Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Greensburg, Indiana (IN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 94Number of bridges
  • 797ft / 243mTotal length
  • $3,106,000Total costs
  • 336,599Total average daily traffic
  • 36,253Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Greensburg
  • No street view available for this location

New bridges in Greensburg, IN - historical statistics
  • New bridges - historical statistics
  • 8Before 1900
  • 11910-1919
  • 31920-1929
  • 21930-1939
  • 11940-1949
  • 11950-1959
  • 261960-1969
  • 91970-1979
  • 31980-1989
  • 111990-1999
  • 192000-2009
  • 92010-2019
  • 12020-2022
Reconstructed bridges in Greensburg, IN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 81990-1999
  • 32000-2009
  • 32010-2019
Average Bridge Daily Traffic in Greensburg, IN
Average Bridge Truck Traffic in Greensburg, IN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.8%Very good
  • 37.3%Good
  • 44.1%Satisfactory
  • 10.2%Fair
  • 1.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 1.5%Excellent
  • 12.3%Very good
  • 33.8%Good
  • 29.2%Satisfactory
  • 21.5%Fair
  • 1.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.2%Very good
  • 43.1%Good
  • 26.2%Satisfactory
  • 16.9%Fair
  • 4.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.5%Excellent
  • 7.4%Very good
  • 32.4%Good
  • 41.2%Satisfactory
  • 17.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.1%Excellent
  • 18.2%Very good
  • 45.5%Good
  • 27.3%Satisfactory
Find on map >>   Show street view

Structure Number: 76514,  Location: 01.20 W US 421 (Lat: 39.373839,  Lng: -85.533081),  Route carried "under" structure: Interstate 74,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 10,341 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-74 EB,  Facility Carried by Structure: CR 250 N
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 12.311,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: 76514,  Location: 01.20 W US 421 (Lat: 39.373839,  Lng: -85.533081),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 1,728 (year 2008),  Truck Traffic: 10%,  Features Intersected: MICHIGAN RD,  Facility Carried by Structure: CR 250 N
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 12.311,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: 76514,  Location: 01.20 W US 421 (Lat: 39.373839,  Lng: -85.533081),  Route carried "under" structure: Interstate 74,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 10,341 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-74 WB,  Facility Carried by Structure: CR 250 N
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 12.311,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: 7659,  Location: 01.42 N SR 3 (Lat: 39.363339,  Lng: -85.514472),  Route carried "under" structure: Interstate 74,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 10,341 (year 2004),  Truck Traffic: 10%,  Features Intersected: US 421 SB
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 212.401,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 47.7m (156.5ft)

Find on map >>   Show street view

Structure Number: 7659,  Location: 01.42 N SR 3 (Lat: 39.363339,  Lng: -85.514472),  Route carried "under" structure: Interstate 74,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 10,341 (year 2004),  Truck Traffic: 10%,  Features Intersected: US 421 SB
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 212.401,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 47.7m (156.5ft)

Find on map >>   Show street view

Structure Number: 76592,  Location: 01.42 N SR 3 (Lat: 39.363250,  Lng: -85.514153),  Route carried "under" structure: Interstate 74,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 10,341 (year 2004),  Truck Traffic: 5%,  Features Intersected: US 421 NB
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 212.417,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 47.7m (156.5ft)

Find on map >>   Show street view

Structure Number: 76592,  Location: 01.42 N SR 3 (Lat: 39.363250,  Lng: -85.514153),  Route carried "under" structure: Interstate 74,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 10,341 (year 2004),  Truck Traffic: 5%,  Features Intersected: US 421 NB
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 212.417,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 47.7m (156.5ft)

Discuss Greensburg, Indiana (IN) on our hugely popular Indiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.