Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Mountain Home, Arkansas (AR)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 46Number of bridges
  • 669ft / 204mTotal length
  • $4,341,000Total costs
  • 185,812Total average daily traffic
  • 2,302Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mountain Home
  • No street view available for this location

New bridges in Mountain Home, AR - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21930-1939
  • 31940-1949
  • 41960-1969
  • 31970-1979
  • 151980-1989
  • 101990-1999
  • 52000-2009
  • 12010-2019
Reconstructed bridges in Mountain Home, AR - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 21980-1989
  • 11990-1999
  • 22000-2009
  • 22010-2019
Average Bridge Daily Traffic in Mountain Home, AR
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 70.0%Good
  • 20.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 65.0%Good
  • 10.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 55.0%Good
  • 35.0%Satisfactory
  • 5.0%Fair
  • 5.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.5%Excellent
  • 27.3%Very good
  • 43.2%Good
  • 22.7%Satisfactory
  • 2.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 12.5%Very good
  • 70.8%Good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: AHTD000000M3875,  Location: 13 MI SE of Mountain Home (Lat: 36.248333,  Lng: -92.237778),  Route carried "on" structure: State highway 177,  Year Built: 1944,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 17.55m (57.58ft),  Average Daily Traffic: 2,800 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,860 (year 2039),  Design Load: HS 20,  Features Intersected: Norfork Dam Spillway
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Corps of Engineers (Civil),  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 14.5m (47.6ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.55m (57.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $825,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 593,  Location: 1.55 MI E OF JCT US 62 B (Lat: 36.327231,  Lng: -92.354461),  Route carried "under" structure: US 62,  Structure Length: 0. m,  Average Daily Traffic: 4,100 (year 2014),  Truck Traffic: 1%,  Features Intersected: US 62,  Facility Carried by Structure: SH 5 Baxter
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 17.333,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 593,  Location: 1.55 MI E OF JCT US 62 B (Lat: 36.327231,  Lng: -92.354461),  Route carried "under" structure: US 62,  Structure Length: 0. m,  Average Daily Traffic: 4,100 (year 2014),  Truck Traffic: 1%,  Features Intersected: US 62,  Facility Carried by Structure: SH 5 Baxter
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 17.333,  Length of Maximum Span: 0.0m

Discuss Mountain Home, Arkansas (AR) on our hugely popular Arkansas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.