Bridge Statistics for Gainesville, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 75Number of bridges
  • 1,325ft / 404mTotal length
  • $445,882,000Total costs
  • 1,003,560Total average daily traffic
  • 15,892Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Gainesville
  • No street view available for this location

New bridges in Gainesville, GA - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 71950-1959
  • 131960-1969
  • 61970-1979
  • 131980-1989
  • 121990-1999
  • 12000-2009
  • 42010-2019
  • 22020-2022
Average Bridge Daily Traffic in Gainesville, GA
Average Bridge Truck Traffic in Gainesville, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.7%Very good
  • 71.0%Good
  • 16.1%Satisfactory
  • 3.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.1%Very good
  • 77.4%Good
  • 3.2%Satisfactory
  • 3.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.9%Very good
  • 77.4%Good
  • 9.7%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 32.6%Very good
  • 14.0%Good
  • 34.9%Satisfactory
  • 18.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 92.9%Good
  • 3.6%Satisfactory
  • 3.6%Fair
Find on map >>   Show street view

Structure Number: 1390002,  Location: IN SE GAINESVILLE (Lat: 34.285289,  Lng: -83.805839),  Route carried "on" structure: US 129,  Year Built: 1968,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 33,120 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 49,680 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 419 (I-985 US 23)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 43.0m (141.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,020,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,530,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390003,  Location: IN SE GAINESVILLE (Lat: 34.285128,  Lng: -83.805889),  Route carried "on" structure: US 129,  Year Built: 1968,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 33,120 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 49,680 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 419 (I-985 US 23)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 43.0m (141.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,020,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,530,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390004,  Location: IN SE GAINESVILLE (Lat: 34.292578,  Lng: -83.814789),  Route carried "on" structure: US 129,  Year Built: 1969,  Status: Open,  Structure Length: 10.45m (34.28ft),  Average Daily Traffic: 30,420 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 45,630 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NOR SOUTHERN RR- SCL RR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 39 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,071,000,  Roadway Improvement Cost: $207,000,  Total Project Cost: $3,107,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 139002,  Location: IN NW GAINESVILLE (Lat: 34.322319,  Lng: -83.879947),  Route carried "on" structure: State highway 53,  Year Built: 1956,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 37.06m (121.59ft),  Average Daily Traffic: 23,520 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 35,280 (year 2032),  Design Load: HS 20,  Features Intersected: CHATT RIV (LAKE LANIER)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 4,  Length of Maximum Span: 79.2m (259.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $4,751,000,  Roadway Improvement Cost: $475,000,  Total Project Cost: $7,127,000,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1390024,  Location: IN GAINESVILLE CITY LIMIT (Lat: 34.282461,  Lng: -83.824706),  Route carried "on" structure: Ramp State highway 53,  Year Built: 1971,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 20,010 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 30,015 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: FLAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Fair,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $254,000
Find on map >>   Show street view

Structure Number: 1390025,  Location: IN GAINESVILLE CITY LIMIT (Lat: 34.283708,  Lng: -83.825119),  Route carried "on" structure: Ramp State highway 53,  Year Built: 1971,  Status: Open,  Structure Length: 21.00m (68.90ft),  Average Daily Traffic: 20,010 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 30,015 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NOR SOUTHERN RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 19 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,160,000,  Roadway Improvement Cost: $416,000,  Total Project Cost: $6,241,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390026,  Location: IN NORTH GAINESVILLE (Lat: 34.342608,  Lng: -83.849519),  Route carried "on" structure: State highway 60,  Year Built: 1956,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 34.81m (114.21ft),  Average Daily Traffic: 32,000 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 36,270 (year 2032),  Design Load: HS 20,  Features Intersected: CHATT RIV (LAKE LANIER)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 67.4m (221.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $4,462,000,  Roadway Improvement Cost: $446,000,  Total Project Cost: $6,693,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390027,  Location: 6.7 MI NW OF GAINESVILLE (Lat: 34.386519,  Lng: -83.874219),  Route carried "on" structure: State highway 60,  Year Built: 1949,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 10,480 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 15,720 (year 2032),  Design Load: H 15,  Features Intersected: SQUIRREL CREEK,  Facility Carried by Structure: THOMPSON BR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1390033,  Location: 6.6 MI N OF GAINESVILLE (Lat: 34.389569,  Lng: -83.859519),  Route carried "on" structure: State highway 283,  Year Built: 1957,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 7,200 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,800 (year 2032),  Design Load: H 20,  Features Intersected: WAHOO CR (LAKE LANIER)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $969,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,453,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 139004,  Location: 1.7 MI SW OF CANDLER (Lat: 34.197497,  Lng: -83.806150),  Route carried "on" structure: State highway 332,  Year Built: 1963,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 4,850 (year 2012),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,275 (year 2032),  Design Load: H 15,  Features Intersected: WALNUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.91m (35.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $574,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $862,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390047,  Location: IN GAINESVILLE CITY LIMIT (Lat: 34.268189,  Lng: -83.818889),  Route carried "on" structure: Interstate 985,  Year Built: 1967,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 46,750 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 70,125 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 53 CONNECTOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.187,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,193,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,790,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390048,  Location: IN SOUTH GAINESVILLE (Lat: 34.268408,  Lng: -83.819050),  Route carried "on" structure: Interstate 985,  Year Built: 1967,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 46,750 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 70,125 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 53 CONNECTOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.187,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,193,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,790,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390049,  Location: IN GAINESVILLE CITY LIMIT (Lat: 34.269278,  Lng: -83.817739),  Route carried "on" structure: Interstate 985,  Year Built: 1968,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 46,750 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 70,125 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CR 719- CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.187,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $848,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $1,272,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 139005,  Location: IN GAINESVILLE CITY LIMIT (Lat: 34.269508,  Lng: -83.817878),  Route carried "on" structure: Interstate 985,  Year Built: 1968,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 46,750 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 70,125 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CR 719- CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.187,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $848,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $1,272,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1390051,  Location: IN GAINESVILLE CITY LIMIT (Lat: 34.316278,  Lng: -83.788489),  Route carried "on" structure: Interstate 985,  Year Built: 1980,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 31,040 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 46,560 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 369
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.624,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $899,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $1,348,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1390052,  Location: IN GAINESVILLE CITY LIMIT (Lat: 34.316228,  Lng: -83.788747),  Route carried "on" structure: Interstate 985,  Year Built: 1980,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 29,360 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 44,040 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 369
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.624,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $899,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $1,348,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390058,  Location: IN SE GAINESVILLE (Lat: 34.289708,  Lng: -83.802169),  Route carried "on" structure: County highway 751,  Year Built: 1967,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 9,020 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,530 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 419 (I-985 US 23),  Facility Carried by Structure: ATHENS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.09m (49.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,110,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,664,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 139006,  Location: 4.9 MI N OF FLOWERY BR (Lat: 34.250278,  Lng: -83.892739),  Route carried "on" structure: County highway 1293,  Year Built: 1961,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 8,660 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,990 (year 2032),  Design Load: H 15,  Features Intersected: BALUS CREEK,  Facility Carried by Structure: McEVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 1390061,  Location: IN SW GAINESVILLE (Lat: 34.281408,  Lng: -83.832478),  Route carried "on" structure: County highway 2418,  Year Built: 1950,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,550 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,825 (year 2032),  Design Load: H 15,  Features Intersected: FLAT CREEK,  Facility Carried by Structure: DORSEY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1390062,  Location: IN GAINESVILLE CITY LIMIT (Lat: 34.310458,  Lng: -83.788128),  Route carried "on" structure: County highway 2423,  Year Built: 1967,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 1,460 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,190 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 419 (I-985 US 23),  Facility Carried by Structure: CORNELIA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 46.0m (150.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.87m (48.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,067,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $1,600,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390063,  Location: 5 MI NE OF GAINESVILLE (Lat: 34.340458,  Lng: -83.754669),  Route carried "on" structure: County highway 2595,  Year Built: 1951,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 830 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,245 (year 2032),  Design Load: H 15,  Features Intersected: NORTH OCONEE RIVER,  Facility Carried by Structure: WHITE-SULPHUR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $270,000
Find on map >>   Show street view

Structure Number: 1390064,  Location: 4.9 MI NE OF GAINESVILLE (Lat: 34.332678,  Lng: -83.750508),  Route carried "on" structure: County highway 2680,  Year Built: 1954,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 3,880 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,820 (year 2032),  Design Load: H 15,  Features Intersected: NORTH OCONEE RIVER,  Facility Carried by Structure: OLD CORNELIA HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.27m (33.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $738,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1390066,  Location: 5.3 MI E OF GAINESVILLE (Lat: 34.309939,  Lng: -83.732628),  Route carried "on" structure: County highway 2686,  Year Built: 1955,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,470 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,705 (year 2032),  Design Load: H 15,  Features Intersected: CEDAR CREEK,  Facility Carried by Structure: JOE CHANDLER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1390072,  Location: 2 MI S OF CLERMONT (Lat: 34.449150,  Lng: -83.764678),  Route carried "on" structure: State highway 52,  Year Built: 1987,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 2,040 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,060 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: FLAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $264,000
Find on map >>   Show street view

Structure Number: 1390074,  Location: IN EAST GAINESVILLE (Lat: 34.326308,  Lng: -83.804808),  Route carried "on" structure: US 129,  Year Built: 1990,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 16,150 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 24,225 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LIMESTONE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $181,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $272,000
Find on map >>   Show street view

Structure Number: 1390075,  Location: IN NORTH GAINESVILLE (Lat: 34.342528,  Lng: -83.849647),  Route carried "on" structure: State highway 60,  Year Built: 1992,  Status: Open,  Structure Length: 34.75m (114.01ft),  Average Daily Traffic: 24,180 (year 2012),  Truck Traffic: 4%,  Average Future Daily Traffic: 36,270 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CHATTAHOOCHEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 67.1m (220.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $4,454,000,  Roadway Improvement Cost: $445,000,  Total Project Cost: $6,681,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390076,  Location: IN NW GAINESVILLE (Lat: 34.322139,  Lng: -83.880089),  Route carried "on" structure: State highway 53,  Year Built: 1992,  Status: Open,  Structure Length: 35.84m (117.59ft),  Average Daily Traffic: 23,520 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 35,280 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CHATTAHOOCHEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 79.2m (259.8ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $4,595,000,  Roadway Improvement Cost: $459,000,  Total Project Cost: $6,892,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1395009,  Location: 5.2 MI SW OF CLERMONT (Lat: 34.404558,  Lng: -83.796808),  Route carried "on" structure: County highway 65,  Year Built: 1968,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: EAST FORK LITTLE RIVER,  Facility Carried by Structure: NOPONE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 1395016,  Location: 2.3 MI SW OF GAINESVILLE (Lat: 34.271658,  Lng: -83.848689),  Route carried "on" structure: County highway 345,  Year Built: 1979,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,940 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,910 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: FLAT CREEK,  Facility Carried by Structure: DIXIE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $158,000
Find on map >>   Show street view

Structure Number: 1395017,  Location: IN SW GAINESVILLE (Lat: 34.269050,  Lng: -83.868358),  Route carried "on" structure: County highway 442,  Year Built: 1978,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 1,570 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,355 (year 2032),  Design Load: H 15,  Features Intersected: FLAT CREEK,  Facility Carried by Structure: OLD FLOWERY BR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $375,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1395018,  Location: 2.6 MI SE OF GAINESVILLE (Lat: 34.266708,  Lng: -83.855750),  Route carried "on" structure: County highway 2432,  Year Built: 1974,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 7,620 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,430 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: FLAT CREEK,  Facility Carried by Structure: MEMORIAL PARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1395025,  Location: 4.3 MI SE OF OAKWOOD (Lat: 34.193300,  Lng: -83.821769),  Route carried "on" structure: County highway 687,  Year Built: 1988,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 70 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 105 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CANEY CREEK,  Facility Carried by Structure: E. REED ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $158,000
Find on map >>   Show street view

Structure Number: 1395028,  Location: .9 MI NE OF CANDLER (Lat: 34.218989,  Lng: -83.769528),  Route carried "on" structure: County highway 756,  Year Built: 1994,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ALLEN CREEK,  Facility Carried by Structure: BAKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000
Find on map >>   Show street view

Structure Number: 1395032,  Location: 4 MI NE OF CANDLER (Lat: 34.244547,  Lng: -83.729469),  Route carried "on" structure: County highway 778,  Year Built: 1991,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: POND FORK CREEK,  Facility Carried by Structure: GREGGS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 1395033,  Location: 3 MI NE OF CANDLER (Lat: 34.245469,  Lng: -83.735450),  Route carried "on" structure: County highway 779,  Year Built: 1988,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: POND FORK CREEK,  Facility Carried by Structure: BARRETT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 1395034,  Location: 4.8 MI NE OF CANDLER (Lat: 34.253050,  Lng: -83.715697),  Route carried "on" structure: County highway 787,  Year Built: 1988,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: EAST FORK POND CREEK,  Facility Carried by Structure: COKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 139504,  Location: 5 MI E OF GAINESVILLE (Lat: 34.298758,  Lng: -83.741319),  Route carried "on" structure: County highway 809,  Year Built: 1986,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NORTH OCONEE RIVER,  Facility Carried by Structure: BROOME ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $264,000
Find on map >>   Show street view

Structure Number: 1395041,  Location: 6 MI E OF GAINESVILLE (Lat: 34.289828,  Lng: -83.725269),  Route carried "on" structure: County highway 810,  Year Built: 1966,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 15,  Features Intersected: NORTH OCONEE RIVER,  Facility Carried by Structure: EAST HALL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $598,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $897,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1395044,  Location: 6 MI E OF GAINESVILLE (Lat: 34.295969,  Lng: -83.724308),  Route carried "on" structure: County highway 814,  Year Built: 1984,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CEDAR CREEK,  Facility Carried by Structure: CEDAR CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Fair,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 1395045,  Location: 6 MI E OF GAINESVILLE (Lat: 34.288200,  Lng: -83.725639),  Route carried "on" structure: County highway 817,  Year Built: 1986,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: N OCONEE RIVER TRIB,  Facility Carried by Structure: GAINES MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $158,000
Find on map >>   Show street view

Structure Number: 139505,  Location: 1 MI NE OF GAINESVILLE (Lat: 34.334200,  Lng: -83.802139),  Route carried "on" structure: County highway 893,  Year Built: 1991,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 1,570 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,355 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BRENAU CREEK,  Facility Carried by Structure: PINE VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $821,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1395051,  Location: 5 MI NE OF GAINESVILLE (Lat: 34.334458,  Lng: -83.750958),  Route carried "on" structure: County highway 920,  Year Built: 1986,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NORTH OCONEE RIVER,  Facility Carried by Structure: OCONEE CIRCLE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $215,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $322,000
Discuss Gainesville, Georgia (GA) on our hugely popular Georgia forum.