Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Geneseo, Illinois (IL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 49Number of bridges
  • 469ft / 143mTotal length
  • $3,427,000Total costs
  • 208,325Total average daily traffic
  • 76,349Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Geneseo
  • No street view available for this location

New bridges in Geneseo, IL - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 31930-1939
  • 11940-1949
  • 141960-1969
  • 101980-1989
  • 91990-1999
  • 62000-2009
  • 32010-2019
  • 12020-2022
Reconstructed bridges in Geneseo, IL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31990-1999
  • 12000-2009
Average Bridge Daily Traffic in Geneseo, IL
Average Bridge Truck Traffic in Geneseo, IL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.8%Excellent
  • 30.6%Very good
  • 16.7%Good
  • 30.6%Satisfactory
  • 13.9%Fair
  • 5.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 2.8%Excellent
  • 36.1%Very good
  • 19.4%Good
  • 27.8%Satisfactory
  • 5.6%Fair
  • 8.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.8%Excellent
  • 38.9%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 5.6%Fair
  • 2.8%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.6%Excellent
  • 36.1%Very good
  • 22.2%Good
  • 16.7%Satisfactory
  • 8.3%Fair
  • 8.3%Poor
  • 2.8%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Very good
  • 16.7%Good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: 376002,  Location: NW CORNER OF GENESEO (Lat: 41.460333,  Lng: -90.167514),  Route carried "on" structure: City street ,  Year Built: 1938,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 550 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,700 (year 2040),  Design Load: H 15,  Features Intersected: GENESEO CREEK,  Facility Carried by Structure: W ELK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 376003,  Location: SO CENTER OF GENESEO (Lat: 41.439464,  Lng: -90.155864),  Route carried "on" structure: Other road ,  Year Built: 1982,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 3,050 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,500 (year 2040),  Design Load: HS 20,  Features Intersected: GENESEO CREEK,  Facility Carried by Structure: SO STATE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.494,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2018,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 376004,  Location: SO CENTER OF GENESEO (Lat: 41.437886,  Lng: -90.155778),  Route carried "on" structure: Other road ,  Year Built: 1985,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 2.63m (8.63ft),  Average Daily Traffic: 2,700 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,800 (year 2040),  Design Load: HS 20,  Features Intersected: GENESEO CREEK,  Facility Carried by Structure: SOUTH STATE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.671,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 37011,  Location: 4.0 MI W JCT ILL 82 (Lat: 41.440469,  Lng: -90.231100),  Route carried "under" structure: Interstate 80,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 20,400 (year 2021),  Truck Traffic: 45%,  Features Intersected: FAI 80,  Facility Carried by Structure: CAMBRIDGE RD/FAS23
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 24.687,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 20.6m (67.6ft)

Find on map >>   Show street view

Structure Number: 370111,  Location: 1.0 MI W OF GENESEO (Lat: 41.440625,  Lng: -90.182247),  Route carried "under" structure: Interstate 80,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 20,400 (year 2021),  Truck Traffic: 45%,  Features Intersected: FAI 80,  Facility Carried by Structure: TR 172
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 28.774,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 370112,  Location: .34 MI E GENESEO (Lat: 41.422611,  Lng: -90.144319),  Route carried "under" structure: Interstate 80,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 18,000 (year 2021),  Truck Traffic: 50%,  Features Intersected: FAI 80,  Facility Carried by Structure: TR 196-D
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 32.588,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 370113,  Location: 2.5 MI SE OF GENESEO (Lat: 41.415311,  Lng: -90.124981),  Route carried "under" structure: Interstate 80,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 18,000 (year 2021),  Truck Traffic: 50%,  Features Intersected: FAI 80,  Facility Carried by Structure: TR 216
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 34.423,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 370169,  Location: S EDGE GENESEO (Lat: 41.430350,  Lng: -90.157781),  Route carried "under" structure: State highway 82,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 2,300 (year 2021),  Truck Traffic: 10%,  Features Intersected: FAP 638/IL 82,  Facility Carried by Structure: FAI 80 EB
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 31.397,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.4m (96.5ft)

Find on map >>   Show street view

Structure Number: 37017,  Location: S EDGE GENESEO (Lat: 41.430489,  Lng: -90.157794),  Route carried "under" structure: State highway 82,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 8,350 (year 2021),  Truck Traffic: 4%,  Features Intersected: FAP 638/IL 82,  Facility Carried by Structure: FAI 80 WB
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 31.414,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.4m (96.5ft)

Find on map >>   Show street view

Structure Number: 379907,  Location: .5 MI N JCT US 6 (Lat: 41.454569,  Lng: -90.158431),  Route carried "under" structure: State highway 82,  Year Built: 1941,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2021),  Truck Traffic: 3%,  Features Intersected: ILL 82,  Facility Carried by Structure: IAIS RR
Minimum Vertical Clearance: 3.10m (10.17ft),  Kilometerpoint: 34.729,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 7.0m (23.0ft)

Discuss Geneseo, Illinois (IL) on our hugely popular Illinois forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.