Bridge Statistics for Framingham, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 68Number of bridges
  • 646ft / 197mTotal length
  • $155,747,000Total costs
  • 1,979,831Total average daily traffic
  • 121,946Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Framingham
  • No street view available for this location

New bridges in Framingham, MA - historical statistics
  • New bridges - historical statistics
  • 6Before 1900
  • 11900-1909
  • 11920-1929
  • 41930-1939
  • 21940-1949
  • 401950-1959
  • 21960-1969
  • 21970-1979
  • 41980-1989
  • 21990-1999
  • 22000-2009
  • 22010-2019
Reconstructed bridges in Framingham, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 181980-1989
  • 51990-1999
  • 32000-2009
  • 22010-2019
  • 22020-2022
Average Bridge Daily Traffic in Framingham, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 28.9%Good
  • 44.4%Satisfactory
  • 15.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.0%Very good
  • 30.0%Good
  • 32.0%Satisfactory
  • 24.0%Fair
  • 2.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.0%Very good
  • 44.0%Good
  • 26.0%Satisfactory
  • 22.0%Fair
  • 2.0%Poor
  • 2.0%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.2%Very good
  • 36.4%Good
  • 40.9%Satisfactory
  • 4.5%Fair
Find on map >>   Show street view

Structure Number: F07001BM6DOTNBI,  Location: .5 MI. WEST OF TEMPLE ST (Lat: 42.294244,  Lng: -71.457653),  Route carried "on" structure: State highway 9,  Year Built: 2016,  Status: Open,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 52,000 (year 2005),  Truck Traffic: 15%,  Design Load: HL 93,  Features Intersected: WATER RESERVOIR OUTLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 187.701,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 26.3m (86.3ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.1m (95.5ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 20.3m (66.6ft),  Out-to-Out Width: 27.0m (88.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F07002244MUNNBI,  Location: .75 MI SE OF RTE 9 (Lat: 42.293653,  Lng: -71.448992),  Route carried "on" structure: City street ,  Year Built: 1870,  Year Reconstructed: 1927,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 15,600 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 24,637 (year 2033),  Features Intersected: WATER STEARNS RESERVOIR,  Facility Carried by Structure: HWY SALEM END RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.058,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 64.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: November 2021,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $446,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $670,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F07003245MUNNBI,  Location: .6 M S OF RTE 9 (Lat: 42.291469,  Lng: -71.441992),  Route carried "on" structure: City street ,  Year Built: 1877,  Year Reconstructed: 1930,  Status: Posted for load,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 17,500 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 27,638 (year 2031),  Features Intersected: WATER SUDBURY RIVER,  Facility Carried by Structure: HWY WINTER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.076,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.2m (20.3ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $246,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $370,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F07004246MUNNBI,  Location: .4 MI S OF MAIN ST (Lat: 42.292781,  Lng: -71.427475),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 12,557 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 54,012 (year 2032),  Design Load: HS 20,  Features Intersected: WATER SUDBURY RIVER,  Facility Carried by Structure: HWY UNION AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.754,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $645,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $968,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F07005247MUNNBI,  Location: .1 MI S OF ST-9 (Lat: 42.297056,  Lng: -71.427242),  Route carried "on" structure: City street ,  Year Built: 1878,  Year Reconstructed: 2009,  Status: Posted for load,  Structure Length: 2.34m (7.68ft),  Average Daily Traffic: 7,950 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 12,555 (year 2032),  Design Load: H 15,  Features Intersected: WATER SUDBURY RIVER,  Facility Carried by Structure: HWY MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.3m (66.6ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 21.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $962,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,444,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: F070069BHDOTNBI,  Location: .25 MI W OF PROSPECT ST (Lat: 42.298806,  Lng: -71.426806),  Route carried "on" structure: State highway 9,  Year Built: 2009,  Status: Open,  Structure Length: 2.86m (9.38ft),  Average Daily Traffic: 68,042 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 82,439 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: WATER SUDBURY RIVER
Minimum Vertical Clearance: 99.00m (324.80ft),  Kilometerpoint: 187.701,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 22.0m (72.2ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.5m (90.2ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 22.0m (72.2ft),  Out-to-Out Width: 28.8m (94.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 85.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $28,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $43,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F07007249MUNNBI,  Location: JUST E OF EDGELL RD (Lat: 42.305975,  Lng: -71.431292),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 17,300 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,372 (year 2033),  Design Load: H 20,  Features Intersected: WATER SUDBURY RIVER,  Facility Carried by Structure: HWY CENTRAL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: January 2022,  Underwater Inspection Date: November 2018,  Bridge Improvement Cost: $611,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $917,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F0700924AMUNNBI,  Location: .1 MI W OF CONCORD ST (Lat: 42.324622,  Lng: -71.401506),  Route carried "on" structure: City street ,  Year Built: 1920,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 8,000 (year 2014),  Truck Traffic: 6%,  Average Future Daily Traffic: 12,634 (year 2031),  Design Load: HL 93,  Features Intersected: WATER SUDBURY RIVER,  Facility Carried by Structure: HWY CENTRAL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F07010248MUNNBI,  Location: 500 N OF SCHOOL ST (Lat: 42.322203,  Lng: -71.398328),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 14,425 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 28,427 (year 2032),  Design Load: HS 20,  Features Intersected: WATER SUDBURY RIVER,  Facility Carried by Structure: HWY CONCORD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.423,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $430,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $646,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F0701424DMUNNBI,  Location: .4 MI W OF WINTER ST (Lat: 42.272886,  Lng: -71.444367),  Route carried "on" structure: City street ,  Year Built: 1890,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 10,443 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 18,636 (year 2033),  Design Load: HS 20,  Features Intersected: WATER RESERVOIR 2,  Facility Carried by Structure: HWY FOUNTAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2020,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $832,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $1,249,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F07015BJ6DOT634,  Location: .1MI.NTH.OF ST.135 (Lat: 42.274553,  Lng: -71.436589),  Route carried "on" structure: City street ,  Year Built: 2017,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 13,248 (year 2016),  Truck Traffic: 6%,  Design Load: HL 93,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY WINTER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 64.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F0701629HDOT634,  Location: .1 MI N OF ST-135 (Lat: 42.275017,  Lng: -71.426825),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 2.69m (8.83ft),  Average Daily Traffic: 13,513 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 22,268 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY FOUNTAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 79.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,140,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $4,711,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F0701829JDOT634,  Location: .7 MI. N. OF ST-135 (Lat: 42.288878,  Lng: -71.431286),  Route carried "on" structure: City street ,  Year Built: 1947,  Status: Posted for load,  Structure Length: 3.61m (11.84ft),  Average Daily Traffic: 10,000 (year 2014),  Truck Traffic: 6%,  Average Future Daily Traffic: 32,849 (year 2033),  Design Load: H 15,  Features Intersected: RR CSX,  Facility Carried by Structure: HWY MT WAYTE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 0.0m,  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 30.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,297,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $3,446,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: F0702428HDOTNBI,  Location: AT SOUTHBOROUGH T.L. (Lat: 42.303736,  Lng: -71.489686),  Route carried "on" structure: State highway 30,  Year Built: 1895,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 8,679 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 31,586 (year 2032),  Features Intersected: WATER STONEY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.933,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $498,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $748,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: F07027290DOTNBI,  Location: 1 MI W OF JCT 90 & 9 (Lat: 42.297600,  Lng: -71.490506),  Route carried "on" structure: Ramp State highway 9,  Year Built: 1994,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 8,679 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 16,109 (year 2032),  Design Load: HS 20,  Features Intersected: COMB ST 9 WB & CSX,  Facility Carried by Structure: HWY PLSNT ST CON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.90m (19.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $557,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $836,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F0702828BDOTNBI,  Location: .5 MI W OF NATICK TL (Lat: 42.298233,  Lng: -71.408600),  Route carried "on" structure: State highway 126,  Year Built: 1931,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 35,500 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 56,065 (year 2031),  Design Load: HS 20,  Features Intersected: ST 9 WORCESTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.776,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.1m (49.5ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 81.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $363,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $545,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F07029B7MMUNNBI,  Location: AT CORNER OF TRIPP ST. (Lat: 42.270092,  Lng: -71.413269),  Route carried "on" structure: City street ,  Year Built: 2009,  Status: Open,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 8,300 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,108 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: WATER BEAVER DAM BROOK,  Facility Carried by Structure: HWY HERBERT ST
Minimum Vertical Clearance: 99.00m (324.80ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.7m (28.5ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 79.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $236,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $355,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F0703024BMUNNBI,  Location: .4 MI S OF MAIN ST (Lat: 42.291525,  Lng: -71.429933),  Route carried "on" structure: City street ,  Year Built: 1934,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 17,000 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 33,797 (year 2032),  Features Intersected: WATER SUDBURY RIVER,  Facility Carried by Structure: HWY FRANKLIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.996,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,336,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $2,005,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: F0703824EMUNNBI,  Location: .4MI.S.W. OF FRANKLIN ST. (Lat: 42.287597,  Lng: -71.433536),  Route carried "on" structure: City street ,  Year Built: 1947,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 18,720 (year 2014),  Truck Traffic: 6%,  Average Future Daily Traffic: 29,564 (year 2033),  Design Load: H 20,  Features Intersected: WATER EAMES BROOK,  Facility Carried by Structure: HWY MT WAYTE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 29.9m (98.1ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Fair,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $130,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: F0703924CMUNNBI,  Location: .35 MI E OF ELM ST (Lat: 42.338667,  Lng: -71.394958),  Route carried "on" structure: City street ,  Year Built: 1957,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 3,963 (year 1990),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,738 (year 2032),  Design Load: H 20,  Features Intersected: WATER SUDBURY RIVER,  Facility Carried by Structure: HWY POTTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.460,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2021,  Underwater Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,391,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $2,087,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: F07040275DOTNBI,  Location: .4 MI S OF I-90 (Lat: 42.300156,  Lng: -71.434436),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 38,300 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 60,487 (year 2032),  Design Load: H 20,  Features Intersected: ST 9 WORCESTER RD,  Facility Carried by Structure: HWY MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 5,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 25.3m (83.0ft),  Out-to-Out Width: 30.1m (98.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 66.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 44.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,674,000,  Roadway Improvement Cost: $368,000,  Total Project Cost: $5,512,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: F070444PKDOTNBI,  Location: .3 MI. W. OF MDC RES (Lat: 42.298819,  Lng: -71.475556),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 114,872 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 165,826 (year 2032),  Design Load: HS 20,  Features Intersected: RR CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 179.758,  Lanes on structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 36.0m (118.1ft),  Skew: 33 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 45.0m (147.6ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,182,000,  Roadway Improvement Cost: $319,000,  Total Project Cost: $4,774,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: F070454PHDOTNBI,  Location: .3 MI S OF PLEASANT ST (Lat: 42.300544,  Lng: -71.470275),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 55,791 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 129,503 (year 2033),  Design Load: HL 93,  Features Intersected: WATER MDC RES 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 180.242,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Underwater Inspection Date: August 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F070454PJDOTNBI,  Location: 0.7 MI E OF TEMPLE ST (Lat: 42.300692,  Lng: -71.470333),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 47,529 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 129,503 (year 2031),  Design Load: HL 93,  Features Intersected: WATER MDC RES 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 180.242,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Poor,  Channel: Very good,  Operating Rating: 59.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: March 2022,  Underwater Inspection Date: August 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F070464P7DOTNBI,  Location: MM 114.9 OF I-90 (Lat: 42.314308,  Lng: -71.416397),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 39,895 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 128,275 (year 2032),  Design Load: HS 20,  Features Intersected: WATER SUDBURY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 184.909,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 6 months,  Underwater Inspection Frequency: Every 35 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: July 2021,  Underwater Inspection Date: May 2020,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $4,019,000,  Roadway Improvement Cost: $402,000,  Total Project Cost: $6,029,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F070464P8DOTNBI,  Location: 114.9 MM ON I-90 (Lat: 42.314431,  Lng: -71.416542),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 39,825 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 128,275 (year 2032),  Design Load: HS 20,  Features Intersected: WATER SUDBURY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 184.909,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 35 months,  Inspection Date: July 2021,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $4,019,000,  Roadway Improvement Cost: $402,000,  Total Project Cost: $6,029,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F070474P2DOTNBI,  Location: I-90 MM 116.4 (Lat: 42.313203,  Lng: -71.387892),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 39,495 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 82,124 (year 2032),  Design Load: HS 20,  Features Intersected: OTHER COCHITUATE TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 187.323,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 21.2m (69.6ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,820,000,  Roadway Improvement Cost: $383,000,  Total Project Cost: $5,731,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F070474P3DOTNBI,  Location: I-90 MM 116.4 (Lat: 42.313467,  Lng: -71.388094),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 39,825 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 82,124 (year 2032),  Design Load: HS 20,  Features Intersected: OTHER COCHITUATE TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 187.323,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 18.1m (59.4ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,284,000,  Roadway Improvement Cost: $329,000,  Total Project Cost: $4,927,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F070484PGDOTNBI,  Location: N. OF SPEEN ST (Lat: 42.311336,  Lng: -71.385853),  Route carried "on" structure: Ramp Interstate 90,  Year Built: 1957,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 35,000 (year 2013),  Truck Traffic: 15%,  Average Future Daily Traffic: 55,276 (year 2032),  Design Load: HS 20,  Features Intersected: OTHER COCHITUATE TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 187.612,  Lanes on structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.2m (33.5ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 29.7m (97.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $280,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $421,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F070494PNDOTNBI,  Location: I 90 MM 111.2 (Lat: 42.294067,  Lng: -71.482789),  Route carried "on" structure: Ramp Interstate 90,  Year Built: 1957,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 15,847 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 632 (year 2031),  Design Load: HS 20,  Features Intersected: I 90
Minimum Vertical Clearance: 99.00m (324.80ft),  Kilometerpoint: 178.954,  Lanes on structure: 3,  Lanes under structure: 7,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 15.0m (49.2ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 62.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $4,092,000,  Roadway Improvement Cost: $410,000,  Total Project Cost: $6,139,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F070504PLDOTNBI,  Location: .5 MI W OF MDC RES (Lat: 42.296811,  Lng: -71.478658),  Route carried "on" structure: State highway 9,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 10.15m (33.30ft),  Average Daily Traffic: 45,084 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 86,862 (year 2031),  Design Load: HS 20,  Features Intersected: I 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 179.437,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 25.9m (85.0ft),  Out-to-Out Width: 31.0m (101.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 73.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.20m (33.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $12,421,000,  Roadway Improvement Cost: $1,243,000,  Total Project Cost: $18,632,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F070514PMDOTNBI,  Location: OUTSIDE INT 12 L12 (Lat: 42.296833,  Lng: -71.476253),  Route carried "on" structure: Ramp Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 26,904 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,159 (year 2033),  Design Load: HS 20,  Features Intersected: ST 9 WORCESTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 179.453,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 52.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $3,432,000,  Roadway Improvement Cost: $344,000,  Total Project Cost: $5,149,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F070524PFDOTNBI,  Location: .1 MI. W. OF PLEASANT ST (Lat: 42.301728,  Lng: -71.454114),  Route carried "on" structure: City street ,  Year Built: 1957,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 10.64m (34.91ft),  Average Daily Traffic: 4,000 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,317 (year 2033),  Design Load: HS 20,  Features Intersected: COMB I 90 & CSX,  Facility Carried by Structure: HWY TEMPLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 181.690,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.70m (35.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $4,339,000,  Roadway Improvement Cost: $434,000,  Total Project Cost: $6,509,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F070534PEDOTNBI,  Location: I-90 MM 113.2 (Lat: 42.304078,  Lng: -71.447039),  Route carried "on" structure: State highway 30,  Year Built: 1957,  Year Reconstructed: 1993,  Status: Posted for load,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 8,000 (year 2014),  Truck Traffic: 15%,  Average Future Daily Traffic: 12,634 (year 2033),  Design Load: HS 20,  Features Intersected: I 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 182.173,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 41.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.80m (28.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $4,425,000,  Roadway Improvement Cost: $443,000,  Total Project Cost: $6,638,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F070554PDDOTNBI,  Location: I-90 MM 113.5 (Lat: 42.306553,  Lng: -71.442869),  Route carried "on" structure: City street ,  Year Built: 1957,  Year Reconstructed: 1992,  Status: Posted for load,  Structure Length: 6.00m (19.69ft),  Average Daily Traffic: 3,910 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,054 (year 2033),  Design Load: HS 20,  Features Intersected: I 90,  Facility Carried by Structure: HWY GROVE ST
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 182.656,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,996,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $4,495,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F070564PBDOTNBI,  Location: I-90 MM 113.9 (Lat: 42.309433,  Lng: -71.436425),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 39,495 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 128,275 (year 2031),  Design Load: HS 20,  Features Intersected: HWY EDGELL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 183.299,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 60.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,777,000,  Roadway Improvement Cost: $278,000,  Total Project Cost: $4,166,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing