Bridge Statistics for Greensburg, Indiana (IN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- New bridges - historical statistics
- 8Before 1900
- 11910-1919
- 31920-1929
- 21930-1939
- 11940-1949
- 11950-1959
- 261960-1969
- 91970-1979
- 31980-1989
- 111990-1999
- 192000-2009
- 92010-2019
- 12020-2022
- Reconstructed bridges - Historical Statistics
- 31980-1989
- 81990-1999
- 32000-2009
- 32010-2019
- Bridge Condition - Deck
- 6.8%Very good
- 37.3%Good
- 44.1%Satisfactory
- 10.2%Fair
- 1.7%Poor
- Bridge Condition - Superstructure
- 1.5%Excellent
- 12.3%Very good
- 33.8%Good
- 29.2%Satisfactory
- 21.5%Fair
- 1.5%Poor
- Bridge Condition - Substructure
- 9.2%Very good
- 43.1%Good
- 26.2%Satisfactory
- 16.9%Fair
- 4.6%Poor
- Bridge Condition - Channel
- 1.5%Excellent
- 7.4%Very good
- 32.4%Good
- 41.2%Satisfactory
- 17.6%Fair
- Bridge Condition - Culverts
- 9.1%Excellent
- 18.2%Very good
- 45.5%Good
- 27.3%Satisfactory
Find on map >> Show street view
Structure Number: 76514, Location: 01.20 W US 421 (Lat: 39.373839, Lng: -85.533081), Route carried "under" structure: Interstate 74, Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 10,341 (year 2004), Truck Traffic: 10%, Features Intersected: I-74 EB, Facility Carried by Structure: CR 250 N
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 12.311, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 44.2m (145.0ft)
Structure Number: 76514, Location: 01.20 W US 421 (Lat: 39.373839, Lng: -85.533081), Route carried "under" structure: Interstate 74, Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 10,341 (year 2004), Truck Traffic: 10%, Features Intersected: I-74 EB, Facility Carried by Structure: CR 250 N
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 12.311, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 44.2m (145.0ft)
Find on map >> Show street view
Structure Number: 76514, Location: 01.20 W US 421 (Lat: 39.373839, Lng: -85.533081), Route carried "under" structure: City street , Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 1,728 (year 2008), Truck Traffic: 10%, Features Intersected: MICHIGAN RD, Facility Carried by Structure: CR 250 N
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 12.311, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 44.2m (145.0ft)
Structure Number: 76514, Location: 01.20 W US 421 (Lat: 39.373839, Lng: -85.533081), Route carried "under" structure: City street , Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 1,728 (year 2008), Truck Traffic: 10%, Features Intersected: MICHIGAN RD, Facility Carried by Structure: CR 250 N
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 12.311, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 44.2m (145.0ft)
Find on map >> Show street view
Structure Number: 76514, Location: 01.20 W US 421 (Lat: 39.373839, Lng: -85.533081), Route carried "under" structure: Interstate 74, Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 10,341 (year 2004), Truck Traffic: 10%, Features Intersected: I-74 WB, Facility Carried by Structure: CR 250 N
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 12.311, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 44.2m (145.0ft)
Structure Number: 76514, Location: 01.20 W US 421 (Lat: 39.373839, Lng: -85.533081), Route carried "under" structure: Interstate 74, Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 10,341 (year 2004), Truck Traffic: 10%, Features Intersected: I-74 WB, Facility Carried by Structure: CR 250 N
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 12.311, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 44.2m (145.0ft)
Find on map >> Show street view
Structure Number: 7659, Location: 01.42 N SR 3 (Lat: 39.363339, Lng: -85.514472), Route carried "under" structure: Interstate 74, Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 10,341 (year 2004), Truck Traffic: 10%, Features Intersected: US 421 SB
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 212.401, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 47.7m (156.5ft)
Structure Number: 7659, Location: 01.42 N SR 3 (Lat: 39.363339, Lng: -85.514472), Route carried "under" structure: Interstate 74, Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 10,341 (year 2004), Truck Traffic: 10%, Features Intersected: US 421 SB
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 212.401, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 47.7m (156.5ft)
Find on map >> Show street view
Structure Number: 7659, Location: 01.42 N SR 3 (Lat: 39.363339, Lng: -85.514472), Route carried "under" structure: Interstate 74, Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 10,341 (year 2004), Truck Traffic: 10%, Features Intersected: US 421 SB
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 212.401, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 47.7m (156.5ft)
Structure Number: 7659, Location: 01.42 N SR 3 (Lat: 39.363339, Lng: -85.514472), Route carried "under" structure: Interstate 74, Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 10,341 (year 2004), Truck Traffic: 10%, Features Intersected: US 421 SB
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 212.401, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 47.7m (156.5ft)
Find on map >> Show street view
Structure Number: 76592, Location: 01.42 N SR 3 (Lat: 39.363250, Lng: -85.514153), Route carried "under" structure: Interstate 74, Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 10,341 (year 2004), Truck Traffic: 5%, Features Intersected: US 421 NB
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 212.417, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 47.7m (156.5ft)
Structure Number: 76592, Location: 01.42 N SR 3 (Lat: 39.363250, Lng: -85.514153), Route carried "under" structure: Interstate 74, Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 10,341 (year 2004), Truck Traffic: 5%, Features Intersected: US 421 NB
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 212.417, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 47.7m (156.5ft)
Find on map >> Show street view
Structure Number: 76592, Location: 01.42 N SR 3 (Lat: 39.363250, Lng: -85.514153), Route carried "under" structure: Interstate 74, Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 10,341 (year 2004), Truck Traffic: 5%, Features Intersected: US 421 NB
Minimum Vertical Clearance: 5.69m (18.67ft), Kilometerpoint: 212.417, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 47.7m (156.5ft)
Structure Number: 76592, Location: 01.42 N SR 3 (Lat: 39.363250, Lng: -85.514153), Route carried "under" structure: Interstate 74, Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 10,341 (year 2004), Truck Traffic: 5%, Features Intersected: US 421 NB
Minimum Vertical Clearance: 5.69m (18.67ft), Kilometerpoint: 212.417, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Tee Beam, Length of Maximum Span: 47.7m (156.5ft)