Bridge Statistics for Lanesborough, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 59ft / 17.9mTotal length
  • $11,321,000Total costs
  • 51,387Total average daily traffic
  • 4,274Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lanesborough
  • No street view available for this location

New bridges in Lanesborough, MA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21940-1949
  • 51960-1969
  • 31980-1989
  • 32010-2019
Average Bridge Daily Traffic in Lanesborough, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 30.0%Good
  • 30.0%Satisfactory
  • 10.0%Fair
  • 10.0%Poor
  • 10.0%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.2%Very good
  • 18.2%Good
  • 36.4%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.2%Very good
  • 63.6%Satisfactory
  • 18.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Very good
  • 36.4%Good
  • 54.5%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: L030010DJDOT634,  Location: 0.1 MI W OF ST 8 (Lat: 42.493914,  Lng: -73.202542),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 4,440 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,947 (year 2032),  Design Load: HS 20,  Features Intersected: OTHER ASHUWILLTICOOK RT,  Facility Carried by Structure: HWY OLD STATE HW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $148,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $223,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L0300209VDOTNBI,  Location: 0.2 MI N OF BAILEY RD (Lat: 42.543475,  Lng: -73.231714),  Route carried "on" structure: US 7,  Year Built: 1948,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 5,806 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,223 (year 2032),  Design Load: H 20,  Features Intersected: WATER TOWN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.696,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $605,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $908,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: L0300309WDOTNBI,  Location: 0.7 MI. N. OF BAILEY ROAD (Lat: 42.550192,  Lng: -73.234506),  Route carried "on" structure: US 7,  Year Built: 1961,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 5,512 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,223 (year 2032),  Design Load: H 20,  Features Intersected: WATER TOWN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.468,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.6m (54.5ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,127,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,691,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L0300509XDOTNBI,  Location: 0.2 MI SOUTH OF SCOTT RD (Lat: 42.556881,  Lng: -73.235508),  Route carried "on" structure: US 7,  Year Built: 1961,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 5,512 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,223 (year 2032),  Design Load: H 20,  Features Intersected: WATER TOWN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.225,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.5m (60.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,297,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $1,946,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L0300709YDOTNBI,  Location: 0.2MI N OF BRODIE MTN. RD (Lat: 42.577083,  Lng: -73.249572),  Route carried "on" structure: US 7,  Year Built: 1961,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 6,983 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,223 (year 2032),  Design Load: H 20,  Features Intersected: WATER TOWN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 65.724,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.4m (37.4ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $746,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $1,120,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L03008055MUNNBI,  Location: .2 MI WEST OF ROUTE 7 (Lat: 42.504186,  Lng: -73.241056),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 4,009 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,263 (year 2032),  Features Intersected: WATER PONTOOSUC LAKE,  Facility Carried by Structure: HWY BULLHILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: November 2021,  Underwater Inspection Date: September 2019,  Bridge Improvement Cost: $574,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $862,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: L030099BKMUNNBI,  Location: 750' W. OF INT W/ ROUTE 7 (Lat: 42.509622,  Lng: -73.234928),  Route carried "on" structure: City street ,  Year Built: 2012,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 742 (year 2013),  Truck Traffic: 3%,  Design Load: HL 93,  Features Intersected: WATER TOWN BROOK,  Facility Carried by Structure: HWY MINER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $935,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L03010053MUNNBI,  Location: .1MI W OF INT W/ ROUTE 7 (Lat: 42.519978,  Lng: -73.229650),  Route carried "on" structure: City street ,  Year Built: 1945,  Status: Posted for load,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 517 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 948 (year 2032),  Design Load: H 20,  Features Intersected: WATER TOWN BROOK,  Facility Carried by Structure: HWY BRIDGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 7.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 3 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: September 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $590,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $886,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L03013ACEMUNNBI,  Location: E OF RTE 7 NORTH OF TOWN (Lat: 42.559500,  Lng: -73.237056),  Route carried "on" structure: City street ,  Year Built: 1938,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 129 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 158 (year 2032),  Design Load: H 15,  Features Intersected: WATER TOWN BROOK,  Facility Carried by Structure: HWY SCOTT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 61.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $220,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $331,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L030150A0DOTNBI,  Location: AT NEW ASHFORD TOWN LINE (Lat: 42.586994,  Lng: -73.250242),  Route carried "on" structure: US 7,  Year Built: 1961,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 6,789 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,223 (year 2032),  Design Load: H 20,  Features Intersected: WATER BRODIE MTN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.003,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $776,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L03016BN3MUNNBI,  Location: 200'E OF JCT W/ MEADOW LN (Lat: 42.516144,  Lng: -73.231964),  Route carried "on" structure: City street ,  Year Built: 2014,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 360 (year 2015),  Truck Traffic: 6%,  Design Load: HL 93,  Features Intersected: WATER TOWN BROOK,  Facility Carried by Structure: HWY PUTNAM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.8m (22.3ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: L03022589MUNNBI,  Location: WEST OF BERKSHIRE MALL (Lat: 42.491608,  Lng: -73.213542),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 2.67m (8.76ft),  Average Daily Traffic: 10,200 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,109 (year 2032),  Design Load: HS 20,  Features Intersected: HWY PARTRIDGE RD,  Facility Carried by Structure: HWY 7/8 CONNECT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.2m (79.4ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Inventory Rating: 74.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,095,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,643,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L03024BTXMUNNBI,  Location: OVER NW CORNER PNTSC LAKE (Lat: 42.504069,  Lng: -73.252683),  Route carried "on" structure: City street ,  Year Built: 2018,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 388 (year 2019),  Truck Traffic: 6%,  Design Load: HL 93,  Features Intersected: WATER PONTOOSUC LAKE,  Facility Carried by Structure: HWY NARRAGANSETT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: L03022589MUNNBI,  Location: WEST OF BERKSHIRE MALL (Lat: 42.491608,  Lng: -73.213542),  Route carried "under" structure: City street ,  Year Built: 1989,  Structure Length: 0. m,  Features Intersected: HWY PARTRIDGE RD,  Facility Carried by Structure: HWY 7/8 CONNECT
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.2m (79.4ft)

Discuss Lanesborough, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.