >>   Show street view

Structure Number: 8085B,  Location: 5.0 N JCT SR 527 (Lat: 47.980764,  Lng: -122.187869),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 8,374 (year 2019),  Truck Traffic: 5%,  Features Intersected: S-E RAMP,  Facility Carried by Structure: US 2 WB
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 8085C,  Location: JCT US 2 (Lat: 47.980833,  Lng: -122.187222),  Route carried "under" structure: Ramp US 2,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 23,030 (year 2019),  Truck Traffic: 5%,  Features Intersected: W-S,W-W,S-E RAMPS,  Facility Carried by Structure: I-5
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 0.113,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 8085D,  Location: JCT US 2 (Lat: 47.980833,  Lng: -122.188500),  Route carried "under" structure: Ramp US 2,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 23,030 (year 2019),  Truck Traffic: 5%,  Features Intersected: W-S,W-W,S-E RAMPS,  Facility Carried by Structure: I-5
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 0.145,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 8085E,  Location: 5.0 N JCT SR 527 (Lat: 47.981750,  Lng: -122.187675),  Route carried "under" structure: Ramp State highway 5,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 8,374 (year 2019),  Truck Traffic: 10%,  Features Intersected: I-5 S-E RAMP
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.209,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 8085F,  Location: 0.6 N JCT US 2 (Lat: 47.986889,  Lng: -122.183417),  Route carried "under" structure: Interstate 5,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 152,747 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-5, W-N RAMP,  Facility Carried by Structure: 23RD ST
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 312.921,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 8132I,  Location: JCT I-5 (Lat: 47.964444,  Lng: -122.201333),  Route carried "under" structure: City street 5,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 29,379 (year 2012),  Truck Traffic: 13%,  Features Intersected: BROADWAY,  Facility Carried by Structure: 41ST ST
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 5.890,  Lanes on structure: 7,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 8226A,  Location: 2.4 N JCT US 2 (Lat: 48.007528,  Lng: -122.174806),  Route carried "under" structure: Interstate 5,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 132,112 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-5,  Facility Carried by Structure: 12TH ST NE
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 315.431,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 8256B,  Location: 1.0 N JCT US 2 (Lat: 47.992000,  Lng: -122.181444),  Route carried "under" structure: City street 5,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 11,309 (year 2014),  Truck Traffic: 10%,  Features Intersected: SNOHOMISH R GN RY
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.097,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 65.2m (213.9ft)

Find on map >>   Show street view

Structure Number: 8446C,  Location: 2.2 E JCT SR 525 (Lat: 47.922750,  Lng: -122.260889),  Route carried "under" structure: State highway 526,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 37,439 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 526 MAINLINE,  Facility Carried by Structure: S-E RAMP
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 3.170,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 8446E,  Location: 3.5 E JCT SR 525 (Lat: 47.923158,  Lng: -122.228486),  Route carried "under" structure: State highway 526,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 60,150 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 526,  Facility Carried by Structure: PED BEVERLY LANE
Minimum Vertical Clearance: 9.96m (32.68ft),  Kilometerpoint: 5.584,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 8446F,  Location: 3.5 E JCT SR 525 (Lat: 47.922861,  Lng: -122.227222),  Route carried "under" structure: State highway 526,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 60,150 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 526,  Facility Carried by Structure: EVERGREEN WAY
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 5.697,  Lanes on structure: 9,  Lanes under structure: 5,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 8707A,  Location: 2.8 N JCT SR 96 (Lat: 47.916139,  Lng: -122.206333),  Route carried "under" structure: Interstate 5,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 130,102 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-5, SR 527, BROADWAY AV
Minimum Vertical Clearance: 15.24m (50.00ft),  Kilometerpoint: 304.713,  Lanes on structure: 2,  Lanes under structure: 23,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 76.8m (252.0ft)

Find on map >>   Show street view

Structure Number: 8707B,  Location: 2.8 N JCT SR 96 (Lat: 47.920972,  Lng: -122.207639),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 19,246 (year 2019),  Truck Traffic: 5%,  Features Intersected: I-5 TO SR 526 RAMP,  Facility Carried by Structure: BROADWAY AVE
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 0.435,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 8707C,  Location: JCT I-5 & SR 527 (Lat: 47.918889,  Lng: -122.208894),  Route carried "under" structure: Ramp State highway 526,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 14,426 (year 2019),  Truck Traffic: 4%,  Features Intersected: SR 526 E-S RAMP,  Facility Carried by Structure: BROADWAY
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.547,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 13048A,  Location: 2.8 N JCT SR 96 (Lat: 47.918056,  Lng: -122.206389),  Route carried "under" structure: Interstate 5,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 130,102 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-5
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 304.665,  Lanes on structure: 5,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 14372B,  Location: 2.8 N JCT SR 96 (Lat: 47.920583,  Lng: -122.208194),  Route carried "under" structure: Interstate 5,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 130,102 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-5 BROADWAY AVE
Minimum Vertical Clearance: 10.29m (33.76ft),  Kilometerpoint: 304.987,  Lanes on structure: 1,  Lanes under structure: 17,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 67.4m (221.1ft)

Find on map >>   Show street view

Structure Number: 16991A,  Location: 3.1 N JCT SR 527 (Lat: 47.958661,  Lng: -122.199036),  Route carried "under" structure: Interstate 5,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 193,876 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-5,  Facility Carried by Structure: N-N RAMP
Minimum Vertical Clearance: 8.97m (29.43ft),  Kilometerpoint: 309.718,  Lanes on structure: 1,  Lanes under structure: 9,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 78.3m (256.9ft)

Find on map >>   Show street view

Structure Number: 16991C,  Location: 3.8 N JCT SR 527 (Lat: 47.959500,  Lng: -122.199944),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 2,097 (year 2019),  Truck Traffic: 7%,  Features Intersected: NB & SB HOV RAMPS
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.338,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: 16991L,  Location: 4.1 N JCT SR 527 (Lat: 47.964139,  Lng: -122.199472),  Route carried "under" structure: Interstate 5,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 159,383 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-5,  Facility Carried by Structure: 41ST ST NE
Minimum Vertical Clearance: 6.81m (22.34ft),  Kilometerpoint: 310.056,  Lanes on structure: 6,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 17163A,  Location: 1.3 N JCT SR 96 (Lat: 47.896417,  Lng: -122.216944),  Route carried "under" structure: Interstate 5,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 87,357 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-5 SB,  Facility Carried by Structure: 112TH ST SE
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 302.138,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 17163B,  Location: 1.3 N JCT SR 96 (Lat: 47.896417,  Lng: -122.215417),  Route carried "under" structure: Interstate 5,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 87,357 (year 2019),  Truck Traffic: 6%,  Features Intersected: I-5 NB,  Facility Carried by Structure: 112TH ST SE
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 302.138,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 85901,  Location: 0.2 N EVERETT AVE (Lat: 47.984500,  Lng: -122.214250),  Route carried "under" structure: State highway 529,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 12,374 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 529/W MARINE VIEW DR,  Facility Carried by Structure: PEDESTRIAN
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 2.639,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 86226,  Location: 0.9 MI W OF JCT I5 (Lat: 47.961525,  Lng: -122.217611),  Route carried "under" structure: City street 420,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 14,100 (year 2016),  Truck Traffic: 5%,  Features Intersected: MUKILTEO BOULEVARD,  Facility Carried by Structure: FED.AV.PED.TRAFFIC
Minimum Vertical Clearance: 6.43m (21.10ft),  Kilometerpoint: 16.093,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 18.9m (62.0ft)

Discuss Everett, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.