Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Maryville, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 43Number of bridges
  • 407ft / 124mTotal length
  • $6,644,000Total costs
  • 163,500Total average daily traffic
  • 27,497Total average daily truck traffic
  • 223,130Total future (year 2041) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Maryville
  • No street view available for this location

New bridges in Maryville, MO - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 81930-1939
  • 11960-1969
  • 41970-1979
  • 81980-1989
  • 61990-1999
  • 62000-2009
  • 62010-2019
  • 32020-2022
Reconstructed bridges in Maryville, MO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
Average Bridge Daily Traffic in Maryville, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.6%Excellent
  • 25.0%Very good
  • 47.2%Good
  • 11.1%Satisfactory
  • 2.8%Fair
  • 8.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Excellent
  • 16.7%Very good
  • 55.6%Good
  • 8.3%Satisfactory
  • 5.6%Fair
  • 5.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Excellent
  • 13.9%Very good
  • 38.9%Good
  • 19.4%Satisfactory
  • 8.3%Fair
  • 8.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.4%Excellent
  • 4.8%Very good
  • 2.4%Good
  • 35.7%Satisfactory
  • 45.2%Fair
  • 9.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 28.6%Very good
  • 57.1%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 9126,  Location: S 13 T 43 N R 19 W (Lat: 38.508344,  Lng: -93.531414),  Route carried "on" structure: State highway Y,  Year Built: 1934,  Status: Posted for load,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 937 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,406 (year 2041),  Design Load: H 10,  Features Intersected: E TEBO CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.031,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.0m (39.4ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 17.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 8.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 0.46m (1.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $525,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $788,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Maryville, Missouri (MO) on our hugely popular Missouri forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.