Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Freeport, Illinois (IL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 99Number of bridges
  • 1,155ft / 352mTotal length
  • $2,870,000Total costs
  • 308,050Total average daily traffic
  • 44,049Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Freeport
  • No street view available for this location

New bridges in Freeport, IL - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21900-1909
  • 11910-1919
  • 31920-1929
  • 81930-1939
  • 41940-1949
  • 91950-1959
  • 71960-1969
  • 61970-1979
  • 351980-1989
  • 81990-1999
  • 92000-2009
  • 62010-2019
Reconstructed bridges in Freeport, IL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 11960-1969
  • 41970-1979
  • 21980-1989
  • 01990-1999
  • 32000-2009
Average Bridge Daily Traffic in Freeport, IL
Average Bridge Truck Traffic in Freeport, IL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.7%Very good
  • 19.6%Good
  • 52.9%Satisfactory
  • 9.8%Fair
  • 2.0%Poor
  • 2.0%Critical
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 23.1%Very good
  • 30.8%Good
  • 30.8%Satisfactory
  • 11.5%Fair
  • 1.9%Poor
  • 1.9%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 19.2%Very good
  • 36.5%Good
  • 38.5%Satisfactory
  • 3.8%Fair
  • 1.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.4%Excellent
  • 25.4%Very good
  • 40.8%Good
  • 26.8%Satisfactory
  • 4.2%Fair
  • 1.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 35.3%Very good
  • 35.3%Good
  • 20.6%Satisfactory
  • 2.9%Fair
  • 5.9%Poor
Find on map >>   Show street view

Structure Number: 896001,  Location: NORTHEAST FREEPORT (Lat: 42.297725,  Lng: -89.605469),  Route carried "on" structure: Other road ,  Year Built: 1952,  Status: Open,  Structure Length: 6.57m (21.56ft),  Average Daily Traffic: 1,450 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,600 (year 2040),  Design Load: H 20,  Features Intersected: PECATONICA RIVER,  Facility Carried by Structure: HANCOCK AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.89m (25.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $589,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $884,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 896003,  Location: AT KRAPE PARK (Lat: 42.277139,  Lng: -89.646850),  Route carried "on" structure: Other road ,  Year Built: 1920,  Status: Closed,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 25 (year 2014),  Truck Traffic: 24%,  Average Future Daily Traffic: 400 (year 2040),  Features Intersected: YELLOW CREEK,  Facility Carried by Structure: PARK COURT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 3.9m (12.8ft),  Out-to-Out Width: 3.9m (12.8ft)

Condition: Deck: Critical,  Superstructure: Imminent failure,  Substructure: Poor,  Channel: Satisfactory,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: December 2010,  Bridge Improvement Cost: $70,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $105,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 897,  Location: N. ENT TO KRAPE PARK (Lat: 42.278653,  Lng: -89.652556),  Route carried "on" structure: County highway ,  Year Built: 1919,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 750 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 600 (year 2040),  Design Load: HS 15,  Features Intersected: YELLOW CREEK,  Facility Carried by Structure: N. PARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: Local Park, Forest, or Reservation Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $274,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $411,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 897001,  Location: S. ENT TO KRAPE PARK (Lat: 42.273208,  Lng: -89.652558),  Route carried "on" structure: County highway ,  Year Built: 1934,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 125 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 200 (year 2040),  Design Load: HS 15,  Features Intersected: YELLOW CREEK,  Facility Carried by Structure: S. PARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: Local Park, Forest, or Reservation Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.17m (10.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $209,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 890044,  Location: 3 MI W OF IL 26 (Lat: 42.331328,  Lng: -89.690714),  Route carried "under" structure: US 20,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 5,900 (year 2021),  Truck Traffic: 23%,  Features Intersected: US20 FREEPORT BYPASS,  Facility Carried by Structure: HARLEM CENTER RD
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 94.353,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.8m (133.9ft)

Find on map >>   Show street view

Structure Number: 890046,  Location: 1 MI EAST IL 26 (Lat: 42.321000,  Lng: -89.608000),  Route carried "under" structure: US 20,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 6,850 (year 2021),  Truck Traffic: 20%,  Features Intersected: US 20 FREEPORT BYPAS,  Facility Carried by Structure: HENDERSON ROAD-TR2
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 101.370,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.2m (102.4ft)

Find on map >>   Show street view

Structure Number: 890047,  Location: NE OF FREEPORT (Lat: 42.320994,  Lng: -89.592700),  Route carried "under" structure: US 20,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 6,850 (year 2021),  Truck Traffic: 20%,  Features Intersected: US20 FREEPORT BYPASS,  Facility Carried by Structure: TOWER ROAD
Minimum Vertical Clearance: 5.99m (19.65ft),  Kilometerpoint: 102.545,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.1m (118.4ft)

Find on map >>   Show street view

Structure Number: 890048,  Location: NE OF FREEPORT (Lat: 42.312733,  Lng: -89.572922),  Route carried "under" structure: State highway 75,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 2,550 (year 2021),  Truck Traffic: 11%,  Features Intersected: IL 75,  Facility Carried by Structure: US 20 EB FREPRT BY
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 6.180,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.5m (136.2ft)

Find on map >>   Show street view

Structure Number: 890049,  Location: 2 MI NE OF FREEPORT (Lat: 42.309061,  Lng: -89.558981),  Route carried "under" structure: US 20,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 7,900 (year 2021),  Truck Traffic: 23%,  Features Intersected: US 20 FREEPORT BYPAS,  Facility Carried by Structure: RIVER ROAD
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 105.876,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 89005,  Location: E OF FREEPORT (Lat: 42.279589,  Lng: -89.542900),  Route carried "under" structure: US 20,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 7,050 (year 2021),  Truck Traffic: 21%,  Features Intersected: US20 FREEPORT BYPASS,  Facility Carried by Structure: SPRINGFIELD RD
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 109.754,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.3m (135.5ft)

Find on map >>   Show street view

Structure Number: 890056,  Location: 1 MI N FREEPORT (Lat: 42.321436,  Lng: -89.632600),  Route carried "under" structure: State highway 26,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 11,700 (year 2021),  Truck Traffic: 4%,  Features Intersected: ILL RT 26,  Facility Carried by Structure: US 20 EB
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 202.579,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.9m (81.7ft)

Find on map >>   Show street view

Structure Number: 890057,  Location: 1 MI N FREEPORT (Lat: 42.321747,  Lng: -89.632606),  Route carried "under" structure: State highway 26,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 11,700 (year 2021),  Truck Traffic: 4%,  Features Intersected: ILL RT 26,  Facility Carried by Structure: US 20 WB
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 202.611,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.9m (81.7ft)

Find on map >>   Show street view

Structure Number: 890061,  Location: .3 MI E SPRINGFLD RD (Lat: 42.277058,  Lng: -89.538781),  Route carried "under" structure: US 20,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 7,050 (year 2021),  Truck Traffic: 21%,  Features Intersected: US20 FREEPORT BYPASS
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 110.414,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 89008,  Location: NE OF FREEPORT (Lat: 42.312469,  Lng: -89.572917),  Route carried "under" structure: State highway 75,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 1,900 (year 2021),  Truck Traffic: 18%,  Features Intersected: IL RT 75,  Facility Carried by Structure: US20WB FREEPORT BY
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 6.148,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.8m (130.6ft)

Find on map >>   Show street view

Structure Number: 8999,  Location: 2 MI W FREEPORT (Lat: 42.318731,  Lng: -89.678589),  Route carried "under" structure: Business US 20,  Year Built: 1935,  Structure Length: 0. m,  Average Daily Traffic: 2,700 (year 2021),  Truck Traffic: 3%,  Features Intersected: US 20 BR,  Facility Carried by Structure: CN RR
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 3.380,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 10.1m (33.1ft)

Find on map >>   Show street view

Structure Number: 899907,  Location: .2 MI S. OF US 20 (Lat: 42.326156,  Lng: -89.719781),  Route carried "under" structure: County highway ,  Year Built: 1901,  Structure Length: 0. m,  Average Daily Traffic: 900 (year 2019),  Truck Traffic: 3%,  Features Intersected: BOLTON RD (FAS78),  Facility Carried by Structure: CN RAILRAOD
Minimum Vertical Clearance: 3.66m (12.01ft),  Kilometerpoint: 0.338,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 7.3m (24.0ft)

Find on map >>   Show street view

Structure Number: 899915,  Location: I MI E OF FREEPORT (Lat: 42.276900,  Lng: -89.572925),  Route carried "under" structure: County highway ,  Year Built: 1922,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 57%,  Features Intersected: YELLOW CREEK RD,  Facility Carried by Structure: CN RR
Minimum Vertical Clearance: 3.71m (12.17ft),  Kilometerpoint: 0.885,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 14.8m (48.6ft)

Discuss Freeport, Illinois (IL) on our hugely popular Illinois forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.