Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Long Lake, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 98ft / 30.4mTotal length
  • $15,730,000Total costs
  • 5,407Total average daily traffic
  • 797Total average daily truck traffic
  • 6,205Total future (year 2020) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Long Lake
  • No street view available for this location

New bridges in Long Lake, NY - historical statistics
  • New bridges - historical statistics
  • 51930-1939
  • 11940-1949
  • 11970-1979
  • 11980-1989
  • 31990-1999
  • 12010-2019
Reconstructed bridges in Long Lake, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Truck Traffic in Long Lake, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Excellent
  • 36.4%Very good
  • 27.3%Good
  • 9.1%Satisfactory
  • 18.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.3%Excellent
  • 18.2%Very good
  • 27.3%Good
  • 27.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.2%Very good
  • 36.4%Good
  • 18.2%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Excellent
  • 33.3%Very good
  • 16.7%Good
  • 33.3%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: 102047,  Location: 4.2 MI E JCT RTS 28N & 30 (Lat: 43.977978,  Lng: -74.336722),  Route carried "on" structure: State highway 28N,  Year Built: 1932,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 1,136 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,185 (year 2040),  Design Load: H 20,  Features Intersected: FISHING BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.199,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $415,000,  Roadway Improvement Cost: $243,000,  Total Project Cost: $658,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102124,  Location: .4 MI N JCT SH 28N & SH30 (Lat: 43.974525,  Lng: -74.425944),  Route carried "on" structure: State highway 30,  Year Built: 1940,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 994 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,072 (year 2040),  Design Load: HS 20,  Features Intersected: LONG LAKE
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 116.813,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 64.0m (210.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Bridge Improvement Cost: $5,003,000,  Roadway Improvement Cost: $2,930,000,  Total Project Cost: $7,932,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102125,  Location: 3.9 MI NW JCT RT 28N & 30 (Lat: 44.002769,  Lng: -74.480247),  Route carried "on" structure: State highway 30,  Year Built: 1938,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 994 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,072 (year 2040),  Design Load: HS 20,  Features Intersected: BIG BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 122.509,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Poor,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $467,000,  Roadway Improvement Cost: $273,000,  Total Project Cost: $740,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102126,  Location: 96 MI NW JCT RTS 30+28N (Lat: 44.072469,  Lng: -74.519258),  Route carried "on" structure: State highway 30,  Year Built: 1938,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 994 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,072 (year 2040),  Design Load: H 20,  Features Intersected: BOG STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 131.520,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $395,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $627,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 107995,  Location: 8 miles East of Long Lake (Lat: 43.987528,  Lng: -74.291256),  Route carried "on" structure: ServiceState lands road ,  Year Built: 2016,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 10 (year 2016),  Average Future Daily Traffic: 14 (year 2036),  Features Intersected: Fishing Brook,  Facility Carried by Structure: Kempshall Mountain
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Agenciy,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 3.3m (10.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 83.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $93,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $148,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 225548,  Location: 3 MILES SOUTH OF SH 28 (Lat: 43.770569,  Lng: -74.636847),  Route carried "on" structure: State lands road ,  Year Built: 1996,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 48 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 67 (year 2039),  Design Load: HS 20,  Features Intersected: RAQUETTE LK S IN,  Facility Carried by Structure: SAGAMORE LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: State Agenciy,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Channel: Very good,  Operating Rating: 92.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $399,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 225549,  Location: 3.5 MI SO OF RTE 28 (Lat: 43.764794,  Lng: -74.630675),  Route carried "on" structure: State lands road ,  Year Built: 1996,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 176 (year 2000),  Truck Traffic: 10%,  Average Future Daily Traffic: 246 (year 2020),  Design Load: HS 20,  Features Intersected: SAGAMORE LK OUTL,  Facility Carried by Structure: SAGAMORE LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Agenciy,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $1,100,000,  Roadway Improvement Cost: $644,000,  Total Project Cost: $1,744,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 330719,  Location: 8 MI NE OF INLET (Lat: 43.810658,  Lng: -74.656900),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 682 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 955 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: BROWNS TRACT INLET,  Facility Carried by Structure: CR2 RAQUETTE LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $503,000,  Roadway Improvement Cost: $295,000,  Total Project Cost: $798,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33072,  Location: 8.7 MI SW DEERLAND & SH30 (Lat: 43.886497,  Lng: -74.586233),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 5.64m (18.50ft),  Average Daily Traffic: 68 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 95 (year 2037),  Design Load: HS 20,  Features Intersected: RAQUETTE LAKE OUTLET,  Facility Carried by Structure: CR3 NORTH POINT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.068,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.63m (18.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $738,000,  Roadway Improvement Cost: $432,000,  Total Project Cost: $1,170,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330721,  Location: 0.4 MI SW OF DEERLAND (Lat: 43.935417,  Lng: -74.461814),  Route carried "on" structure: County highway ,  Year Built: 1930,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 68 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 95 (year 2037),  Design Load: H 20,  Features Intersected: SOUTH POND OUTLET,  Facility Carried by Structure: CR3 NORTH POINT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.699,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $249,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $395,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33073,  Location: NE END LITTLE TUPPER LAKE (Lat: 44.054161,  Lng: -74.564250),  Route carried "on" structure: County highway ,  Year Built: 1939,  Status: Posted for load,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 145 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 203 (year 2036),  Design Load: H 20,  Features Intersected: OUTLET LITTLE TUPPER LAK,  Facility Carried by Structure: CR10 SABATTIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.888,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 13.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 10.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $416,000,  Roadway Improvement Cost: $243,000,  Total Project Cost: $659,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330731,  Location: 9.4 MI NW OF LONG LAKE (Lat: 44.054203,  Lng: -74.559781),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 92 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 129 (year 2036),  Features Intersected: BOG STREAM,  Facility Carried by Structure: CR10A CIRCLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.586,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $460,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Long Lake, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.