Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hop Bottom, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 44Number of bridges
  • 636ft / 194mTotal length
  • $17,499,000Total costs
  • 577,070Total average daily traffic
  • 84,246Total average daily truck traffic
  • 790,117Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hop Bottom
  • No street view available for this location

New bridges in Hop Bottom, PA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 21910-1919
  • 11920-1929
  • 11930-1939
  • 31940-1949
  • 61950-1959
  • 211960-1969
  • 21970-1979
  • 31980-1989
  • 31990-1999
  • 12010-2019
Reconstructed bridges in Hop Bottom, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 41980-1989
  • 11990-1999
  • 72000-2009
  • 42010-2019
  • 52020-2022
Average Bridge Daily Traffic in Hop Bottom, PA
Average Bridge Truck Traffic in Hop Bottom, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.5%Excellent
  • 7.5%Very good
  • 40.0%Good
  • 32.5%Satisfactory
  • 10.0%Fair
  • 7.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 2.3%Excellent
  • 7.0%Very good
  • 18.6%Good
  • 51.2%Satisfactory
  • 14.0%Fair
  • 7.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.3%Very good
  • 27.9%Good
  • 34.9%Satisfactory
  • 25.6%Fair
  • 7.0%Poor
  • 2.3%Imminent failure
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.2%Very good
  • 20.8%Good
  • 37.5%Satisfactory
  • 20.8%Fair
  • 16.7%Poor
Find on map >>   Show street view

Structure Number: 2044,  Location: Veterans Bridge (Lat: 40.452722,  Lng: -79.996458),  Route carried "on" structure: Interstate 579,  Year Built: 1988,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 56.57m (185.60ft),  Average Daily Traffic: 1,593 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,161 (year 2032),  Design Load: HL 93,  Features Intersected: NS RAILWAY,  Facility Carried by Structure: HOV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.001,  Lanes on structure: 1,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 19,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 56.80m (186.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $235,000,  Roadway Improvement Cost: $692,000,  Total Project Cost: $3,171,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 325,  Location: HUNGRY HOLLOW NO.2 (Lat: 40.642575,  Lng: -79.566914),  Route carried "on" structure: State highway ,  Year Built: 1937,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 90 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 275 (year 2032),  Design Load: HS 20,  Features Intersected: GUFFY RUN,  Facility Carried by Structure: SR2059
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.822,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $14,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $189,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20406,  Location: MOOSIC BORO .1 M SR 3019 (Lat: 41.348883,  Lng: -75.736525),  Route carried "on" structure: US 11,  Year Built: 1988,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 10,761 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,938 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LUZERNE CO RAIL AUTHRITY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $269,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20411,  Location: CTY SCRANTON SPRUCE COMPL (Lat: 41.403203,  Lng: -75.659717),  Route carried "on" structure: US 11,  Year Built: 1969,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 27,237 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 37,425 (year 2032),  Design Load: HS 20,  Features Intersected: SR 8025
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.477,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.8m (48.6ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $211,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20412,  Location: CTY SCRANTON SPRUCE COMPL (Lat: 41.404153,  Lng: -75.659828),  Route carried "on" structure: US 11,  Year Built: 1969,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 27,237 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 37,425 (year 2032),  Design Load: HS 20,  Features Intersected: 8025 ROARING BR RR SER R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.477,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.50m (21.33ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $43,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $577,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20414,  Location: SCRANTON CITY MULBERRY ST (Lat: 41.413556,  Lng: -75.666286),  Route carried "on" structure: US 11,  Year Built: 1994,  Status: Open,  Structure Length: 12.28m (40.29ft),  Average Daily Traffic: 19,378 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 23,330 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: LACK CO. RAILROAD AUTH.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.720,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 31.7m (104.0ft),  Out-to-Out Width: 36.1m (118.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.20m (43.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20418,  Location: SCRANTON CTY OVR COURT ST (Lat: 41.431269,  Lng: -75.670214),  Route carried "on" structure: US 11,  Year Built: 1963,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 20,807 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 38,628 (year 2032),  Design Load: HS 20,  Features Intersected: COURT STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.836,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.4m (73.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $129,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20421,  Location: CTY SCR OVER KEYSER AVE (Lat: 41.444411,  Lng: -75.671364),  Route carried "on" structure: US 11,  Year Built: 1963,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 20,807 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 38,628 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 6307 KEYSER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.404,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.4m (73.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20422,  Location: SCRANTON CITY OAK ST EXIT (Lat: 41.451761,  Lng: -75.666736),  Route carried "on" structure: US 11,  Year Built: 1963,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 20,807 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 38,628 (year 2032),  Design Load: HS 20,  Features Intersected: SR 6011 OAK ST EXIT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.327,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.4m (73.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $136,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20424,  Location: MOOSIC BORO .2 M S TR 502 (Lat: 41.349858,  Lng: -75.726122),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 12.62m (41.40ft),  Average Daily Traffic: 23,831 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 40,685 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LUZ CO R A & SPRNGBRK CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.307,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 12 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.60m (41.34ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $26,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $352,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20425,  Location: MOOSIC BORO OVER TR 502 (Lat: 41.351517,  Lng: -75.724789),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 8.17m (26.80ft),  Average Daily Traffic: 23,831 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 40,685 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 0502 TR 502
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.307,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.20m (26.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $72,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $972,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20427,  Location: MOOSIC BORO .2 M S TR 502 (Lat: 41.350333,  Lng: -75.726111),  Route carried "on" structure: Interstate 81,  Year Built: 1955,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 12.07m (39.60ft),  Average Daily Traffic: 23,340 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 40,435 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RR & SPRINGBROOK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.328,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.00m (39.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $142,000,  Roadway Improvement Cost: $418,000,  Total Project Cost: $1,917,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20429,  Location: MOOSIC BO OVR PA TURNPIKE (Lat: 41.355733,  Lng: -75.715050),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 30,231 (year 2021),  Truck Traffic: 19%,  Average Future Daily Traffic: 40,467 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-476 PA TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.112,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $406,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20431,  Location: MOOSIC BORO OVER TURNPIKE (Lat: 41.357289,  Lng: -75.716250),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 31,974 (year 2021),  Truck Traffic: 18%,  Average Future Daily Traffic: 42,715 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-476 PA TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.149,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $23,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $311,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20433,  Location: MOOSIC BORO OVER SR 3031 (Lat: 41.358444,  Lng: -75.706789),  Route carried "on" structure: Interstate 81,  Year Built: 1963,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 31,974 (year 2021),  Truck Traffic: 18%,  Average Future Daily Traffic: 42,715 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 3031
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.084,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 12 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $38,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $510,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20434,  Location: MOOSIC BORO .2M S SR 3016 (Lat: 41.368369,  Lng: -75.690158),  Route carried "on" structure: Interstate 81,  Year Built: 1962,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 30,231 (year 2021),  Truck Traffic: 19%,  Average Future Daily Traffic: 40,467 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: Delaware-Lackawanna RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $469,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20435,  Location: MOOSIC BORO .2M S SR 3016 (Lat: 41.368967,  Lng: -75.690778),  Route carried "on" structure: Interstate 81,  Year Built: 1962,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 31,974 (year 2021),  Truck Traffic: 18%,  Average Future Daily Traffic: 42,715 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LUZERNE CO. RR AUTHORITY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.693,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $34,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $458,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20443,  Location: SCRANTON CTY OV MOOSIC ST (Lat: 41.478333,  Lng: -75.563333),  Route carried "on" structure: Interstate 81,  Year Built: 1965,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 30,052 (year 2021),  Truck Traffic: 19%,  Average Future Daily Traffic: 35,697 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 0307 MOOSIC ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.270,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $42,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $564,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20445,  Location: SCRANTON CITY OV RMPS A&C (Lat: 41.396422,  Lng: -75.645519),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 30,052 (year 2021),  Truck Traffic: 19%,  Average Future Daily Traffic: 35,697 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 8005 RAMPS A & C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.270,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.4m (103.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $32,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $434,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20456,  Location: SCRANTON CTY OVER BLD AVE (Lat: 41.447889,  Lng: -75.633278),  Route carried "on" structure: Interstate 81,  Year Built: 1958,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 54,680 (year 2022),  Truck Traffic: 15%,  Average Future Daily Traffic: 69,796 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BOULEVARD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.186,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.3m (66.6ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $63,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $845,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20463,  Location: S ABINGTN TP OV TP RD 444 (Lat: 41.468861,  Lng: -75.670083),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 21,897 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 22,064 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: TWP RD 444 SCOTT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.342,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 15 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $40,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $541,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20465,  Location: S ABINGTON TWP OVER T-442 (Lat: 41.472797,  Lng: -75.678567),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 21,897 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 22,064 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: TWP RD 442 BURCHER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.127,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $267,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20467,  Location: S ABINGTON TWP OV SR 1027 (Lat: 41.473533,  Lng: -75.679531),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 21,897 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 22,064 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 1027 LAYTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.833,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 26297,  Location: ELLIOTT RD. WOLF CREEK (Lat: 41.210428,  Lng: -80.080997),  Route carried "on" structure: City street T451,  Year Built: 1976,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 365 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 510 (year 2038),  Design Load: HS 20,  Features Intersected: OVER BLACK RUN,  Facility Carried by Structure: BRIDGE 2706,T-451
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Total Project Cost: $1,398,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31127,  Location: 0.5 MI E OF MIDDLEBURG (Lat: 40.790003,  Lng: -77.028386),  Route carried "on" structure: US 522,  Year Built: 1941,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 9,468 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,167 (year 2032),  Features Intersected: TRIBUTARY MIDDLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.013,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020
Find on map >>   Show street view

Structure Number: 32217,  Location: LENOX TWP 50' S SR 2039 (Lat: 41.657300,  Lng: -75.721586),  Route carried "on" structure: State highway 92,  Year Built: 1959,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,855 (year 2022),  Truck Traffic: 30%,  Average Future Daily Traffic: 1,990 (year 2032),  Design Load: HS 20,  Features Intersected: MILLARD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.580,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Bridge Improvement Cost: $13,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $180,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 32218,  Location: LENOX TWP 300' N SR 2045 (Lat: 41.676644,  Lng: -75.706464),  Route carried "on" structure: State highway 92,  Year Built: 1957,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,216 (year 2022),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,213 (year 2032),  Design Load: HS 20,  Features Intersected: TOWER BRANCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.368,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 32248,  Location: HOP BOTTOM BO JCT SR 2002 (Lat: 41.705325,  Lng: -75.767383),  Route carried "on" structure: Spur State highway 167,  Year Built: 1962,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 1,875 (year 2022),  Truck Traffic: 17%,  Average Future Daily Traffic: 2,295 (year 2032),  Design Load: HS 20,  Features Intersected: MARTINS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 0.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $218,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 32249,  Location: HOP BOTTOM BO .7M W TR 11 (Lat: 41.712442,  Lng: -75.772694),  Route carried "on" structure: State highway 167,  Year Built: 1962,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 1,301 (year 2022),  Truck Traffic: 18%,  Average Future Daily Traffic: 1,621 (year 2032),  Design Load: HS 20,  Features Intersected: HOP BOTTOM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.732,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $13,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $176,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 32472,  Location: LATHROP TWP 618' E SR2009 (Lat: 41.684978,  Lng: -75.799531),  Route carried "on" structure: State highway ,  Year Built: 1961,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 297 (year 2022),  Truck Traffic: 21%,  Average Future Daily Traffic: 305 (year 2032),  Design Load: HS 20,  Features Intersected: HORTON CREEK,  Facility Carried by Structure: SR 2002
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.560,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020
Find on map >>   Show street view

Structure Number: 32482,  Location: LATHROP TWP .2M N SR 2096 (Lat: 41.710333,  Lng: -75.811219),  Route carried "on" structure: State highway ,  Year Built: 1954,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 83 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 104 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB HORTONS CREEK,  Facility Carried by Structure: SR 2009
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.951,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $11,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $152,000,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 32493,  Location: BROOKLYN TWP 150' W TR167 (Lat: 41.750397,  Lng: -75.807006),  Route carried "on" structure: State highway ,  Year Built: 1945,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 272 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 265 (year 2032),  Design Load: HS 20,  Features Intersected: HOP BOTTOM CREEK,  Facility Carried by Structure: SR 2015 LINDEVL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.868,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $31,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $423,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 325,  Location: HOP BOTTOM BO .5M S TR 11 (Lat: 41.695300,  Lng: -75.768797),  Route carried "on" structure: State highway ,  Year Built: 1915,  Status: Closed,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 70 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 156 (year 2032),  Design Load: H 20,  Features Intersected: NORFOLK SOUTHERN RR,  Facility Carried by Structure: SR 2017
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.820,  Lanes on structure: 2,  Owner: Railroad,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Superstructure: Poor,  Substructure: Imminent failure,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Bridge Improvement Cost: $22,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $302,000
Find on map >>   Show street view

Structure Number: 32519,  Location: BROOKLYN TWP 800'W TR 167 (Lat: 41.754483,  Lng: -75.813931),  Route carried "on" structure: State highway ,  Year Built: 1947,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 1,088 (year 2022),  Truck Traffic: 26%,  Average Future Daily Traffic: 795 (year 2032),  Design Load: HS 20,  Features Intersected: HOP BOTTOM CREEK,  Facility Carried by Structure: SR 2024
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.551,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3254,  Location: LENOX TWP .3 M N TR 92 (Lat: 41.660906,  Lng: -75.725794),  Route carried "on" structure: State highway ,  Year Built: 1951,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 467 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 580 (year 2038),  Design Load: HS 20,  Features Intersected: MILLARD CREEK,  Facility Carried by Structure: SR 2039
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $224,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 32543,  Location: HOP BOTTOM BO .2M E TR 11 (Lat: 41.702397,  Lng: -75.762297),  Route carried "on" structure: State highway ,  Year Built: 1915,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 470 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 488 (year 2032),  Features Intersected: NORFOLK SOUTHERN RR,  Facility Carried by Structure: SR 2041
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.681,  Lanes on structure: 2,  Owner: Railroad,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $21,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $278,000
Find on map >>   Show street view

Structure Number: 32689,  Location: 1.1 MILE SE OF BROOKLYN (Lat: 41.739169,  Lng: -75.797853),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 100 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 150 (year 2031),  Design Load: H 20,  Features Intersected: HOPBOTTOM CREEK,  Facility Carried by Structure: QUICKS HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $18,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $243,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Discuss Hop Bottom, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.