Bridge Statistics for Grove City, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 68Number of bridges
  • 525ft / 160mTotal length
  • $10,347,000Total costs
  • 393,187Total average daily traffic
  • 114,281Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Grove City
  • No street view available for this location

New bridges in Grove City, PA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11910-1919
  • 21920-1929
  • 11930-1939
  • 61950-1959
  • 311960-1969
  • 21970-1979
  • 61980-1989
  • 61990-1999
  • 82000-2009
  • 42010-2019
Reconstructed bridges in Grove City, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 31980-1989
  • 21990-1999
  • 92000-2009
Average Bridge Daily Traffic in Grove City, PA
Average Bridge Truck Traffic in Grove City, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.5%Excellent
  • 9.1%Very good
  • 38.6%Good
  • 20.5%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.5%Excellent
  • 22.7%Very good
  • 27.3%Good
  • 11.4%Satisfactory
  • 27.3%Fair
  • 6.8%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.8%Excellent
  • 11.4%Very good
  • 29.5%Good
  • 22.7%Satisfactory
  • 25.0%Fair
  • 4.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 34.2%Very good
  • 36.8%Good
  • 15.8%Satisfactory
  • 10.5%Fair
  • 2.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 75.0%Good
Find on map >>   Show street view

Structure Number: 40555,  Location: PINE TOWNSHIP (Lat: 41.195514,  Lng: -80.124953),  Route carried "on" structure: Interstate 80,  Year Built: 1999,  Status: Open,  Structure Length: 11.55m (37.89ft),  Average Daily Traffic: 13,333 (year 2021),  Truck Traffic: 46%,  Average Future Daily Traffic: 16,630 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OVER SR 2007,T-439 & RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.849,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.50m (41.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40969,  Location: UBER ROAD,FINDLEY TWP. (Lat: 41.186469,  Lng: -80.163542),  Route carried "on" structure: City street 7206,  Year Built: 2000,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 47 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 70 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: OVER PINE RUN,  Facility Carried by Structure: BRIDGE 2629,T-944
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 42413,  Location: GROVE CITY BOROUGH (Lat: 41.167089,  Lng: -80.079781),  Route carried "on" structure: State highway 208,  Year Built: 2004,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 3,053 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,000 (year 2032),  Design Load: HL 93,  Features Intersected: OVER WOLF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.750,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44246,  Location: SPRINGFIELD TOWNSHIP (Lat: 41.143333,  Lng: -80.151667),  Route carried "on" structure: State highway 208,  Year Built: 2007,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 12,928 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,430 (year 2032),  Design Load: HL 93,  Features Intersected: OVER I-79,NB/SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.269,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.1m (88.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 27.0m (88.6ft),  Out-to-Out Width: 27.9m (91.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44254,  Location: _CHESTNUT STREET, GROVE C (Lat: 41.163528,  Lng: -80.080447),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Open,  Structure Length: 9.30m (30.51ft),  Average Daily Traffic: 1,505 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,110 (year 2039),  Design Load: HL 93,  Features Intersected: OVER WOLF CREEK,  Facility Carried by Structure: BRIDGE 3116
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44283,  Location: PINE TOWNSHIP (Lat: 41.127889,  Lng: -80.096633),  Route carried "on" structure: State highway ,  Year Built: 2007,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 2,813 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,172 (year 2032),  Design Load: HL 93,  Features Intersected: LAKE BARMORE OUTLET,  Facility Carried by Structure: SR 2025,N.LIBERTY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.019,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019
Find on map >>   Show street view

Structure Number: 44958,  Location: DIAMOND ROAD, PINE TWP (Lat: 41.186472,  Lng: -80.053925),  Route carried "on" structure: City street ,  Year Built: 2008,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 247 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 350 (year 2036),  Design Load: HL 93,  Features Intersected: BR. WOLF CREEK,  Facility Carried by Structure: BRIDGE 3108, T-878
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 45924,  Location: LIBERTY TOWNSHIP (Lat: 41.123475,  Lng: -80.125036),  Route carried "on" structure: State highway 258,  Year Built: 2010,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 2,979 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,905 (year 2032),  Design Load: HL 93,  Features Intersected: BLACK RUN,  Facility Carried by Structure: BUTLER PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.597,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 46042,  Location: LIBERTY TWP (Lat: 41.115508,  Lng: -80.117753),  Route carried "on" structure: State highway 258,  Year Built: 2010,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 2,979 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,905 (year 2032),  Design Load: HL 93,  Features Intersected: OVER TINKERS RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.522,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48757,  Location: PINE TWP (Lat: 41.134936,  Lng: -80.075800),  Route carried "on" structure: State highway 173,  Year Built: 2014,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 3,909 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,576 (year 2032),  Design Load: HL 93,  Features Intersected: SWAMP RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.395,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52699,  Location: PINE TOWNSHIP (Lat: 41.192061,  Lng: -80.121825),  Route carried "on" structure: State highway ,  Year Built: 2015,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 1,708 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,453 (year 2032),  Design Load: HL 93,  Features Intersected: OVER B.&L.E. R.R.,  Facility Carried by Structure: SR2005IRISHTOWN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.038,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.6m (143.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22383,  Location: PLAIN GROVE TWP O/I79 (Lat: 41.107558,  Lng: -80.145169),  Route carried "under" structure: Interstate 79,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 11,309 (year 2021),  Truck Traffic: 26%,  Features Intersected: I-79,  Facility Carried by Structure: BRENT NORTH LIB RD
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 8.129,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 22383,  Location: PLAIN GROVE TWP O/I79 (Lat: 41.107558,  Lng: -80.145169),  Route carried "under" structure: Interstate 79,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 11,625 (year 2021),  Truck Traffic: 21%,  Features Intersected: I-79,  Facility Carried by Structure: BRENT NORTH LIB RD
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 8.093,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 25678,  Location: FINDLEY TOWNSHIP (Lat: 41.200000,  Lng: -80.156667),  Route carried "under" structure: Interstate 79,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 9,615 (year 2021),  Truck Traffic: 19%,  Features Intersected: OVER SR 79 NB / SB,  Facility Carried by Structure: SR 58,GROVE CITY
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 9.069,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 25678,  Location: FINDLEY TOWNSHIP (Lat: 41.200000,  Lng: -80.156667),  Route carried "under" structure: Interstate 79,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 9,619 (year 2021),  Truck Traffic: 20%,  Features Intersected: OVER SR 79 NB / SB,  Facility Carried by Structure: SR 58,GROVE CITY
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 9.064,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 25737,  Location: FINDLEY TOWNSHIP (Lat: 41.198042,  Lng: -80.159789),  Route carried "under" structure: Interstate 80,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 13,373 (year 2021),  Truck Traffic: 48%,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 79,NB
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 30.584,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 25737,  Location: FINDLEY TOWNSHIP (Lat: 41.198042,  Lng: -80.159789),  Route carried "under" structure: Interstate 80,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 13,333 (year 2021),  Truck Traffic: 46%,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 79,NB
Minimum Vertical Clearance: 5.22m (17.13ft),  Kilometerpoint: 30.579,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 25739,  Location: FINDLEY TOWNSHIP (Lat: 41.198197,  Lng: -80.160158),  Route carried "under" structure: Interstate 80,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 13,373 (year 2021),  Truck Traffic: 48%,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 79,SB
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 30.584,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 25739,  Location: FINDLEY TOWNSHIP (Lat: 41.198197,  Lng: -80.160158),  Route carried "under" structure: Interstate 80,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 13,333 (year 2021),  Truck Traffic: 46%,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 79,SB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 30.579,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 25802,  Location: FINDLEY TOWNSHIP (Lat: 41.198097,  Lng: -80.147383),  Route carried "under" structure: Interstate 80,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 13,373 (year 2021),  Truck Traffic: 48%,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 2101,HARTWICK R
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 31.408,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 25802,  Location: FINDLEY TOWNSHIP (Lat: 41.198097,  Lng: -80.147383),  Route carried "under" structure: Interstate 80,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 13,333 (year 2021),  Truck Traffic: 46%,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 2101,HARTWICK R
Minimum Vertical Clearance: 5.62m (18.44ft),  Kilometerpoint: 31.373,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 25808,  Location: WOLF CREEK TOWNSHIP (Lat: 41.201628,  Lng: -80.074608),  Route carried "under" structure: State highway 173,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,730 (year 2022),  Truck Traffic: 9%,  Features Intersected: OVER SR 173,GROVE CITY,  Facility Carried by Structure: SR 80,EB
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 10.726,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 2581,  Location: WOLF CREEK TOWNSHIP (Lat: 41.201900,  Lng: -80.074419),  Route carried "under" structure: State highway 173,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,730 (year 2022),  Truck Traffic: 9%,  Features Intersected: OVER SR 173,GROVE CITY,  Facility Carried by Structure: SR 80,WB
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 10.726,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 2595,  Location: SPRINGFIELD TOWNSHIP (Lat: 41.160042,  Lng: -80.159658),  Route carried "under" structure: Interstate 79,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 9,615 (year 2021),  Truck Traffic: 19%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 2006,BLACKTOWN
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 5.053,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 2595,  Location: SPRINGFIELD TOWNSHIP (Lat: 41.160042,  Lng: -80.159658),  Route carried "under" structure: Interstate 79,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 9,619 (year 2021),  Truck Traffic: 20%,  Features Intersected: OVER SR 79,NB/SB,  Facility Carried by Structure: SR 2006,BLACKTOWN
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 4.994,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 40212,  Location: PINE TOWNSHIP (Lat: 41.195225,  Lng: -80.124111),  Route carried "under" structure: State highway ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 1,279 (year 2022),  Truck Traffic: 5%,  Features Intersected: OVER SR 2007,T-439 & RR,  Facility Carried by Structure: SR 80,EB
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.063,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 40212,  Location: PINE TOWNSHIP (Lat: 41.195225,  Lng: -80.124111),  Route carried "under" structure: City street 7219,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2001),  Features Intersected: OVER SR 2007,T-439 & RR,  Facility Carried by Structure: SR 80,EB
Minimum Vertical Clearance: 6.27m (20.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 40555,  Location: PINE TOWNSHIP (Lat: 41.195514,  Lng: -80.124953),  Route carried "under" structure: State highway ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 1,279 (year 2022),  Truck Traffic: 5%,  Features Intersected: OVER SR 2007,T-439 & RR,  Facility Carried by Structure: SR 80,WB
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.063,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 40555,  Location: PINE TOWNSHIP (Lat: 41.195514,  Lng: -80.124953),  Route carried "under" structure: City street 7206,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2003),  Features Intersected: OVER SR 2007,T-439 & RR,  Facility Carried by Structure: SR 80,WB
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 44246,  Location: SPRINGFIELD TOWNSHIP (Lat: 41.143333,  Lng: -80.151667),  Route carried "under" structure: Interstate 79,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 9,615 (year 2021),  Truck Traffic: 19%,  Features Intersected: OVER I-79,NB/SB,  Facility Carried by Structure: SR 208,GROVE CITY
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 3.444,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 44246,  Location: SPRINGFIELD TOWNSHIP (Lat: 41.143333,  Lng: -80.151667),  Route carried "under" structure: Interstate 79,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 9,619 (year 2021),  Truck Traffic: 20%,  Features Intersected: OVER I-79,NB/SB,  Facility Carried by Structure: SR 208,GROVE CITY
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 3.392,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 34.1m (111.9ft)

Discuss Grove City, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.