Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Mountain Top, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 46Number of bridges
  • 259ft / 78.5mTotal length
  • $5,982,000Total costs
  • 286,006Total average daily traffic
  • 75,489Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mountain Top
  • No street view available for this location

New bridges in Mountain Top, PA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 51920-1929
  • 41930-1939
  • 11940-1949
  • 21950-1959
  • 231960-1969
  • 21980-1989
  • 31990-1999
  • 52010-2019
Reconstructed bridges in Mountain Top, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 21950-1959
  • 01960-1969
  • 51970-1979
  • 41980-1989
  • 01990-1999
  • 32000-2009
  • 22010-2019
Average Bridge Daily Traffic in Mountain Top, PA
Average Bridge Truck Traffic in Mountain Top, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.4%Very good
  • 27.6%Good
  • 31.0%Satisfactory
  • 24.1%Fair
  • 13.8%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.3%Excellent
  • 10.0%Very good
  • 20.0%Good
  • 16.7%Satisfactory
  • 36.7%Fair
  • 10.0%Poor
  • 3.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.3%Very good
  • 13.3%Good
  • 30.0%Satisfactory
  • 40.0%Fair
  • 13.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.8%Very good
  • 38.5%Good
  • 23.1%Satisfactory
  • 23.1%Fair
  • 11.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Good
  • 33.3%Fair
  • 33.3%Poor
  • 16.7%Serious
Find on map >>   Show street view

Structure Number: 23716,  Location: RICE TWP 2 M S SR 2042 (Lat: 41.121442,  Lng: -75.962144),  Route carried "under" structure: Interstate 81,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 19,175 (year 2021),  Truck Traffic: 32%,  Features Intersected: SR 0081 I-81 NB,  Facility Carried by Structure: SR 3102 TWP RD 399
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 27.850,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 23717,  Location: RICE TWP 2 M S SR 2042 (Lat: 41.121775,  Lng: -75.961508),  Route carried "under" structure: Interstate 81,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 18,874 (year 2021),  Truck Traffic: 32%,  Features Intersected: SR 0081 I-81 SB,  Facility Carried by Structure: SR 3102 TWP RD 399
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 27.809,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 2372,  Location: RICE TWP 1 M S SR 2042 (Lat: 41.133639,  Lng: -75.962328),  Route carried "under" structure: County highway ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 1992),  Truck Traffic: 1%,  Features Intersected: BLYTHEBURN ROAD,  Facility Carried by Structure: I-81 NB
Minimum Vertical Clearance: 4.36m (14.30ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 23722,  Location: RICE TWP 1 M S SR 2042 (Lat: 41.134256,  Lng: -75.963206),  Route carried "under" structure: County highway ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 1992),  Features Intersected: BLYTHEBURN ROAD,  Facility Carried by Structure: SR 0081 I-81 SB
Minimum Vertical Clearance: 4.48m (14.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 24146,  Location: RICE TWP OVER I-81 SB (Lat: 41.146906,  Lng: -75.963694),  Route carried "under" structure: Interstate 81,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 21,315 (year 2021),  Truck Traffic: 28%,  Features Intersected: SR 0081 I-81 SB EXIT 159,  Facility Carried by Structure: SR 2042
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 31.023,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 24147,  Location: RICE TWP OVER I-81 NB (Lat: 41.146964,  Lng: -75.962517),  Route carried "under" structure: Interstate 81,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 21,036 (year 2021),  Truck Traffic: 28%,  Features Intersected: SR 0081 I-81 NB EXIT 159,  Facility Carried by Structure: SR 2042
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 31.059,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 18.3m (60.0ft)

Discuss Mountain Top, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.