Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New Albany, Indiana (IN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 119Number of bridges
  • 1,184ft / 361mTotal length
  • $4,840,000Total costs
  • 1,836,648Total average daily traffic
  • 131,127Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New Albany
  • No street view available for this location

New bridges in New Albany, IN - historical statistics
  • New bridges - historical statistics
  • 61920-1929
  • 41930-1939
  • 51940-1949
  • 41950-1959
  • 391960-1969
  • 421970-1979
  • 81980-1989
  • 41990-1999
  • 32000-2009
  • 42010-2019
Reconstructed bridges in New Albany, IN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 11950-1959
  • 31960-1969
  • 21970-1979
  • 131980-1989
  • 161990-1999
  • 42000-2009
  • 82010-2019
Average Bridge Daily Traffic in New Albany, IN
Average Bridge Truck Traffic in New Albany, IN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.4%Very good
  • 32.4%Good
  • 41.2%Satisfactory
  • 17.6%Fair
  • 1.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 32.9%Good
  • 31.4%Satisfactory
  • 18.6%Fair
  • 2.9%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.7%Very good
  • 57.1%Good
  • 28.6%Satisfactory
  • 5.7%Fair
  • 2.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.8%Very good
  • 40.4%Good
  • 42.3%Satisfactory
  • 9.6%Fair
  • 1.9%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 22.2%Very good
  • 44.4%Good
  • 22.2%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 220011,  Location: 0.15 MI. N CHARLESTOWN RD (Lat: 38.355461,  Lng: -85.794431),  Route carried "on" structure: City street ,  Year Built: 2016,  Status: Open,  Structure Length: 1.91m (6.27ft),  Average Future Daily Traffic: 500 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: JACOBS CREEK,  Facility Carried by Structure: ENDRES PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2200112,  Location: 00.10 S of RENN ROAD (Lat: 38.395631,  Lng: -85.845450),  Route carried "on" structure: Alternate County highway ,  Year Built: 2019,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 244 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 359 (year 2036),  Design Load: HL 93,  Features Intersected: BRANCH of BIG INDIAN CR.,  Facility Carried by Structure: ATKINS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 57.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 256,  Location: 02.50 N SR-311 (Lat: 38.336250,  Lng: -85.817856),  Route carried "under" structure: Interstate 265,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 27,362 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-265 EBL,  Facility Carried by Structure: SR 111X
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 5.150,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.7m (107.3ft)

Find on map >>   Show street view

Structure Number: 256,  Location: 02.50 N SR-311 (Lat: 38.336250,  Lng: -85.817856),  Route carried "under" structure: Interstate 265,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 27,362 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-265 WBL,  Facility Carried by Structure: SR 111X
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 5.150,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.7m (107.3ft)

Find on map >>   Show street view

Structure Number: 2764,  Location: 08.81 E SR 335 (Lat: 38.303219,  Lng: -85.890342),  Route carried "under" structure: Interstate 64,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 26,573 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-64 EBL,  Facility Carried by Structure: US 150 EB
Minimum Vertical Clearance: 6.78m (22.24ft),  Kilometerpoint: 191.496,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 2764,  Location: 08.81 E SR 335 (Lat: 38.303219,  Lng: -85.890342),  Route carried "under" structure: Interstate 64,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 26,573 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-64 WBL,  Facility Carried by Structure: US 150 EB
Minimum Vertical Clearance: 6.86m (22.51ft),  Kilometerpoint: 191.496,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 2765,  Location: 08.81 E SR 335 (Lat: 38.303281,  Lng: -85.890114),  Route carried "under" structure: Interstate 64,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 26,573 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-64 EBL,  Facility Carried by Structure: US 150 WB
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 191.496,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 2765,  Location: 08.81 E SR 335 (Lat: 38.303281,  Lng: -85.890114),  Route carried "under" structure: Interstate 64,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 26,573 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-64 WBL,  Facility Carried by Structure: US 150 WB
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 191.496,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 3128,  Location: 03.04 S SR-60 (Lat: 38.343911,  Lng: -85.798722),  Route carried "under" structure: Interstate 265,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 23,184 (year 2004),  Truck Traffic: 9%,  Features Intersected: I-265 EBL,  Facility Carried by Structure: SR 311
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 7.049,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.6m (113.5ft)

Find on map >>   Show street view

Structure Number: 3128,  Location: 03.04 S SR-60 (Lat: 38.343911,  Lng: -85.798722),  Route carried "under" structure: Interstate 265,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 23,184 (year 2004),  Truck Traffic: 9%,  Features Intersected: I-265 WBL,  Facility Carried by Structure: SR 311
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 7.049,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.6m (113.5ft)

Find on map >>   Show street view

Structure Number: 3439,  Location: 00.73 E US 150 (Lat: 38.303481,  Lng: -85.878844),  Route carried "under" structure: County highway ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 132 (year 2004),  Truck Traffic: 5%,  Features Intersected: QUARRY ROAD,  Facility Carried by Structure: I-64 EBL
Minimum Vertical Clearance: 9.30m (30.51ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.9m (58.7ft)

Find on map >>   Show street view

Structure Number: 344,  Location: 00.73 E US 150 (Lat: 38.303750,  Lng: -85.878783),  Route carried "under" structure: County highway ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 132 (year 2004),  Truck Traffic: 5%,  Features Intersected: QUARRY ROAD,  Facility Carried by Structure: I-64 WBL
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.4m (47.2ft)

Find on map >>   Show street view

Structure Number: 3441,  Location: 02.11 E US-150 (Lat: 38.302011,  Lng: -85.851394),  Route carried "under" structure: Ramp Interstate 265,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 15,748 (year 2004),  Truck Traffic: 5%,  Features Intersected: I-64 WB,  Facility Carried by Structure: I64 EB RAMP TO I26
Minimum Vertical Clearance: 6.86m (22.51ft),  Kilometerpoint: 0.209,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 3442,  Location: 02.20 E US 150 (Lat: 38.301769,  Lng: -85.850128),  Route carried "under" structure: Ramp Interstate 265,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 9,645 (year 2004),  Truck Traffic: 5%,  Features Intersected: I265 EB RAMP TO I64 EB,  Facility Carried by Structure: I-64 WB
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.209,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 3443,  Location: 00.29 E I-265 (Lat: 38.299561,  Lng: -85.847000),  Route carried "under" structure: County highway ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 118 (year 2004),  Truck Traffic: 5%,  Features Intersected: CAPTAIN FRANK ROAD,  Facility Carried by Structure: I-64 EB
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.1m (49.5ft)

Find on map >>   Show street view

Structure Number: 3444,  Location: 00.29 E I-265 (Lat: 38.300361,  Lng: -85.846419),  Route carried "under" structure: County highway ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 118 (year 2004),  Truck Traffic: 5%,  Features Intersected: CAPTAIN FRANK ROAD,  Facility Carried by Structure: I-64 WB
Minimum Vertical Clearance: 11.74m (38.52ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.1m (69.2ft)

Find on map >>   Show street view

Structure Number: 3445,  Location: 00.85 W SR 111 (Lat: 38.290700,  Lng: -85.835136),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 6,262 (year 2005),  Truck Traffic: 5%,  Features Intersected: CHERRY STREET,  Facility Carried by Structure: I-64
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.1m (82.3ft)

Find on map >>   Show street view

Structure Number: 3447,  Location: 00.28 W SR-111 (Lat: 38.285369,  Lng: -85.828331),  Route carried "under" structure: Ramp Interstate 64,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 18,276 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-64 RAMP 123D TO I64 WB
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.4m (37.4ft)

Find on map >>   Show street view

Structure Number: 3448,  Location: 00.18 W SR-111 (Lat: 38.284319,  Lng: -85.828086),  Route carried "under" structure: Alternate State highway 62,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 12,730 (year 2004),  Truck Traffic: 5%,  Features Intersected: SR-62X/SPRING STREET,  Facility Carried by Structure: I-64
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.097,  Lanes on structure: 8,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.5m (70.5ft)

Find on map >>   Show street view

Structure Number: 3449,  Location: 00.11 W SR-111 (Lat: 38.283361,  Lng: -85.827178),  Route carried "under" structure: City street ,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 7,558 (year 2004),  Truck Traffic: 5%,  Features Intersected: MARKET STREET,  Facility Carried by Structure: I-64 EB
Minimum Vertical Clearance: 6.27m (20.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.2m (56.4ft)

Find on map >>   Show street view

Structure Number: 345,  Location: 00.11 W SR-111 (Lat: 38.283431,  Lng: -85.826964),  Route carried "under" structure: City street ,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 7,558 (year 2004),  Truck Traffic: 5%,  Features Intersected: MARKET STREET,  Facility Carried by Structure: I-64 WB
Minimum Vertical Clearance: 7.42m (24.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.2m (56.4ft)

Find on map >>   Show street view

Structure Number: 3451,  Location: 04.02 E US 150 (Lat: 38.282319,  Lng: -85.826089),  Route carried "under" structure: State highway 111,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 15,444 (year 2004),  Truck Traffic: 10%,  Features Intersected: SR-111/MAIN STREET,  Facility Carried by Structure: I-64 EB
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 13.438,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.9m (78.4ft)

Find on map >>   Show street view

Structure Number: 34515,  Location: 04.11 E US-150 (Lat: 38.282061,  Lng: -85.825508),  Route carried "under" structure: State highway 111,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 14,032 (year 2004),  Truck Traffic: 5%,  Features Intersected: SR-111/MAIN STREET,  Facility Carried by Structure: I-64 WB
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 13.454,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.7m (84.3ft)

Find on map >>   Show street view

Structure Number: 3452,  Location: 00.11 E of SR 111 (Lat: 38.279289,  Lng: -85.822875),  Route carried "under" structure: City street ,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 130 (year 2009),  Truck Traffic: 5%,  Features Intersected: WATER STEET,  Facility Carried by Structure: I-64
Minimum Vertical Clearance: 9.75m (31.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Arch - Thru,  Length of Maximum Span: 243.8m (799.9ft)

Find on map >>   Show street view

Structure Number: 4951,  Location: 00.25 E I-64 (Lat: 38.302639,  Lng: -85.850517),  Route carried "under" structure: Ramp Interstate 265,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 15,748 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-265 RAMP B (WBL)
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.483,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 4952,  Location: 00.84 E I-64 (Lat: 38.310839,  Lng: -85.845664),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2004),  Truck Traffic: 10%,  Features Intersected: STATE STREET NBL,  Facility Carried by Structure: I-265 EB
Minimum Vertical Clearance: 6.76m (22.18ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.8m (71.5ft)

Find on map >>   Show street view

Structure Number: 4952,  Location: 00.84 E I-64 (Lat: 38.310839,  Lng: -85.845664),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2004),  Truck Traffic: 10%,  Features Intersected: STATE STREET SBL,  Facility Carried by Structure: I-265 EB
Minimum Vertical Clearance: 6.76m (22.18ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.8m (71.5ft)

Find on map >>   Show street view

Structure Number: 4953,  Location: 00.84 E I-64 (Lat: 38.311031,  Lng: -85.845878),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2004),  Truck Traffic: 10%,  Features Intersected: STATE STREET NBL,  Facility Carried by Structure: I-265 WB
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.1m (69.2ft)

Find on map >>   Show street view

Structure Number: 4953,  Location: 00.84 E I-64 (Lat: 38.311031,  Lng: -85.845878),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2004),  Truck Traffic: 10%,  Features Intersected: STATE STREET SBL,  Facility Carried by Structure: I-265 WB
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.1m (69.2ft)

Find on map >>   Show street view

Structure Number: 49535,  Location: 00.84 E I-64 (Lat: 38.310781,  Lng: -85.845567),  Route carried "under" structure: City street ,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2004),  Truck Traffic: 10%,  Features Intersected: STATE STREET SBL,  Facility Carried by Structure: I-265 RAMP C (EB)
Minimum Vertical Clearance: 7.80m (25.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.4m (70.2ft)

Find on map >>   Show street view

Structure Number: 49535,  Location: 00.84 E I-64 (Lat: 38.310781,  Lng: -85.845567),  Route carried "under" structure: City street ,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2004),  Truck Traffic: 10%,  Features Intersected: STATE STREET NBL,  Facility Carried by Structure: I-265 RAMP C (EB)
Minimum Vertical Clearance: 7.80m (25.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.4m (70.2ft)

Find on map >>   Show street view

Structure Number: 4954,  Location: 01.29 W SR-111 (Lat: 38.324561,  Lng: -85.836533),  Route carried "under" structure: Interstate 265,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 27,363 (year 2004),  Truck Traffic: 7%,  Features Intersected: I-265 WBL,  Facility Carried by Structure: GREEN VALLEY ROAD
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 3.074,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 4954,  Location: 01.29 W SR-111 (Lat: 38.324561,  Lng: -85.836533),  Route carried "under" structure: Interstate 265,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 27,363 (year 2004),  Truck Traffic: 7%,  Features Intersected: I-265 EBL,  Facility Carried by Structure: GREEN VALLEY ROAD
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 3.074,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 4955,  Location: 00.50 W SR-111 (Lat: 38.332111,  Lng: -85.825242),  Route carried "under" structure: County highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 8,752 (year 2004),  Truck Traffic: 7%,  Features Intersected: MOUNT TABOR ROAD,  Facility Carried by Structure: I-265 EB
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 4956,  Location: 00.50 W SR-111 (Lat: 38.332119,  Lng: -85.825675),  Route carried "under" structure: County highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 8,752 (year 2004),  Truck Traffic: 7%,  Features Intersected: MOUNT TABOR ROAD,  Facility Carried by Structure: I-265 WB
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 49585,  Location: 00.40 E SR-111 (Lat: 38.339281,  Lng: -85.811553),  Route carried "under" structure: Interstate 265,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 27,676 (year 2004),  Truck Traffic: 7%,  Features Intersected: I-265 EBL,  Facility Carried by Structure: KLERNER LANE
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 5.794,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 49585,  Location: 00.40 E SR-111 (Lat: 38.339281,  Lng: -85.811553),  Route carried "under" structure: Interstate 265,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 27,676 (year 2004),  Truck Traffic: 7%,  Features Intersected: I-265 WBL,  Facility Carried by Structure: KLERNER LANE
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 5.794,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 4959,  Location: 00.43 E SR-311 (Lat: 38.344539,  Lng: -85.790756),  Route carried "under" structure: Interstate 265,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 23,184 (year 2004),  Truck Traffic: 5%,  Features Intersected: I-265 WBL,  Facility Carried by Structure: PAYNE-KOEHLER ROAD
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 7.741,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 4959,  Location: 00.43 E SR-311 (Lat: 38.344539,  Lng: -85.790756),  Route carried "under" structure: Interstate 265,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 23,184 (year 2004),  Truck Traffic: 5%,  Features Intersected: I-265 EBL,  Facility Carried by Structure: PAYNE-KOEHLER ROAD
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 7.741,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 4962,  Location: 00.89 W I-65 (Lat: 38.345269,  Lng: -85.768867),  Route carried "under" structure: ServiceCity street ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2004),  Truck Traffic: 50%,  Features Intersected: ADMORE LANE,  Facility Carried by Structure: I-265 EB
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.9m (91.5ft)

Find on map >>   Show street view

Structure Number: 4963,  Location: 00.89 W I-65 (Lat: 38.345500,  Lng: -85.768744),  Route carried "under" structure: ServiceCity street ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2004),  Truck Traffic: 50%,  Features Intersected: ACCESS ROAD,  Facility Carried by Structure: I-265 WB
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.9m (91.5ft)

Find on map >>   Show street view

Structure Number: 1000145,  Location: 00.58 W SR 131 (Lat: 38.300519,  Lng: -85.791747),  Route carried "under" structure: Ramp County highway ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 3,781 (year 2012),  Truck Traffic: 5%,  Features Intersected: SPRING ST TO PROVIDENCE,  Facility Carried by Structure: BROWNS STATION WAY
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Discuss New Albany, Indiana (IN) on our hugely popular Indiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.