Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fort Polk South, Louisiana (LA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 66Number of bridges
  • 400ft / 122mTotal length
  • $415,000Total costs
  • 35,434Total average daily traffic
  • 10,943Total average daily truck traffic
  • 34,398Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fort Polk South
  • No street view available for this location

New bridges in Fort Polk South, LA - historical statistics
  • New bridges - historical statistics
  • 41960-1969
  • 251970-1979
  • 161980-1989
  • 51990-1999
  • 152000-2009
  • 12010-2019
Average Bridge Daily Traffic in Fort Polk South, LA
Average Bridge Truck Traffic in Fort Polk South, LA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Good
  • 64.3%Satisfactory
  • 7.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.7%Very good
  • 17.9%Good
  • 50.0%Satisfactory
  • 21.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.6%Very good
  • 53.6%Good
  • 28.6%Satisfactory
  • 10.7%Fair
  • 3.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.2%Good
  • 49.2%Satisfactory
  • 26.2%Fair
  • 15.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 39.5%Good
  • 47.4%Satisfactory
  • 10.5%Fair
  • 2.6%Poor
Find on map >>   Show street view

Structure Number: 80605000002529,  Location: 6.3 M. NE. OF ROSEPIN (Lat: 30.992147,  Lng: -93.220353),  Route carried "on" structure: Federal lands road 422.4,  Year Built: 1970,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 60 (year 1976),  Average Future Daily Traffic: 90 (year 2042),  Design Load: HS 20,  Features Intersected: BUNDKICK CREEK TRIB.,  Facility Carried by Structure: 422 FDR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.792,  Lanes on structure: 2,  Owner: U.S. Forest Service,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 25.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 8060500000253,  Location: 6.4 M. NE. OF ROSEPIN (Lat: 30.992731,  Lng: -93.219325),  Route carried "on" structure: Federal lands road 422.4,  Year Built: 1970,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 60 (year 1976),  Average Future Daily Traffic: 90 (year 2042),  Design Load: HS 20,  Features Intersected: BUNDICK CREEK TRIB,  Facility Carried by Structure: 422 FDR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.908,  Lanes on structure: 2,  Owner: U.S. Forest Service,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 25.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 80605000002531,  Location: 6.5 M. NE. OF ROSEPIN (Lat: 30.993114,  Lng: -93.218608),  Route carried "on" structure: Federal lands road 422.4,  Year Built: 1970,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 60 (year 1976),  Average Future Daily Traffic: 90 (year 2042),  Design Load: HS 20,  Features Intersected: BUNDICK CREEK,  Facility Carried by Structure: 422 FDR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.988,  Lanes on structure: 2,  Owner: U.S. Forest Service,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 25.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 80605000002532,  Location: 3.5 M. ESE. OF PICKE (Lat: 31.017228,  Lng: -93.210169),  Route carried "on" structure: Federal lands road 422.6,  Year Built: 1975,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 250 (year 1976),  Truck Traffic: 20%,  Average Future Daily Traffic: 375 (year 2042),  Design Load: HS 20,  Features Intersected: BUNDICK CREEK,  Facility Carried by Structure: 422 FDR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.366,  Lanes on structure: 2,  Owner: U.S. Forest Service,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 80605000002533,  Location: 3.5 MI.E.S.E.OF PICKERING (Lat: 31.017853,  Lng: -93.210314),  Route carried "on" structure: Federal lands road 422.6,  Year Built: 1983,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 250 (year 1976),  Truck Traffic: 20%,  Average Future Daily Traffic: 375 (year 2042),  Design Load: HS 20,  Features Intersected: BUNDICK CREEK,  Facility Carried by Structure: 422 FDR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.436,  Lanes on structure: 2,  Owner: U.S. Forest Service,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 85800000043072,  Location: 1.2 MI EAST OF LA 467 (Lat: 31.028961,  Lng: -93.199100),  Route carried "on" structure: State highway 10,  Year Built: 1985,  Status: Open,  Structure Length: 5.52m (18.11ft),  Average Daily Traffic: 2,600 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,800 (year 2036),  Design Load: HS 20,  Features Intersected: BUNDICK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.771,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 858-03-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 85808580302401,  Location: 2.4 MI EAST OF US 171 (Lat: 31.028950,  Lng: -93.229100),  Route carried "on" structure: State highway 10,  Year Built: 1975,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 7,200 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,280 (year 2036),  Design Load: HS 20,  Features Intersected: BEAR BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.906,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 858-03-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: DAPFORPOK000H02,  Location: VE799316 (Lat: 31.018039,  Lng: -93.210381),  Route carried "on" structure: Other road ,  Year Built: 1982,  Status: Posted for load,  Structure Length: 1.29m (4.23ft),  Average Daily Traffic: 336 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 350 (year 2042),  Design Load: HS 20,  Features Intersected: BUNDICK CREEK,  Facility Carried by Structure: GEORGIA AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.6m (41.3ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 19.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.94m (6.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: DAPFORPOK000H13,  Location: VE823384 (Lat: 31.079550,  Lng: -93.185489),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 100 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 110 (year 2042),  Features Intersected: DRAKES CREEK,  Facility Carried by Structure: MILL CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.48m (4.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK000H14,  Location: VE 858 387 (Lat: 31.080969,  Lng: -93.148819),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Posted for load,  Structure Length: 2.79m (9.15ft),  Average Daily Traffic: 50 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 60 (year 2042),  Design Load: HS 20,  Features Intersected: WHISKEY CHITTO CREEK,  Facility Carried by Structure: MILL CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.3m (30.5ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: DAPFORPOK000H15,  Location: VE 859 388 (Lat: 31.082181,  Lng: -93.147850),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Posted for load,  Structure Length: 2.78m (9.12ft),  Average Daily Traffic: 50 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 100 (year 2042),  Features Intersected: WHISKEY CHITTO CREEK,  Facility Carried by Structure: MILL CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.3m (30.5ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: DAPFORPOK000H18,  Location: VE 926 368 (Lat: 31.065200,  Lng: -93.078219),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 120 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 150 (year 2042),  Design Load: Greater than HL93,  Features Intersected: BIRDS CREEK,  Facility Carried by Structure: HOLLY SPRINGS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.3m (53.5ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.23m (13.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: DAPFORPOK000H19,  Location: VE 948 374 (Lat: 31.069819,  Lng: -93.054631),  Route carried "on" structure: Other road ,  Year Built: 1972,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 200 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 250 (year 2042),  Design Load: Greater than HL93,  Features Intersected: TRIB TO BIRDS CREEK,  Facility Carried by Structure: HOLLY SPRINGS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.8m (48.6ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 83.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: DAPFORPOK000H2,  Location: VE 844 416 (Lat: 31.108039,  Lng: -93.164281),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Posted for load,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 720 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 750 (year 2042),  Design Load: HS 20,  Features Intersected: WHISKEY CHITTO CREEK,  Facility Carried by Structure: MOBILE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK000H21,  Location: VE 844 414 (Lat: 31.106419,  Lng: -93.164269),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 10 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 20 (year 2042),  Design Load: HS 15,  Features Intersected: WHISKEY CHITTO CREEK,  Facility Carried by Structure: MONTICELLO ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 29.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $7,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: DAPFORPOK000H22,  Location: VE 867 417 (Lat: 31.108961,  Lng: -93.139639),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 1,200 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 1,250 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: WHISKEY CHITTO CREEK,  Facility Carried by Structure: ARTILLERY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.58m (15.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: DAPFORPOK000H23,  Location: VE 899 428 (Lat: 31.119261,  Lng: -93.105181),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 1,000 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 1,050 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: BIRDS CREEK,  Facility Carried by Structure: ARTILLERY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.9m (68.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 90.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: DAPFORPOK000H31,  Location: VE 763 358 (Lat: 31.055800,  Lng: -93.249169),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 4,500 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 4,550 (year 2042),  Features Intersected: BAYOU ZOURIE BRANCH,  Facility Carried by Structure: LOUISIANA AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 14.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 11.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.31m (10.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $37,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORPOK000H32,  Location: VE 757 360 (Lat: 31.057381,  Lng: -93.255950),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 4,500 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 4,550 (year 2042),  Design Load: HS 20,  Features Intersected: BAYOU ZOURIE BRANCH,  Facility Carried by Structure: LOUISIANA AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 16.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 7.14m (23.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORPOK000H33,  Location: FT. POLK, LA (Lat: 31.064750,  Lng: -93.269969),  Route carried "on" structure: Other road ,  Year Built: 1972,  Status: Posted for load,  Structure Length: 4.89m (16.04ft),  Average Daily Traffic: 4,500 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 4,550 (year 2042),  Design Load: HS 20,  Features Intersected: KCS RAILROAD,  Facility Carried by Structure: LOUISIANA AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.2m (30.2ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 13.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.90m (19.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $138,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $143,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORPOK000H34,  Location: VE 821 349 (Lat: 31.048150,  Lng: -93.187131),  Route carried "on" structure: Other road ,  Year Built: 1979,  Status: Closed,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 2 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 3 (year 2042),  Features Intersected: BUNDICK CREEK,  Facility Carried by Structure: AIRFIELD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORPOK000H55,  Location: VE 814 412 (Lat: 31.103939,  Lng: -93.195550),  Route carried "on" structure: Other road ,  Year Built: 1980,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 300 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 350 (year 2042),  Features Intersected: BAYOU ZOURIE TRIB,  Facility Carried by Structure: RIVERTON DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.0m (6.6ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $27,000,  Total Project Cost: $27,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H21A,  Location: VE 844 412 (Lat: 31.104689,  Lng: -93.164461),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Open,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 20 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 25 (year 2042),  Design Load: HS 20,  Features Intersected: WHISKEY CHITTO CREEK,  Facility Carried by Structure: DALLAS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: DAPFORPOK00H24P,  Location: VE 818 668 (Lat: 31.335281,  Lng: -93.191669),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 40 (year 2020),  Truck Traffic: 40%,  Average Future Daily Traffic: 50 (year 2042),  Features Intersected: COMRADE CREEK,  Facility Carried by Structure: PERIMETER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H26P,  Location: VE 753 653 (Lat: 31.321731,  Lng: -93.259700),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Open,  Structure Length: 1.12m (3.67ft),  Average Daily Traffic: 40 (year 2020),  Truck Traffic: 40%,  Average Future Daily Traffic: 50 (year 2042),  Features Intersected: MARTIN CREEK,  Facility Carried by Structure: PERIMETER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.2m (7.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H28P,  Location: VE 713 664 (Lat: 31.332331,  Lng: -93.312550),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 50 (year 2042),  Features Intersected: DOWDEN CREEK,  Facility Carried by Structure: PERIMETER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.7m (5.6ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H29P,  Location: VE 680 716 (Lat: 31.378169,  Lng: -93.336369),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 50 (year 2042),  Features Intersected: WEST ANACOCO CREEK,  Facility Carried by Structure: PERIMETER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.9m (9.5ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H36P,  Location: VE757727 (Lat: 31.388061,  Lng: -93.255831),  Route carried "on" structure: Other road ,  Year Built: 1963,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 40 (year 2020),  Truck Traffic: 40%,  Average Future Daily Traffic: 50 (year 2042),  Features Intersected: LYLES CREEK,  Facility Carried by Structure: TRAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H37P,  Location: VE 765 716 (Lat: 31.378181,  Lng: -93.246461),  Route carried "on" structure: Other road ,  Year Built: 1964,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 40 (year 2020),  Truck Traffic: 40%,  Average Future Daily Traffic: 50 (year 2042),  Features Intersected: LITTLE SANDY CREEK,  Facility Carried by Structure: TRAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H38P,  Location: PEASON RIDGE TRAIN. AREA (Lat: 31.369881,  Lng: -93.231600),  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 50 (year 2042),  Features Intersected: STAGESTAND CREEK,  Facility Carried by Structure: TRAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 5.3m (17.4ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H39P,  Location: VE817710 (Lat: 31.373611,  Lng: -93.192500),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 50 (year 2042),  Features Intersected: ODOM CREEK,  Facility Carried by Structure: ROCK QUARRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.73m (8.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H40P,  Location: VE 713 688 (Lat: 31.351519,  Lng: -93.302100),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 50 (year 2042),  Features Intersected: DOWDEN CREEK,  Facility Carried by Structure: HAYNES SETTLEMENT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.12m (10.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H41P,  Location: VE 703 688 (Lat: 31.353600,  Lng: -93.313150),  Route carried "on" structure: Other road ,  Year Built: 1968,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 50 (year 2042),  Features Intersected: DOWDEN CREEK,  Facility Carried by Structure: DOWDEN CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H42P,  Location: VE 801 680 (Lat: 31.346389,  Lng: -93.208611),  Route carried "on" structure: Other road ,  Year Built: 1969,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 50 (year 2042),  Features Intersected: COMRADE CREEK,  Facility Carried by Structure: YELLOW BRICK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H43P,  Location: V 803 670 (Lat: 31.337581,  Lng: -93.206511),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 50 (year 2042),  Features Intersected: TRIB OF COMRADE CREEK,  Facility Carried by Structure: OAKIE FLAT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H45P,  Location: VE 814 715 (Lat: 31.378250,  Lng: -93.195719),  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 99%,  Average Future Daily Traffic: 40 (year 2042),  Features Intersected: ODOM CREEK,  Facility Carried by Structure: TRAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H46P,  Location: VE 812 719 (Lat: 31.381881,  Lng: -93.197281),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 40 (year 2042),  Features Intersected: ODOM CREEK,  Facility Carried by Structure: UNNAMED ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H50P,  Location: VE 812 723 (Lat: 31.385319,  Lng: -93.197419),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 99%,  Average Future Daily Traffic: 40 (year 2042),  Features Intersected: ODOM CREEK,  Facility Carried by Structure: 505 ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H51P,  Location: VE 823 727 (Lat: 31.388219,  Lng: -93.185900),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 1.32m (4.33ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 40 (year 2042),  Features Intersected: TIGER CREEK,  Facility Carried by Structure: ROCK QUARRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.99m (6.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H52P,  Location: VE 826 720 (Lat: 31.382619,  Lng: -93.182181),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 99%,  Average Future Daily Traffic: 40 (year 2042),  Features Intersected: TIGER CREEK,  Facility Carried by Structure: TRAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.8m (22.3ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORPOK00H53P,  Location: VE 815 703 (Lat: 31.366700,  Lng: -93.194481),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 99%,  Average Future Daily Traffic: 40 (year 2042),  Features Intersected: ODOM CREEK,  Facility Carried by Structure: UNNAMED ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Discuss Fort Polk South, Louisiana (LA) on our hugely popular Louisiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.