Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Indianapolis, Indiana (IN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 1,482Number of bridges
  • 15,935ft / 4,857mTotal length
  • $97,296,000Total costs
  • 46,244,197Total average daily traffic
  • 6,291,781Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Indianapolis
  • No street view available for this location

New bridges in Indianapolis, IN - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 101900-1909
  • 131910-1919
  • 241920-1929
  • 251930-1939
  • 161940-1949
  • 1301950-1959
  • 4561960-1969
  • 3181970-1979
  • 561980-1989
  • 871990-1999
  • 2022000-2009
  • 1222010-2019
  • 222020-2022
Reconstructed bridges in Indianapolis, IN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 41950-1959
  • 41960-1969
  • 241970-1979
  • 881980-1989
  • 1371990-1999
  • 1122000-2009
  • 652010-2019
  • 252020-2022
Average Bridge Daily Traffic in Indianapolis, IN
Average Bridge Truck Traffic in Indianapolis, IN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.6%Excellent
  • 14.6%Very good
  • 36.5%Good
  • 29.0%Satisfactory
  • 13.2%Fair
  • 2.9%Poor
  • 0.3%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.9%Excellent
  • 15.1%Very good
  • 38.6%Good
  • 23.9%Satisfactory
  • 15.9%Fair
  • 2.2%Poor
  • 0.5%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.7%Excellent
  • 13.3%Very good
  • 42.3%Good
  • 29.2%Satisfactory
  • 9.4%Fair
  • 1.9%Poor
  • 0.1%Imminent failure
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 0.3%Excellent
  • 7.7%Very good
  • 33.9%Good
  • 40.9%Satisfactory
  • 14.8%Fair
  • 2.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 10.3%Excellent
  • 35.0%Very good
  • 33.3%Good
  • 14.5%Satisfactory
  • 5.1%Fair
  • 1.7%Poor
  • 0.9%Serious
Find on map >>   Show street view

Structure Number: 76638,  Location: 03.16 E US 31 (Lat: 39.921519,  Lng: -86.112261),  Route carried "under" structure: Ramp City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2010),  Truck Traffic: 5%,  Features Intersected: KEYSTONE AVE SBL RAMP,  Facility Carried by Structure: I-465 WB
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 0.113,  Lanes on structure: 5,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 76638,  Location: 03.16 E US 31 (Lat: 39.921519,  Lng: -86.112261),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2010),  Truck Traffic: 5%,  Features Intersected: KEYSTONE AVE NBL,  Facility Carried by Structure: I-465 WB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.113,  Lanes on structure: 5,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 76638,  Location: 03.16 E US 31 (Lat: 39.921519,  Lng: -86.112261),  Route carried "under" structure: Ramp City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2010),  Truck Traffic: 5%,  Features Intersected: KEYSTONE AVE NBL RAMP,  Facility Carried by Structure: I-465 WB
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.113,  Lanes on structure: 5,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 76638,  Location: 03.16 E US 31 (Lat: 39.921519,  Lng: -86.112261),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2010),  Truck Traffic: 5%,  Features Intersected: KEYSTONE AVE SBL,  Facility Carried by Structure: I-465 WB
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.113,  Lanes on structure: 5,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 76646,  Location: 02.15 S US 36 (Lat: 39.748519,  Lng: -86.264289),  Route carried "under" structure: US 40,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 23,505 (year 2006),  Truck Traffic: 5%,  Features Intersected: US 40/WASHINGTON ST EBL,  Facility Carried by Structure: I-465 NB
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 5.697,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 76646,  Location: 02.15 S US 36 (Lat: 39.748519,  Lng: -86.264289),  Route carried "under" structure: US 40,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 23,505 (year 2006),  Truck Traffic: 5%,  Features Intersected: US 40/WASHINGTON ST WBL,  Facility Carried by Structure: I-465 NB
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 5.697,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 76648,  Location: 02.15 S US 36 (Lat: 39.748331,  Lng: -86.264850),  Route carried "under" structure: US 40,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 23,505 (year 2006),  Truck Traffic: 5%,  Features Intersected: US 40/WASHINGTON ST WBL,  Facility Carried by Structure: I-465 SB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 5.681,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 76648,  Location: 02.15 S US 36 (Lat: 39.748331,  Lng: -86.264850),  Route carried "under" structure: US 40,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 23,505 (year 2006),  Truck Traffic: 5%,  Features Intersected: US 40/WASHINGTON ST EBL,  Facility Carried by Structure: I-465 SB
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 5.681,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 79628,  Location: 00.13 E I-465 (Lat: 39.714550,  Lng: -86.263319),  Route carried "under" structure: Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 37,175 (year 2006),  Truck Traffic: 7%,  Features Intersected: I-465 NB
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 117.289,  Lanes on structure: 2,  Lanes under structure: 19,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 79628,  Location: 00.13 E I-465 (Lat: 39.714550,  Lng: -86.263319),  Route carried "under" structure: Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 39,200 (year 2006),  Truck Traffic: 6%,  Features Intersected: I-465 SB
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 117.289,  Lanes on structure: 2,  Lanes under structure: 19,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 79628,  Location: 00.13 E I-465 (Lat: 39.714550,  Lng: -86.263319),  Route carried "under" structure: Interstate 70,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 21,150 (year 2006),  Truck Traffic: 11%,  Features Intersected: I-70 EB
Minimum Vertical Clearance: 6.27m (20.57ft),  Kilometerpoint: 117.289,  Lanes on structure: 2,  Lanes under structure: 19,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 79628,  Location: 00.13 E I-465 (Lat: 39.714550,  Lng: -86.263319),  Route carried "under" structure: Interstate 70,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 22,585 (year 2006),  Truck Traffic: 9%,  Features Intersected: I-70 WB
Minimum Vertical Clearance: 7.29m (23.92ft),  Kilometerpoint: 117.289,  Lanes on structure: 2,  Lanes under structure: 19,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 79628,  Location: 00.13 E I-465 (Lat: 39.714550,  Lng: -86.263319),  Route carried "under" structure: Ramp Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 19,625 (year 2006),  Truck Traffic: 11%,  Features Intersected: RAMP I70 EB to I465 NB
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 117.289,  Lanes on structure: 2,  Lanes under structure: 19,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 79628,  Location: 00.13 E I-465 (Lat: 39.714550,  Lng: -86.263319),  Route carried "under" structure: Ramp Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 14,325 (year 2006),  Truck Traffic: 16%,  Features Intersected: I-465 SB CD
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 117.289,  Lanes on structure: 2,  Lanes under structure: 19,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 7963,  Location: 00.79 N SR 67 (Lat: 39.710969,  Lng: -86.264461),  Route carried "under" structure: Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 39,200 (year 2006),  Truck Traffic: 10%,  Features Intersected: I-465 SB
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 14.645,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 7963,  Location: 00.79 N SR 67 (Lat: 39.710969,  Lng: -86.264461),  Route carried "under" structure: Ramp Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 6,015 (year 2006),  Truck Traffic: 9%,  Features Intersected: I-465 SB CD
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 14.645,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 7963,  Location: 00.79 N SR 67 (Lat: 39.710969,  Lng: -86.264461),  Route carried "under" structure: Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 37,175 (year 2006),  Truck Traffic: 12%,  Features Intersected: I-465 NB
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 14.645,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 79634,  Location: 06.53 E SR 267 (Lat: 39.712761,  Lng: -86.264481),  Route carried "under" structure: Ramp Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 14,325 (year 2006),  Truck Traffic: 18%,  Features Intersected: I-465 SB CD,  Facility Carried by Structure: I-70 EB
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 14.967,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 79634,  Location: 06.53 E SR 267 (Lat: 39.712761,  Lng: -86.264481),  Route carried "under" structure: Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 37,175 (year 2006),  Truck Traffic: 12%,  Features Intersected: I-465 NB,  Facility Carried by Structure: I-70 EB
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 14.967,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 79634,  Location: 06.53 E SR 267 (Lat: 39.712761,  Lng: -86.264481),  Route carried "under" structure: Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 39,200 (year 2006),  Truck Traffic: 10%,  Features Intersected: I-465 SB,  Facility Carried by Structure: I-70 EB
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 14.967,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 79636,  Location: 06.53 E SR 267 (Lat: 39.713011,  Lng: -86.264469),  Route carried "under" structure: Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 37,175 (year 2006),  Truck Traffic: 12%,  Features Intersected: I-465 NB,  Facility Carried by Structure: I-70 WB
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 14.967,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 79636,  Location: 06.53 E SR 267 (Lat: 39.713011,  Lng: -86.264469),  Route carried "under" structure: Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 39,200 (year 2006),  Truck Traffic: 10%,  Features Intersected: I-465 SB,  Facility Carried by Structure: I-70 WB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 14.967,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 79636,  Location: 06.53 E SR 267 (Lat: 39.713011,  Lng: -86.264469),  Route carried "under" structure: Ramp Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 14,325 (year 2006),  Truck Traffic: 18%,  Features Intersected: I-465 SB CD,  Facility Carried by Structure: I-70 WB
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 14.967,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 79646,  Location: 01.28 S US 40 (Lat: 39.729731,  Lng: -86.264511),  Route carried "under" structure: Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 74,710 (year 2006),  Truck Traffic: 12%,  Features Intersected: I-465 NB,  Facility Carried by Structure: SAM JONES EXPRWY
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 16.834,  Lanes on structure: 7,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 79646,  Location: 01.28 S US 40 (Lat: 39.729731,  Lng: -86.264511),  Route carried "under" structure: Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 76,525 (year 2006),  Truck Traffic: 12%,  Features Intersected: I-465 SB,  Facility Carried by Structure: SAM JONES EXPRWY
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 16.834,  Lanes on structure: 7,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 79648,  Location: 00.08 E I-465 (Lat: 39.713231,  Lng: -86.263081),  Route carried "under" structure: Ramp Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 19,625 (year 2006),  Truck Traffic: 16%,  Features Intersected: RAMP I-70 EB to I-465 NB,  Facility Carried by Structure: I-70 EB
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 14.999,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 7965,  Location: 00.08 E I-465 (Lat: 39.713419,  Lng: -86.263211),  Route carried "under" structure: Ramp Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 19,625 (year 2006),  Truck Traffic: 16%,  Features Intersected: RAMP I-70 EB to I-465 NB,  Facility Carried by Structure: I-70 WB
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 14.999,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 79652,  Location: 00.39 S I-69 (Lat: 39.890689,  Lng: -86.049431),  Route carried "under" structure: Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 79,190 (year 2006),  Truck Traffic: 18%,  Features Intersected: I-465 NBL,  Facility Carried by Structure: E 75TH STREET
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 59.353,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 44.0m (144.4ft)

Find on map >>   Show street view

Structure Number: 79652,  Location: 00.39 S I-69 (Lat: 39.890689,  Lng: -86.049431),  Route carried "under" structure: Interstate 465,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 83,500 (year 2006),  Truck Traffic: 18%,  Features Intersected: I-465 SBL,  Facility Carried by Structure: E 75TH STREET
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 59.353,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 44.0m (144.4ft)

Find on map >>   Show street view

Structure Number: 8003,  Location: 02.54 E SR 431 (Lat: 39.905211,  Lng: -86.070139),  Route carried "under" structure: Interstate 465,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 56,275 (year 2010),  Truck Traffic: 16%,  Features Intersected: I-465 EBL,  Facility Carried by Structure: E 82ND STREET EB
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 56.955,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 8003,  Location: 02.54 E SR 431 (Lat: 39.905211,  Lng: -86.070139),  Route carried "under" structure: Interstate 465,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 56,275 (year 2010),  Truck Traffic: 16%,  Features Intersected: I-465 WBL,  Facility Carried by Structure: E 82ND STREET EB
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 56.955,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 80032,  Location: 02.54 E SR 431 (Lat: 39.905339,  Lng: -86.070311),  Route carried "under" structure: Interstate 465,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 56,275 (year 2010),  Truck Traffic: 16%,  Features Intersected: I-465 WBL,  Facility Carried by Structure: E 82ND STREET WB
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 56.939,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 80032,  Location: 02.54 E SR 431 (Lat: 39.905339,  Lng: -86.070311),  Route carried "under" structure: Interstate 465,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 56,275 (year 2010),  Truck Traffic: 16%,  Features Intersected: I-465 EBL,  Facility Carried by Structure: E 82ND STREET WB
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 56.939,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 4900008,  Location: 00.58 E ZIONSVILLE ROAD (Lat: 39.911081,  Lng: -86.249275),  Route carried "under" structure: ServiceOther road ,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 369 (year 2010),  Truck Traffic: 5%,  Features Intersected: 86TH ST,  Facility Carried by Structure: ROCK ISLAND ACCESS
Minimum Vertical Clearance: 6.02m (19.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 4900103,  Location: 00.15 E I-65 (Lat: 39.825100,  Lng: -86.225914),  Route carried "under" structure: City street 251,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,600 (year 1995),  Truck Traffic: 5%,  Features Intersected: GUION ROAD,  Facility Carried by Structure: 38TH STREET WB
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 4900104,  Location: 00.50 E OF LAFAYETTE ROAD (Lat: 39.823511,  Lng: -86.225853),  Route carried "under" structure: City street 251,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,600 (year 1995),  Truck Traffic: 5%,  Features Intersected: GUION ROAD,  Facility Carried by Structure: 38TH STREET EB
Minimum Vertical Clearance: 6.12m (20.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 4900121,  Location: 00.35 W OF MICHIGAN ROAD (Lat: 39.824631,  Lng: -86.187431),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 1996),  Truck Traffic: 10%,  Features Intersected: CENTRAL CANAL TRAIL,  Facility Carried by Structure: 38TH ST WB
Minimum Vertical Clearance: 3.66m (12.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.4m (73.5ft)

Find on map >>   Show street view

Structure Number: 4900122,  Location: 00.35 W OF MICHIGAN ROAD (Lat: 39.824511,  Lng: -86.187453),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 1996),  Truck Traffic: 20%,  Features Intersected: CENTRAL CANAL TRAIL,  Facility Carried by Structure: 38TH STREET EB
Minimum Vertical Clearance: 3.33m (10.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.4m (73.5ft)

Find on map >>   Show street view

Structure Number: 4900123,  Location: 00.48 W MICHIGAN ROAD (Lat: 39.824614,  Lng: -86.191719),  Route carried "under" structure: Alternate City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 3,748 (year 1995),  Truck Traffic: 5%,  Features Intersected: WHITE R PARKWAY W DR,  Facility Carried by Structure: 38TH STREET WB
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.3m (122.4ft)

Find on map >>   Show street view

Structure Number: 4900123,  Location: 00.48 W MICHIGAN ROAD (Lat: 39.824647,  Lng: -86.188981),  Route carried "under" structure: Alternate City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 539 (year 2014),  Truck Traffic: 10%,  Features Intersected: WHITE R PARKWAY E DR,  Facility Carried by Structure: 38TH STREET WB
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.3m (122.4ft)

Find on map >>   Show street view

Structure Number: 4900124,  Location: 00.48 W MICHIGAN ROAD (Lat: 39.824475,  Lng: -86.191661),  Route carried "under" structure: Alternate City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 3,748 (year 1995),  Truck Traffic: 5%,  Features Intersected: WHITE R PARKWAY W DR,  Facility Carried by Structure: 38TH STREET EB
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.3m (122.4ft)

Find on map >>   Show street view

Structure Number: 4900124,  Location: 00.48 W MICHIGAN ROAD (Lat: 39.824503,  Lng: -86.188900),  Route carried "under" structure: Alternate City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 539 (year 2014),  Truck Traffic: 10%,  Features Intersected: WHITE R PARKWAY E DR,  Facility Carried by Structure: 38TH STREET EB
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.3m (122.4ft)

Find on map >>   Show street view

Structure Number: 490015,  Location: 00.10 W OF EMERSON AVE (Lat: 39.810250,  Lng: -86.085442),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 10,260 (year 2010),  Truck Traffic: 15%,  Features Intersected: MASSACHUSETTS/CONRAIL,  Facility Carried by Structure: 30TH ST
Minimum Vertical Clearance: 6.83m (22.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 4900154,  Location: 00.60 N I-70 (Lat: 39.811039,  Lng: -86.083383),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 12,700 (year 2012),  Truck Traffic: 15%,  Features Intersected: MASSACHUSETTS AVENUE,  Facility Carried by Structure: EMERSON AVENUE
Minimum Vertical Clearance: 7.19m (23.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.0m (75.5ft)

Find on map >>   Show street view

Structure Number: 4900284,  Location: 00.40 W I-70 (Lat: 39.730381,  Lng: -86.250314),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 7,306 (year 2014),  Truck Traffic: 15%,  Features Intersected: SAM JONES EXPRWY,  Facility Carried by Structure: LYNHURST DRIVE NB
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 4900284,  Location: 00.40 W I-70 (Lat: 39.730381,  Lng: -86.250311),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 7,306 (year 2014),  Truck Traffic: 15%,  Features Intersected: SAM JONES EXPRWY,  Facility Carried by Structure: LYNHURST DRIVE SB
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 4900285,  Location: 00.40 E I-465 (Lat: 39.729931,  Lng: -86.256531),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 19,031 (year 2014),  Truck Traffic: 15%,  Features Intersected: SAM JONES EXPWY EB,  Facility Carried by Structure: EXECUTIVE DRIVE
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.6m (54.5ft)

Find on map >>   Show street view

Structure Number: 4900285,  Location: 00.40 E I-465 (Lat: 39.729931,  Lng: -86.256531),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 19,031 (year 2014),  Truck Traffic: 15%,  Features Intersected: SAM JONES EXPWY WB,  Facility Carried by Structure: EXECUTIVE DRIVE
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.6m (54.5ft)

Find on map >>   Show street view

Structure Number: 4900294,  Location: 00.80 E HARDING ST (Lat: 39.737072,  Lng: -86.167269),  Route carried "under" structure: ServiceCity street ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2012),  Truck Traffic: 10%,  Features Intersected: OLD RAMOND ST E,  Facility Carried by Structure: RAYMOND ST
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 4900294,  Location: 00.80 E HARDING ST (Lat: 39.737050,  Lng: -86.170158),  Route carried "under" structure: City street ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 188,380 (year 2010),  Truck Traffic: 10%,  Features Intersected: WEST ST E SIDE,  Facility Carried by Structure: RAYMOND ST
Minimum Vertical Clearance: 6.45m (21.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 4900294,  Location: 00.80 E HARDING ST (Lat: 39.737056,  Lng: -86.168719),  Route carried "under" structure: ServiceOther road ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 2010),  Truck Traffic: 50%,  Features Intersected: GRAVEL RD 1 EAST,  Facility Carried by Structure: RAYMOND ST
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 4900294,  Location: 00.80 E HARDING ST (Lat: 39.737025,  Lng: -86.171831),  Route carried "under" structure: ServiceOther road ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 2010),  Truck Traffic: 50%,  Features Intersected: GRAVEL RD 1 WEST,  Facility Carried by Structure: RAYMOND ST
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 4900294,  Location: 00.80 E HARDING ST (Lat: 39.737025,  Lng: -86.171831),  Route carried "under" structure: ServiceCity street ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 20 (year 2010),  Truck Traffic: 50%,  Features Intersected: ACCESS RD 1 WEST,  Facility Carried by Structure: RAYMOND ST
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 4900294,  Location: 00.80 E HARDING ST (Lat: 39.737050,  Lng: -86.169261),  Route carried "under" structure: ServiceOther road ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 2010),  Truck Traffic: 1%,  Features Intersected: GRAVEL RD 2 EAST,  Facility Carried by Structure: RAYMOND ST
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 4900474,  Location: 00.50 N RAYMOND ST (Lat: 39.745131,  Lng: -86.121061),  Route carried "under" structure: City street ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 9,100 (year 2014),  Truck Traffic: 15%,  Features Intersected: KEYSTONE AVE SB,  Facility Carried by Structure: MINNESOTA ST
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 4900474,  Location: 00.50 N RAYMOND ST (Lat: 39.745131,  Lng: -86.121064),  Route carried "under" structure: City street ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 9,100 (year 2014),  Truck Traffic: 15%,  Features Intersected: KEYSTONE AVE NB,  Facility Carried by Structure: MINNESOTA ST
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 4900492,  Location: 00.60 S I-465 (Lat: 39.912381,  Lng: -86.114128),  Route carried "under" structure: City street 188,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 53,264 (year 2010),  Truck Traffic: 5%,  Features Intersected: 86TH STREET EB,  Facility Carried by Structure: KEYSTONE AVENUE NB
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.8m (48.6ft)

Find on map >>   Show street view

Structure Number: 4900492,  Location: 00.60 S I-465 (Lat: 39.912381,  Lng: -86.114119),  Route carried "under" structure: City street 188,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 53,250 (year 2010),  Truck Traffic: 5%,  Features Intersected: 86TH STREET WB,  Facility Carried by Structure: KEYSTONE AVENUE SB
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.8m (48.6ft)

Find on map >>   Show street view

Structure Number: 4900493,  Location: 00.60 S I-465 (Lat: 39.912389,  Lng: -86.114389),  Route carried "under" structure: City street 188,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 53,264 (year 2010),  Truck Traffic: 10%,  Features Intersected: 86TH STREET EBL,  Facility Carried by Structure: KEYSTONE AVENUE SB
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.8m (48.6ft)

Find on map >>   Show street view

Structure Number: 4900493,  Location: 00.60 S I-465 (Lat: 39.912389,  Lng: -86.114381),  Route carried "under" structure: City street 188,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 53,260 (year 2010),  Truck Traffic: 10%,  Features Intersected: 86TH STREET WBL,  Facility Carried by Structure: KEYSTONE AVENUE SB
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.8m (48.6ft)

Find on map >>   Show street view

Structure Number: 4900618,  Location: 00.85 W OF MERIDIAN STREE (Lat: 39.764311,  Lng: -86.173103),  Route carried "under" structure: City street ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 2,738 (year 1997),  Truck Traffic: 5%,  Features Intersected: WHITE RIVER PARKWAY-WEST,  Facility Carried by Structure: WASHINGTON STREET
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 62.9m (206.4ft)

Find on map >>   Show street view

Structure Number: 490063,  Location: 00.75 S WASHINGTON ST (Lat: 39.761400,  Lng: -86.042931),  Route carried "under" structure: City street 142,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 450 (year 2002),  Truck Traffic: 5%,  Features Intersected: SHADELAND AVE,  Facility Carried by Structure: ENGLISH AVENUE EB
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 490063,  Location: 00.75 S WASHINGTON ST (Lat: 39.761400,  Lng: -86.042931),  Route carried "under" structure: City street 142,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 450 (year 2002),  Truck Traffic: 5%,  Features Intersected: SHADELAND AVE,  Facility Carried by Structure: ENGLISH AVENUE WB
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 4900631,  Location: 00.80 W I-465 (Lat: 39.772139,  Lng: -86.045372),  Route carried "under" structure: City street 100,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 23,306 (year 1997),  Truck Traffic: 5%,  Features Intersected: WASHINGTON ST,  Facility Carried by Structure: SHADELAND AVE NB
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 15.3m (50.2ft)

Find on map >>   Show street view

Structure Number: 4900631,  Location: 00.80 W I-465 (Lat: 39.772139,  Lng: -86.045369),  Route carried "under" structure: City street ,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 600 (year 2005),  Truck Traffic: 5%,  Features Intersected: WASHINGTON ST,  Facility Carried by Structure: SHADELAND AVE SB
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 15.3m (50.2ft)

Find on map >>   Show street view

Structure Number: 4900637,  Location: 00.60 N OF KESSLER BLVD (Lat: 39.871161,  Lng: -86.156219),  Route carried "under" structure: City street ,  Year Built: 1926,  Structure Length: 0. m,  Average Daily Traffic: 1,200 (year 2010),  Truck Traffic: 5%,  Features Intersected: RIVERVIEW DRIVE,  Facility Carried by Structure: MERIDIAN STREET
Minimum Vertical Clearance: 2.67m (8.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 4900639,  Location: 00.25 E MERIDIAN ST (Lat: 39.751889,  Lng: -86.154275),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 5,450 (year 2010),  Truck Traffic: 5%,  Features Intersected: MADISON AVE,  Facility Carried by Structure: MORRIS ST EB
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 4900639,  Location: 00.25 E MERIDIAN ST (Lat: 39.751889,  Lng: -86.154269),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 5,450 (year 2010),  Truck Traffic: 5%,  Features Intersected: MADISON AVE,  Facility Carried by Structure: MORRIS STREET WB
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 490064,  Location: 00.25 E MERIDIAN STREET (Lat: 39.737250,  Lng: -86.154411),  Route carried "under" structure: City street ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 14,656 (year 2010),  Truck Traffic: 5%,  Features Intersected: MADISON AVENUE NB,  Facility Carried by Structure: RAYMOND STREET
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 490064,  Location: 00.25 E MERIDIAN STREET (Lat: 39.737250,  Lng: -86.154411),  Route carried "under" structure: City street ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 14,656 (year 2010),  Truck Traffic: 5%,  Features Intersected: MADISON AVENUE SB,  Facility Carried by Structure: RAYMOND STREET
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 4900649,  Location: 00.47 W I-465 (Lat: 39.753281,  Lng: -86.041861),  Route carried "under" structure: City street ,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 27,050 (year 2010),  Truck Traffic: 10%,  Features Intersected: BROOKVILLE RD,  Facility Carried by Structure: SHADELAND AVE NB
Minimum Vertical Clearance: 4.63m (15.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.5m (57.4ft)

Find on map >>   Show street view

Structure Number: 4900649,  Location: 00.47 W I-465 (Lat: 39.753281,  Lng: -86.041861),  Route carried "under" structure: City street 3873,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 27,050 (year 2010),  Truck Traffic: 10%,  Features Intersected: BROOKVILLE RD,  Facility Carried by Structure: SHADELAND AVE SB
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.5m (57.4ft)

Find on map >>   Show street view

Structure Number: 4900661,  Location: 01.65 NE OF PERIMETER RD (Lat: 39.714250,  Lng: -86.298797),  Route carried "under" structure: Ramp City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2008),  Truck Traffic: 10%,  Features Intersected: DEPARTURES (WEIR COOK),  Facility Carried by Structure: WEIR COOK MEM. DR
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 34.2m (112.2ft)

Find on map >>   Show street view

Structure Number: 4900662,  Location: 01.37 NE OF PERIMETER RD (Lat: 39.712600,  Lng: -86.298753),  Route carried "under" structure: Ramp City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 2,690 (year 2010),  Truck Traffic: 5%,  Features Intersected: PARKING AREA,  Facility Carried by Structure: AIRPORT ACCESS RD
Minimum Vertical Clearance: 2.31m (7.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.9m (39.0ft)

Find on map >>   Show street view

Structure Number: 4900665,  Location: 01.95 NE PERIMETER RD (Lat: 39.714500,  Lng: -86.301803),  Route carried "under" structure: Ramp City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2010),  Truck Traffic: 5%,  Features Intersected: GTC ACCESS RD,  Facility Carried by Structure: WEIR COOK MEM DR
Minimum Vertical Clearance: 3.94m (12.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 9.7m (31.8ft)

Find on map >>   Show street view

Structure Number: 4900666,  Location: 02.00 NE OF PERIMETER RD (Lat: 39.713150,  Lng: -86.303781),  Route carried "under" structure: Ramp City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 25 (year 2008),  Truck Traffic: 5%,  Features Intersected: WEIR COOK MEM DR,  Facility Carried by Structure: AIRPORT ACCESS RD
Minimum Vertical Clearance: 4.01m (13.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 9.7m (31.8ft)

Find on map >>   Show street view

Structure Number: 4900667,  Location: 00.65 N I-70 (Lat: 39.699611,  Lng: -86.317353),  Route carried "under" structure: Ramp City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2010),  Truck Traffic: 5%,  Features Intersected: PERIMETER RD,  Facility Carried by Structure: WEIR COOK MEMORIAL
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Length of Maximum Span: 36.7m (120.4ft)

Discuss Indianapolis, Indiana (IN) on our hugely popular Indiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.