Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Farmington, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 51Number of bridges
  • 636ft / 194mTotal length
  • $6,577,000Total costs
  • 292,633Total average daily traffic
  • 28,702Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Farmington
  • No street view available for this location

New bridges in Farmington, MO - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 51920-1929
  • 61930-1939
  • 21940-1949
  • 11950-1959
  • 111960-1969
  • 41970-1979
  • 21980-1989
  • 41990-1999
  • 132000-2009
  • 12010-2019
  • 12020-2022
Reconstructed bridges in Farmington, MO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 21970-1979
  • 11980-1989
  • 31990-1999
  • 42000-2009
Average Bridge Daily Traffic in Farmington, MO
Average Bridge Truck Traffic in Farmington, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.2%Excellent
  • 20.8%Very good
  • 41.7%Good
  • 12.5%Satisfactory
  • 16.7%Fair
  • 4.2%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Excellent
  • 8.3%Very good
  • 20.8%Good
  • 29.2%Satisfactory
  • 16.7%Fair
  • 8.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.2%Excellent
  • 12.5%Very good
  • 41.7%Good
  • 33.3%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.7%Excellent
  • 11.4%Very good
  • 20.0%Good
  • 45.7%Satisfactory
  • 17.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 5.9%Excellent
  • 41.2%Good
  • 47.1%Satisfactory
  • 5.9%Fair
Find on map >>   Show street view

Structure Number: 12061,  Location: S 26 T 36 N R 5 E (Lat: 37.795750,  Lng: -90.442406),  Route carried "under" structure: US 67,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 12,031 (year 2021),  Truck Traffic: 9%,  Features Intersected: US 67
Minimum Vertical Clearance: 8.66m (28.41ft),  Kilometerpoint: 153.937,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.8m (163.4ft)

Find on map >>   Show street view

Structure Number: 247,  Location: S 298 T 35 N R 5 E (Lat: 37.771811,  Lng: -90.445161),  Route carried "under" structure: US 67,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 8,786 (year 2021),  Truck Traffic: 12%,  Features Intersected: US 67,  Facility Carried by Structure: MO 221 S
Minimum Vertical Clearance: 4.73m (15.52ft),  Kilometerpoint: 156.562,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 247,  Location: S 298 T 35 N R 5 E (Lat: 37.771811,  Lng: -90.445161),  Route carried "under" structure: US 67,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 7,337 (year 2021),  Truck Traffic: 12%,  Features Intersected: US 67,  Facility Carried by Structure: MO 221 S
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 161.551,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 2963,  Location: S 2969 T 36 N R 5 E (Lat: 37.789789,  Lng: -90.443592),  Route carried "under" structure: US 67,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 11,496 (year 2021),  Truck Traffic: 8%,  Features Intersected: US 67,  Facility Carried by Structure: MAPLE ST E
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 163.551,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 2963,  Location: S 2969 T 36 N R 5 E (Lat: 37.789789,  Lng: -90.443592),  Route carried "under" structure: US 67,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 12,031 (year 2021),  Truck Traffic: 9%,  Features Intersected: US 67,  Facility Carried by Structure: MAPLE ST E
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 154.541,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 3163,  Location: S 15 T 36 N R 5 E (Lat: 37.822978,  Lng: -90.461419),  Route carried "under" structure: US 67,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 17,330 (year 2021),  Truck Traffic: 9%,  Features Intersected: US 67,  Facility Carried by Structure: FAIRGROUNDS DR N
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 150.381,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 3163,  Location: S 15 T 36 N R 5 E (Lat: 37.822978,  Lng: -90.461419),  Route carried "under" structure: US 67,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 17,190 (year 2021),  Truck Traffic: 8%,  Features Intersected: US 67,  Facility Carried by Structure: FAIRGROUNDS DR N
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 167.782,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 447,  Location: S 26 T 36 N R 5 E (Lat: 37.796431,  Lng: -90.442508),  Route carried "under" structure: State highway 32,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 9,480 (year 2021),  Truck Traffic: 5%,  Features Intersected: MO 32,  Facility Carried by Structure: US 67 N
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 408.464,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Discuss Farmington, Missouri (MO) on our hugely popular Missouri forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.