Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Kirkwood, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 82Number of bridges
  • 659ft / 201mTotal length
  • $104,865,000Total costs
  • 604,676Total average daily traffic
  • 129,175Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Kirkwood
  • No street view available for this location

New bridges in Kirkwood, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 51940-1949
  • 21950-1959
  • 531960-1969
  • 21970-1979
  • 71980-1989
  • 41990-1999
  • 52000-2009
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Kirkwood, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 61970-1979
  • 01980-1989
  • 121990-1999
  • 12000-2009
  • 22010-2019
Average Bridge Daily Traffic in Kirkwood, NY
Average Bridge Truck Traffic in Kirkwood, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.9%Excellent
  • 7.9%Very good
  • 50.0%Good
  • 21.1%Satisfactory
  • 13.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.9%Excellent
  • 5.3%Very good
  • 55.3%Good
  • 26.3%Satisfactory
  • 5.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.3%Excellent
  • 2.6%Very good
  • 34.2%Good
  • 26.3%Satisfactory
  • 31.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.7%Excellent
  • 22.2%Good
  • 44.4%Satisfactory
  • 25.9%Fair
  • 3.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 7.1%Very good
  • 14.3%Good
  • 57.1%Satisfactory
  • 21.4%Fair
Find on map >>   Show street view

Structure Number: 100806,  Location: 1.2 MI N PENNSYLVANIA LIN (Lat: 42.011472,  Lng: -75.769106),  Route carried "on" structure: US 11,  Year Built: 1974,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 3,069 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,797 (year 2040),  Design Load: HS 20,  Features Intersected: DEKAYS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.834,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $655,000,  Roadway Improvement Cost: $384,000,  Total Project Cost: $1,039,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100807,  Location: JCT US 11 & I81 - EXIT 1 (Lat: 42.040767,  Lng: -75.795675),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 6,403 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 7,778 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 11,  Facility Carried by Structure: CONKLIN-KIRKWOOD C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,027,000,  Roadway Improvement Cost: $601,000,  Total Project Cost: $1,628,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 100808,  Location: 1.5 MI N OF EXIT 1 OF I81 (Lat: 42.061706,  Lng: -75.800889),  Route carried "on" structure: US 11,  Year Built: 2007,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,064 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,791 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: LANGDON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.351,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $137,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $216,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1008099,  Location: JCT RTE 11 + INT I-81+17 (Lat: 42.093022,  Lng: -75.825881),  Route carried "on" structure: US 11,  Year Built: 1947,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 10,795 (year 2009),  Truck Traffic: 16%,  Average Future Daily Traffic: 13,356 (year 2040),  Design Load: HL 93,  Features Intersected: PARK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.438,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 22.9m (75.1ft),  Out-to-Out Width: 23.9m (78.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 64.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,175,000,  Roadway Improvement Cost: $1,274,000,  Total Project Cost: $3,449,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100811,  Location: 1.6 MI SE E BING CITY LI (Lat: 42.095433,  Lng: -75.828056),  Route carried "on" structure: US 11,  Year Built: 1997,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 10,795 (year 2009),  Truck Traffic: 16%,  Average Future Daily Traffic: 13,113 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: RTE 990G
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.743,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 49.3m (161.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 58.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,569,000,  Roadway Improvement Cost: $919,000,  Total Project Cost: $2,488,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100813,  Location: 0.7 MI E OF E BING CTY LI (Lat: 42.102183,  Lng: -75.845144),  Route carried "on" structure: US 11,  Year Built: 1947,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 11,323 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,755 (year 2040),  Design Load: H 20,  Features Intersected: STRATTON MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.368,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 21.6m (70.9ft),  Out-to-Out Width: 22.2m (72.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,394,000,  Roadway Improvement Cost: $817,000,  Total Project Cost: $2,211,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100814,  Location: 0.5 MI E OF E BING CTY LI (Lat: 42.103250,  Lng: -75.848147),  Route carried "on" structure: US 11,  Year Built: 1947,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 11,323 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,755 (year 2040),  Design Load: H 20,  Features Intersected: ACRE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.642,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 22.3m (73.2ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $579,000,  Roadway Improvement Cost: $339,000,  Total Project Cost: $918,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1013111,  Location: 1.7 MI NW EXIT 2 OF I81 (Lat: 42.107556,  Lng: -75.845322),  Route carried "on" structure: Interstate 81,  Year Built: 1963,  Status: Open,  Structure Length: 10.42m (34.19ft),  Average Daily Traffic: 25,503 (year 2011),  Truck Traffic: 24%,  Average Future Daily Traffic: 35,704 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LOUGHLIN ROAD, ACRE CREE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.704,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.42m (34.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,009,000,  Roadway Improvement Cost: $1,762,000,  Total Project Cost: $4,771,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1013112,  Location: 1.7 MI NW EXIT 2 OF I81 (Lat: 42.108278,  Lng: -75.845492),  Route carried "on" structure: Interstate 81,  Year Built: 1963,  Status: Open,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 17,484 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 22,998 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LOUGHLIN ROAD, ACRE CREE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.704,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.72m (35.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,092,000,  Roadway Improvement Cost: $1,811,000,  Total Project Cost: $4,903,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 101312,  Location: 1.3 MI NW EXIT 2 OF I81 (Lat: 42.107514,  Lng: -75.835783),  Route carried "on" structure: Interstate 81,  Year Built: 1963,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 34,968 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 45,996 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: STRATTON MILL CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.867,  Lanes on structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.6m (129.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $599,000,  Roadway Improvement Cost: $351,000,  Total Project Cost: $949,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1013131,  Location: 0.9 MI NW EXIT 2 RTE I-81 (Lat: 42.104614,  Lng: -75.830878),  Route carried "on" structure: Interstate 81,  Year Built: 1987,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 25,503 (year 2011),  Truck Traffic: 24%,  Design Load: HS 20,  Features Intersected: COUNTY ROAD 52
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.304,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.9m (153.9ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 70.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.84m (15.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,173,000,  Roadway Improvement Cost: $1,272,000,  Total Project Cost: $3,445,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1013132,  Location: 0.9 MI NW EXIT 2 RTE I-81 (Lat: 42.104975,  Lng: -75.830069),  Route carried "on" structure: Interstate 81,  Year Built: 1987,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 17,484 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 22,998 (year 2040),  Design Load: HS 20,  Features Intersected: CR52 COLESVILLE R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.320,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.3m (102.7ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Excellent,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,966,000,  Roadway Improvement Cost: $1,152,000,  Total Project Cost: $3,118,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 101314,  Location: INT 2 I-81 (Lat: 42.100147,  Lng: -75.820447),  Route carried "on" structure: Interstate 86,  Year Built: 2012,  Status: Open,  Structure Length: 11.86m (38.91ft),  Average Daily Traffic: 12,690 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 16,692 (year 2040),  Design Load: HL 93,  Features Intersected: RTE I81, Stanley Hollow
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.323,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 52.1m (170.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.85m (38.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,196,000,  Roadway Improvement Cost: $1,872,000,  Total Project Cost: $5,068,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 101315,  Location: JCT RTS 990G & I-86 (Lat: 42.099519,  Lng: -75.814344),  Route carried "on" structure: Spur State highway 990G,  Year Built: 1963,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 3,692 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,278 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: RTE I86
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.529,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.6m (139.8ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.41m (14.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,927,000,  Roadway Improvement Cost: $1,129,000,  Total Project Cost: $3,056,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031071,  Location: 0.7 MI N PENNSYLVANIA LI (Lat: 42.006725,  Lng: -75.757325),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 12,237 (year 2009),  Truck Traffic: 33%,  Design Load: HS 20+Mod,  Features Intersected: GRANGE HALL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.078,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 73.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 56.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,338,000,  Roadway Improvement Cost: $783,000,  Total Project Cost: $2,121,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031072,  Location: 0.7 MI N PENNSYLVANIA LI (Lat: 42.007089,  Lng: -75.756303),  Route carried "on" structure: State highway 81,  Year Built: 1960,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 8,967 (year 2019),  Truck Traffic: 40%,  Average Future Daily Traffic: 11,794 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: GRANGE HALL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.126,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 57.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.38m (14.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,379,000,  Roadway Improvement Cost: $807,000,  Total Project Cost: $2,186,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031081,  Location: 1.7 MI N PENNSYLVANIA LI (Lat: 42.015850,  Lng: -75.772050),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 12,237 (year 2009),  Truck Traffic: 33%,  Design Load: HS 20+Mod,  Features Intersected: GORMAN ROAD, TRIB DEKAYS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.719,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,741,000,  Roadway Improvement Cost: $1,019,000,  Total Project Cost: $2,760,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031082,  Location: 1.7 MI N PENNSYLVANIA LI (Lat: 42.016397,  Lng: -75.771553),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 8,967 (year 2019),  Truck Traffic: 40%,  Average Future Daily Traffic: 11,794 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: GORMAN ROAD, TRIB DEKAYS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.719,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,680,000,  Roadway Improvement Cost: $984,000,  Total Project Cost: $2,664,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031091,  Location: 1.2 MI S EXIT 1 RTE I-81 (Lat: 42.025564,  Lng: -75.786211),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 12,237 (year 2009),  Truck Traffic: 33%,  Design Load: HS 20+Mod,  Features Intersected: BLAKESLY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.344,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,363,000,  Roadway Improvement Cost: $798,000,  Total Project Cost: $2,160,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031092,  Location: 1.2 MI S EXIT 1 RTE I-81 (Lat: 42.025611,  Lng: -75.784922),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 8,967 (year 2019),  Truck Traffic: 40%,  Average Future Daily Traffic: 11,794 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BLAKESLY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.360,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.51m (14.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,362,000,  Roadway Improvement Cost: $798,000,  Total Project Cost: $2,160,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031101,  Location: EXIT 1 RTE I-81 (Lat: 42.042544,  Lng: -75.793003),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 14,451 (year 2010),  Truck Traffic: 33%,  Design Load: HS 20+Mod,  Features Intersected: CEDARHURST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.372,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 77.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 59.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.32m (14.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,324,000,  Roadway Improvement Cost: $776,000,  Total Project Cost: $2,100,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031102,  Location: EXIT 1 RTE I-81 (Lat: 42.042833,  Lng: -75.792558),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 10,747 (year 2019),  Truck Traffic: 40%,  Average Future Daily Traffic: 14,136 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CEDARHURST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.372,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 57.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,385,000,  Roadway Improvement Cost: $811,000,  Total Project Cost: $2,195,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031111,  Location: 1.5 MI N EXIT 1 RTE I-81 (Lat: 42.062883,  Lng: -75.798839),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 14,451 (year 2010),  Truck Traffic: 31%,  Design Load: HS 20+Mod,  Features Intersected: LANGDON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.785,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 61.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $479,000,  Roadway Improvement Cost: $281,000,  Total Project Cost: $760,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1031112,  Location: 1.5 MI N EXIT 1 RTE I-81 (Lat: 42.063525,  Lng: -75.797886),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 10,747 (year 2019),  Truck Traffic: 34%,  Average Future Daily Traffic: 14,136 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LANGDON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.785,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 60.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $441,000,  Roadway Improvement Cost: $258,000,  Total Project Cost: $699,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1031121,  Location: 1.8 MI N EXIT 1 RTE I-81 (Lat: 42.067156,  Lng: -75.799269),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 14,451 (year 2010),  Truck Traffic: 31%,  Design Load: HS 20+Mod,  Features Intersected: TRIM STREET-CR 32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.187,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,168,000,  Roadway Improvement Cost: $684,000,  Total Project Cost: $1,851,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031122,  Location: 1.8 MI N EXIT 1 RTE I-81 (Lat: 42.067183,  Lng: -75.798797),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 10,747 (year 2019),  Truck Traffic: 34%,  Average Future Daily Traffic: 14,136 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: TRIM STREET-CR 32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.187,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,198,000,  Roadway Improvement Cost: $701,000,  Total Project Cost: $1,899,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031131,  Location: 2.1 MI N EXIT 1 RTE I-81 (Lat: 42.071192,  Lng: -75.800617),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 14,451 (year 2010),  Truck Traffic: 31%,  Design Load: HS 20+Mod,  Features Intersected: JOHNSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.638,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 60.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,199,000,  Roadway Improvement Cost: $702,000,  Total Project Cost: $1,902,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031132,  Location: 2.1 MI N EXIT 1 RTE I-81 (Lat: 42.071225,  Lng: -75.799983),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 10,747 (year 2019),  Truck Traffic: 34%,  Average Future Daily Traffic: 14,136 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: JOHNSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.654,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 60.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,413,000,  Roadway Improvement Cost: $828,000,  Total Project Cost: $2,241,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031141,  Location: 1.3 MI S EXIT 2 RTE I-81 (Lat: 42.081722,  Lng: -75.806414),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 14,451 (year 2010),  Truck Traffic: 31%,  Design Load: HS 20+Mod,  Features Intersected: OSTRUM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.909,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,399,000,  Roadway Improvement Cost: $819,000,  Total Project Cost: $2,218,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031142,  Location: 1.3 MI S EXIT 2 RTE I-81 (Lat: 42.081753,  Lng: -75.805867),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 10,747 (year 2019),  Truck Traffic: 34%,  Average Future Daily Traffic: 14,136 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: OSTRUM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.925,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,452,000,  Roadway Improvement Cost: $850,000,  Total Project Cost: $2,303,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103115,  Location: EXIT 2 OF I81 (Lat: 42.095153,  Lng: -75.814058),  Route carried "on" structure: Other road ,  Year Built: 1963,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 812 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,137 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: 81I 81I 91011078NB, RTE,  Facility Carried by Structure: FRANCIS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.75m (31.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,038,000,  Roadway Improvement Cost: $1,193,000,  Total Project Cost: $3,231,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031161,  Location: EXIT 2 RTE I-81 (Lat: 42.097758,  Lng: -75.818361),  Route carried "on" structure: Interstate 81,  Year Built: 1963,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 14,451 (year 2010),  Truck Traffic: 31%,  Design Load: HS 20+Mod,  Features Intersected: 990G990G91011008 SW, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.985,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.1m (75.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.55m (24.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,278,000,  Roadway Improvement Cost: $1,334,000,  Total Project Cost: $3,612,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1031162,  Location: EXIT 2 RTE I-81 (Lat: 42.097992,  Lng: -75.817069),  Route carried "on" structure: Interstate 81,  Year Built: 1963,  Status: Open,  Structure Length: 7.10m (23.29ft),  Average Daily Traffic: 10,747 (year 2019),  Truck Traffic: 34%,  Average Future Daily Traffic: 14,136 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 990G990G91011008 SW, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.985,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,158,000,  Roadway Improvement Cost: $1,264,000,  Total Project Cost: $3,422,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1031171,  Location: EXIT 2 RTE I-81 (Lat: 42.099258,  Lng: -75.821314),  Route carried "on" structure: Interstate 81,  Year Built: 1963,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 14,451 (year 2010),  Truck Traffic: 31%,  Average Future Daily Traffic: 20,231 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: Stanley Hollow Cr
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.371,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $426,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $676,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1031172,  Location: EXIT 2 RTE I-81 (Lat: 42.100231,  Lng: -75.820522),  Route carried "on" structure: Interstate 81,  Year Built: 1963,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 10,747 (year 2019),  Truck Traffic: 34%,  Average Future Daily Traffic: 14,136 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Stanley Hollow Cr
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 13.371,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $462,000,  Roadway Improvement Cost: $270,000,  Total Project Cost: $732,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 105019,  Location: JCT RTS 990F+17 CONNECTOR (Lat: 42.093953,  Lng: -75.823014),  Route carried "on" structure: Alternate State highway 990F,  Year Built: 1962,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 4,210 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,894 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Park Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 86.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $868,000,  Roadway Improvement Cost: $508,000,  Total Project Cost: $1,376,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1050201,  Location: Jct Rts 990G & 17 (Lat: 42.096436,  Lng: -75.821728),  Route carried "on" structure: State highway 990G,  Year Built: 2007,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 3,382 (year 2009),  Truck Traffic: 21%,  Average Future Daily Traffic: 4,108 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Park Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.0m (49.2ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 60.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $792,000,  Roadway Improvement Cost: $464,000,  Total Project Cost: $1,255,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Kirkwood, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.