Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Louisville, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 52Number of bridges
  • 604ft / 184mTotal length
  • $972,000Total costs
  • 100,475Total average daily traffic
  • 11,821Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Louisville
  • No street view available for this location

New bridges in Louisville, MS - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 151970-1979
  • 61980-1989
  • 71990-1999
  • 192000-2009
  • 32010-2019
  • 12020-2022
Average Bridge Daily Traffic in Louisville, MS
Average Bridge Truck Traffic in Louisville, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.8%Very good
  • 59.3%Good
  • 22.2%Satisfactory
  • 3.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 51.9%Very good
  • 37.0%Good
  • 11.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 48.1%Very good
  • 44.4%Good
  • 7.4%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 24.3%Very good
  • 32.4%Good
  • 24.3%Satisfactory
  • 16.2%Fair
  • 2.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 5.9%Excellent
  • 29.4%Very good
  • 52.9%Good
  • 5.9%Satisfactory
  • 5.9%Fair
Find on map >>   Show street view

Structure Number: 31000150801921A,  Location: SR 15 SOUTH OVER SR 25 (Lat: 33.107719,  Lng: -89.080000),  Route carried "under" structure: State highway 25,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 2,350 (year 2017),  Truck Traffic: 8%,  Features Intersected: SR 25,  Facility Carried by Structure: SR 15
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 30.792,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 31000150801921A,  Location: SR 15 SOUTH OVER SR 25 (Lat: 33.107861,  Lng: -89.080281),  Route carried "under" structure: State highway 25,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 2,350 (year 2017),  Truck Traffic: 8%,  Features Intersected: SR 25,  Facility Carried by Structure: SR 15
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 25.991,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 31000150801921B,  Location: SR 15 SOUTH OVER SR 25 (Lat: 33.108069,  Lng: -89.080261),  Route carried "under" structure: State highway 25,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 2,300 (year 2017),  Truck Traffic: 8%,  Features Intersected: SR 25,  Facility Carried by Structure: SR 15
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 25.968,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 31000150801921B,  Location: SR 15 SOUTH OVER SR 25 (Lat: 33.107919,  Lng: -89.079981),  Route carried "under" structure: State highway 25,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 2,300 (year 2017),  Truck Traffic: 8%,  Features Intersected: SR 25,  Facility Carried by Structure: SR 15
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 30.814,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 31000250800396A,  Location: SR 25 OVER SR 15 NORTH (Lat: 33.157061,  Lng: -89.087369),  Route carried "under" structure: State highway 15,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 1,250 (year 2017),  Truck Traffic: 5%,  Features Intersected: SR 15,  Facility Carried by Structure: SR 25
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 1.699,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 31000250800396A,  Location: SR 25 OVER SR 15 NORTH (Lat: 33.157369,  Lng: -89.087069),  Route carried "under" structure: State highway 15,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 1,250 (year 2017),  Truck Traffic: 5%,  Features Intersected: SR 15,  Facility Carried by Structure: SR 25
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 26.409,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 31000250800396B,  Location: SR 25 OVER SR 15 NORTH (Lat: 33.156700,  Lng: -89.087181),  Route carried "under" structure: State highway 15,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 3,450 (year 2017),  Truck Traffic: 5%,  Features Intersected: SR 15,  Facility Carried by Structure: SR 25
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 1.743,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 31000250800396B,  Location: SR 25 OVER SR 15 NORTH (Lat: 33.157011,  Lng: -89.086889),  Route carried "under" structure: State highway 15,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 3,450 (year 2017),  Truck Traffic: 5%,  Features Intersected: SR 15,  Facility Carried by Structure: SR 25
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 26.366,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Discuss Louisville, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.