Bridge Statistics for Gainesboro, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 45Number of bridges
  • 499ft / 152mTotal length
  • $26,438,000Total costs
  • 56,481Total average daily traffic
  • 4,516Total average daily truck traffic
  • 90,904Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Gainesboro
  • No street view available for this location

New bridges in Gainesboro, TN - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 21940-1949
  • 51950-1959
  • 71960-1969
  • 81970-1979
  • 151980-1989
  • 41990-1999
  • 12010-2019
Reconstructed bridges in Gainesboro, TN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Gainesboro, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 71.4%Good
  • 14.3%Satisfactory
  • 7.1%Poor
  • 7.1%Imminent failure
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 42.9%Good
  • 42.9%Satisfactory
  • 7.1%Fair
  • 7.1%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 71.4%Good
  • 21.4%Fair
  • 7.1%Imminent failure
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 31.1%Good
  • 48.9%Satisfactory
  • 13.3%Fair
  • 4.4%Poor
  • 2.2%Imminent failure
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 83.9%Good
  • 16.1%Satisfactory
Find on map >>   Show street view

Structure Number: 44011500001,  Location: 3MI SOUTHWEST OF SR56 (Lat: 36.280883,  Lng: -85.661750),  Route carried "on" structure: County highway 1150,  Year Built: 1958,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 306 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 490 (year 2041),  Features Intersected: LONG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.518,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 44011500003,  Location: 4MI SOUTHWEST OF SR56 (Lat: 36.276817,  Lng: -85.658983),  Route carried "on" structure: County highway 1150,  Year Built: 1958,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 306 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 490 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.097,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 44011500005,  Location: 2MI SOUTHWEST OF SR56 (Lat: 36.272783,  Lng: -85.641400),  Route carried "on" structure: County highway 1150,  Year Built: 1957,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 529 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 846 (year 2041),  Design Load: H 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.980,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 44020840009,  Location: .5 MI WEST OF SR53 (Lat: 36.326383,  Lng: -85.715367),  Route carried "on" structure: County highway 2730,  Year Built: 1993,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 94 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 150 (year 2041),  Design Load: HS 20,  Features Intersected: FLYNN CREEK,  Facility Carried by Structure: NFA 2084 (SA 4403)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44022460001,  Location: .3MI EAST OF SR53 (Lat: 36.301917,  Lng: -85.709050),  Route carried "on" structure: County highway 2246,  Year Built: 1984,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 110 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 176 (year 2041),  Design Load: HS 20,  Features Intersected: FLYNNS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 440A1180001,  Location: .01MI. EAST OF SR135 (Lat: 36.362550,  Lng: -85.613633),  Route carried "on" structure: County highway 118,  Year Built: 1990,  Status: Open,  Structure Length: 8.96m (29.40ft),  Average Daily Traffic: 180 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 288 (year 2041),  Design Load: HS 20,  Features Intersected: ROARING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: July 2019,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 440A2120001,  Location: .1MI EAST OF SR56 (Lat: 36.349667,  Lng: -85.658367),  Route carried "on" structure: City street 212,  Year Built: 1965,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,550 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,480 (year 2041),  Design Load: H 20,  Features Intersected: GIBSON HOLLOW BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.079,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 440A2290001,  Location: .11 MI FROM SR56 (Lat: 36.337617,  Lng: -85.655083),  Route carried "on" structure: County highway 421,  Year Built: 1984,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 140 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 224 (year 2041),  Design Load: HS 20,  Features Intersected: DOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.172,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 440A2350001,  Location: 2 MI WEST OF SR 56 (Lat: 36.274883,  Lng: -85.658033),  Route carried "on" structure: County highway 235,  Year Built: 1985,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 150 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 240 (year 2041),  Design Load: H 10,  Features Intersected: FLYNN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 2.4m (7.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 440A2350009,  Location: .41 M FROM FLYNN CREEK RD (Lat: 36.269917,  Lng: -85.657733),  Route carried "on" structure: County highway 235,  Year Built: 1987,  Status: Posted for load,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 50 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 80 (year 2041),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.599,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 29.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $83,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 440A2650001,  Location: 2MI EAST OF SR53 (Lat: 36.294000,  Lng: -85.694400),  Route carried "on" structure: County highway 265,  Year Built: 1984,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 30 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 48 (year 2041),  Design Load: HS 20,  Features Intersected: FLYNN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.163,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 440A2650003,  Location: 2MI EAST OF SR53 (Lat: 36.292983,  Lng: -85.694183),  Route carried "on" structure: County highway 265,  Year Built: 1986,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 30 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 48 (year 2041),  Design Load: HS 20,  Features Intersected: FLYNN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.280,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 440A2650005,  Location: 4MI EAST OF SR53 (Lat: 36.284767,  Lng: -85.681017),  Route carried "on" structure: County highway 265,  Year Built: 1987,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 30 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 48 (year 2041),  Design Load: HS 20,  Features Intersected: FLYNN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.814,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 89.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 440A2680001,  Location: 6MI EAST OF SR53 (Lat: 36.280550,  Lng: -85.679950),  Route carried "on" structure: County highway 268,  Year Built: 1960,  Status: Closed,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 10 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 16 (year 2041),  Design Load: H 10,  Features Intersected: FLYNN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.109,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.5m (14.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Imminent failure,  Superstructure: Imminent failure,  Substructure: Imminent failure,  Channel: Imminent failure,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $271,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 440A2690001,  Location: 7MI EAST OF SR53 (Lat: 36.278417,  Lng: -85.672833),  Route carried "on" structure: County highway 269,  Year Built: 1970,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 40 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 64 (year 2041),  Design Load: H 15,  Features Intersected: FLYNN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $103,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $155,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 440A2830001,  Location: 3MI EAST OF CUMBERLAND RV (Lat: 36.317733,  Lng: -85.714550),  Route carried "on" structure: County highway 283,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 30 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 48 (year 2042),  Features Intersected: FLYNN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 3.3m (10.8ft),  Out-to-Out Width: 3.6m (11.8ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 6.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 5.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $241,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 440A2930001,  Location: 8MI SO WEST OF GAINSBORO (Lat: 36.340033,  Lng: -85.722850),  Route carried "on" structure: County highway 293,  Year Built: 1986,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 180 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 288 (year 2041),  Design Load: HS 20,  Features Intersected: FLYNN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.670,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: July 2019,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 440A2930003,  Location: 3.57 MI FROM SR53 (Lat: 36.339933,  Lng: -85.722217),  Route carried "on" structure: County highway 293,  Year Built: 1985,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 180 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 288 (year 2041),  Design Load: HS 20,  Features Intersected: OVERFLOW OF FLYNN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.724,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 440A3390001,  Location: IN CITY OF GAINSBORO (Lat: 36.354667,  Lng: -85.655217),  Route carried "on" structure: City street 339,  Year Built: 1970,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 270 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 432 (year 2041),  Design Load: H 15,  Features Intersected: DOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.277,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $83,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 440A3530001,  Location: IN CITY OF GAINSBORO (Lat: 36.350250,  Lng: -85.656533),  Route carried "on" structure: City street 353,  Year Built: 1970,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 370 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 592 (year 2041),  Design Load: H 15,  Features Intersected: DOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.264,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 440A3580001,  Location: IN CITY OF GAINSBORO (Lat: 36.372333,  Lng: -85.654883),  Route carried "on" structure: City street 358,  Year Built: 1985,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 430 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 688 (year 2041),  Design Load: HS 20,  Features Intersected: DOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.626,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $455,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $683,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 440A3910001,  Location: 0.01 MI. E OF SR-56 JCT. (Lat: 36.346633,  Lng: -85.657967),  Route carried "on" structure: City street 391,  Year Built: 2016,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2039),  Design Load: HL 93,  Features Intersected: DOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.021,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.1m (10.2ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44F00080001,  Location: IN CITY OF GAINSBORO (Lat: 36.349017,  Lng: -85.657500),  Route carried "on" structure: City street 1171,  Year Built: 1972,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 809 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,294 (year 2041),  Design Load: H 15,  Features Intersected: DOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 44S62930001,  Location: .11MI EAST OF SR53 (Lat: 36.322267,  Lng: -85.710300),  Route carried "on" structure: County highway 1148,  Year Built: 1960,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 169 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 270 (year 2041),  Design Load: H 15,  Features Intersected: SHAKE RAG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 25.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $282,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $424,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 44SR0530001,  Location: IN GRANVILLE (Lat: 36.272233,  Lng: -85.799450),  Route carried "on" structure: State highway 53,  Year Built: 1998,  Status: Open,  Structure Length: 14.42m (47.31ft),  Average Daily Traffic: 543 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 869 (year 2041),  Design Load: HS 20,  Features Intersected: MARTIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.980,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 72.1m (236.5ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: August 2019,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44SR0530003,  Location: 1.5 MI.S.OF FLYNN'S LICK (Lat: 36.306400,  Lng: -85.711900),  Route carried "on" structure: State highway 53,  Year Built: 1935,  Status: Posted for load,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 499 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 816 (year 2040),  Design Load: H 15,  Features Intersected: FLYNN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.617,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.85m (15.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $315,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $473,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 44SR0530005,  Location: NEAR FLYNN'S LICK (Lat: 36.317783,  Lng: -85.712333),  Route carried "on" structure: State highway 53,  Year Built: 1934,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,080 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,728 (year 2041),  Design Load: H 15,  Features Intersected: BUFFALO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.969,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $67,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $101,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 44SR0530007,  Location: IN FLYNN'S LICK (Lat: 36.322183,  Lng: -85.712383),  Route carried "on" structure: State highway 53,  Year Built: 1984,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,080 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,728 (year 2041),  Design Load: HS 20,  Features Intersected: SHAKE RAG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.452,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 44SR0530009,  Location: 1.7 MI.N.OF FLYNN'S LICK (Lat: 36.347533,  Lng: -85.698483),  Route carried "on" structure: State highway 53,  Year Built: 1984,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,080 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,728 (year 2041),  Design Load: HS 20,  Features Intersected: HOPKINS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.993,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 44SR0530011,  Location: 2.2 MI.N.OF FLYNN'S LICK (Lat: 36.349300,  Lng: -85.694733),  Route carried "on" structure: State highway 53,  Year Built: 1984,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,080 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,728 (year 2041),  Design Load: HS 20,  Features Intersected: POORHOUSE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.395,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 14.5m (47.6ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 44SR0530015,  Location: 3 MI. N. OF GAINSBORO (Lat: 36.374133,  Lng: -85.646217),  Route carried "on" structure: State highway 53,  Year Built: 1972,  Status: Posted for load,  Structure Length: 21.34m (70.01ft),  Average Daily Traffic: 3,376 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,920 (year 2040),  Design Load: HS 20,  Features Intersected: ROARING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.299,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 71.6m (234.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 21.66m (71.06ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Underwater Inspection Date: June 2017,  Bridge Improvement Cost: $9,554,000,  Roadway Improvement Cost: $956,000,  Total Project Cost: $14,332,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 44SR0530017,  Location: MI.N.OF GAINESBORO (Lat: 36.396683,  Lng: -85.634683),  Route carried "on" structure: State highway 53,  Year Built: 1978,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 2,323 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,717 (year 2041),  Design Load: HS 20,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.260,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 44SR0530029,  Location: 3.5 MI S OF GAINESBORB TN (Lat: 36.340333,  Lng: -85.701750),  Route carried "on" structure: State highway 53,  Year Built: 1935,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,080 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,728 (year 2041),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.091,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 44SR0560001,  Location: 1.5 MI.S.OF GAINESBORO (Lat: 36.319750,  Lng: -85.655250),  Route carried "on" structure: State highway 56,  Year Built: 1963,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 5,719 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,150 (year 2041),  Design Load: HS 20,  Features Intersected: DOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.438,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 44SR0560003,  Location: 1.1 MI.S.OF GAINESBORO (Lat: 36.323983,  Lng: -85.658033),  Route carried "on" structure: State highway 56,  Year Built: 1963,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 5,719 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,150 (year 2041),  Design Load: HS 20,  Features Intersected: DOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.985,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 44SR0560005,  Location: SOUTH OF GAINESBORO (Lat: 36.333750,  Lng: -85.658167),  Route carried "on" structure: State highway 56,  Year Built: 1963,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 5,719 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,150 (year 2041),  Design Load: HS 20,  Features Intersected: DOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 44SR0560007,  Location: IN GAINESBORO CITY LIMITS (Lat: 36.356267,  Lng: -85.655283),  Route carried "on" structure: State highway 56,  Year Built: 1972,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 5,990 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,584 (year 2041),  Design Load: HS 20,  Features Intersected: DOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.574,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 44SR0560009,  Location: IN GAINESBORO (Lat: 36.372767,  Lng: -85.652283),  Route carried "on" structure: State highway 56,  Year Built: 1994,  Status: Open,  Structure Length: 24.84m (81.50ft),  Average Daily Traffic: 3,197 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,115 (year 2042),  Design Load: HS 20,  Features Intersected: CUMBERLAND RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.671,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Navigation Control: Yes ( Vertical Clearance: 22.2m (72.8ft), Horizontal Clearance: 82.2m (269.7ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 100.6m (330.1ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44SR0560011,  Location: 0.7 MI N OF SR85 (Lat: 36.428117,  Lng: -85.661967),  Route carried "on" structure: State highway 56,  Year Built: 1951,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 991 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,586 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.299,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 44SR0560029,  Location: IN GAINESBORO CITY LIMITS (Lat: 36.349533,  Lng: -85.657517),  Route carried "on" structure: State highway 56,  Year Built: 1972,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 5,990 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,584 (year 2041),  Design Load: H 20,  Features Intersected: GIBSON HOLLOW BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.898,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 44SR0850007,  Location: 1 MI.FROM SR.56 (Lat: 36.419667,  Lng: -85.673267),  Route carried "on" structure: State highway 85,  Year Built: 1981,  Status: Open,  Structure Length: 6.37m (20.90ft),  Average Daily Traffic: 216 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 346 (year 2041),  Design Load: HS 20,  Features Intersected: JENNINGS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.253,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: November 2018,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 44SR0852001,  Location: 3.8 MI.W.OF GAINESBORO (Lat: 36.355817,  Lng: -85.720950),  Route carried "on" structure: State highway 262,  Year Built: 1949,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 1,334 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,134 (year 2041),  Design Load: HS 20,  Features Intersected: BULLARD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.224,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44SR0852003,  Location: 1.5 MI W OF SR85 (Lat: 36.357650,  Lng: -85.697233),  Route carried "on" structure: State highway 262,  Year Built: 1949,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,334 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,134 (year 2041),  Design Load: HS 20,  Features Intersected: TRACE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.670,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: June 2017
Find on map >>   Show street view

Structure Number: 44SR0852005,  Location: 1.35 MI.W.OF GAINSBORO (Lat: 36.361050,  Lng: -85.681100),  Route carried "on" structure: State highway 262,  Year Built: 1959,  Status: Open,  Structure Length: 22.86m (75.00ft),  Average Daily Traffic: 1,685 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,696 (year 2041),  Design Load: HS 20,  Features Intersected: CUMBERLAND RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.167,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Navigation Control: Yes ( Vertical Clearance: 10.3m (33.8ft), Horizontal Clearance: 82.2m (269.7ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 85.3m (279.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 22.86m (75.00ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Underwater Inspection Date: June 2017,  Bridge Improvement Cost: $6,394,000,  Roadway Improvement Cost: $640,000,  Total Project Cost: $9,592,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric