Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for North East, Maryland (MD)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 41Number of bridges
  • 495ft / 151mTotal length
  • $16,853,000Total costs
  • 470,893Total average daily traffic
  • 47,634Total average daily truck traffic
  • 626,424Total future (year 2026) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for North East
  • No street view available for this location

New bridges in North East, MD - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 51930-1939
  • 41940-1949
  • 11950-1959
  • 101960-1969
  • 11970-1979
  • 31980-1989
  • 61990-1999
  • 52000-2009
  • 42010-2019
  • 12020-2022
Reconstructed bridges in North East, MD - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41980-1989
  • 61990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in North East, MD
Average Bridge Truck Traffic in North East, MD
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 37.1%Good
  • 37.1%Satisfactory
  • 5.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 22.2%Very good
  • 33.3%Good
  • 30.6%Satisfactory
  • 11.1%Fair
  • 2.8%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 36.1%Good
  • 44.4%Satisfactory
  • 5.6%Fair
  • 2.8%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 17.2%Very good
  • 34.5%Good
  • 37.9%Satisfactory
  • 6.9%Fair
  • 3.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Good
  • 60.0%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 10000007000801,  Location: 0.56 MILE SOUTH OF MD 272 (Lat: 39.599922,  Lng: -75.953114),  Route carried "on" structure: State highway 7C,  Year Built: 1931,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 2,360 (year 2009),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,617 (year 2026),  Features Intersected: STONY RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.935,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $103,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10000007000901,  Location: 0.27 MILE SOUTH OF MD 272 (Lat: 39.600369,  Lng: -75.948050),  Route carried "on" structure: State highway 7C,  Year Built: 1921,  Status: Open,  Structure Length: 3.61m (11.84ft),  Average Daily Traffic: 2,360 (year 2009),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,617 (year 2026),  Features Intersected: NORTHEAST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.401,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 89.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Underwater Inspection Date: July 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $276,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10000007001001,  Location: 2.34 MILE NORTH OF MD 272 (Lat: 39.603289,  Lng: -75.898983),  Route carried "on" structure: State highway 7C,  Year Built: 1991,  Status: Open,  Structure Length: 10.76m (35.30ft),  Average Daily Traffic: 4,860 (year 2009),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,249 (year 2026),  Design Load: HS 20,  Features Intersected: AMTRAK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.714,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 49.7m (163.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 10000007001103,  Location: 1.84 MILES SOUTH OF US 40 (Lat: 39.604556,  Lng: -75.887194),  Route carried "on" structure: State highway 7C,  Year Built: 1987,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4,860 (year 2009),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,249 (year 2026),  Design Load: HS 20,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.695,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 10000007001502,  Location: 0.37 MILE WEST OF MD 272 (Lat: 39.606075,  Lng: -75.954231),  Route carried "on" structure: US 40,  Year Built: 1940,  Status: Open,  Structure Length: 1.53m (5.02ft),  Average Daily Traffic: 21,540 (year 2009),  Truck Traffic: 8%,  Average Future Daily Traffic: 23,488 (year 2026),  Design Load: H 20,  Features Intersected: STONY RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.759,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 23 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 100000070016013,  Location: 0.54 MILE EAST OF MD 272 (Lat: 39.611578,  Lng: -75.938886),  Route carried "on" structure: US 40,  Year Built: 1939,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 14,917 (year 2012),  Truck Traffic: 12%,  Average Future Daily Traffic: 22,376 (year 2032),  Design Load: HS 20,  Features Intersected: NORTHEAST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.211,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100000070016014,  Location: 0.54 MILE EAST OF MD 272 (Lat: 39.611853,  Lng: -75.938594),  Route carried "on" structure: US 40,  Year Built: 1939,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 14,332 (year 2012),  Truck Traffic: 12%,  Average Future Daily Traffic: 21,498 (year 2032),  Design Load: HS 20,  Features Intersected: NORTHEAST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.211,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100000070017013,  Location: 0.65 MILE EAST OF MD 272 (Lat: 39.611931,  Lng: -75.936844),  Route carried "on" structure: US 40,  Year Built: 1939,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 14,917 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 22,376 (year 2032),  Design Load: HS 20,  Features Intersected: LITTLE NORTHEAST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.391,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 64.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100000070017014,  Location: 0.65 MILE EAST OF MD 272 (Lat: 39.612192,  Lng: -75.936464),  Route carried "on" structure: US 40,  Year Built: 1939,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 14,332 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 21,498 (year 2032),  Design Load: HS 20,  Features Intersected: LITTLE NORTHEAST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.391,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 64.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10000007003401,  Location: 0.62 MILE NORTH OF MD 274 (Lat: 39.648939,  Lng: -75.955864),  Route carried "on" structure: State highway 272,  Year Built: 2001,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 10,462 (year 2009),  Truck Traffic: 11%,  Average Future Daily Traffic: 12,051 (year 2026),  Design Load: HS 25 or greater,  Features Intersected: NORTHEAST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.489,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10000007003501,  Location: 0.7 MILE NORTH OF US 40 (Lat: 39.617772,  Lng: -75.949850),  Route carried "on" structure: State highway 272,  Year Built: 1941,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 22,632 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 22,747 (year 2038),  Design Load: H 20,  Features Intersected: CSX TRANS.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.788,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.32m (27.30ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $614,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $675,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10000007003601,  Location: 0.32 MILE SOUTH OF US 40 (Lat: 39.604433,  Lng: -75.945161),  Route carried "on" structure: State highway 272,  Year Built: 2020,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 11,950 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 19,575 (year 2036),  Features Intersected: AMTRAK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.147,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.1m (134.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.33m (14.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $6,284,000,  Roadway Improvement Cost: $4,718,000,  Total Project Cost: $14,310,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10000007003701,  Location: 0.1 MILE NORTH OF MD 7C (Lat: 39.602372,  Lng: -75.943386),  Route carried "on" structure: State highway 272,  Year Built: 1945,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 6,302 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,334 (year 2038),  Design Load: H 20,  Features Intersected: NORTHEAST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.389,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $344,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10000007005402,  Location: 1.03 MILE SOUTH OF US 40 (Lat: 39.595181,  Lng: -75.941547),  Route carried "on" structure: State highway 272,  Year Built: 1987,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 7,412 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,450 (year 2038),  Design Load: HS 20,  Features Intersected: BR OF NORTH EAST RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.223,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 10000007006202,  Location: 0.41 MILE SOUTH OF MD 7C (Lat: 39.595592,  Lng: -75.940017),  Route carried "on" structure: State highway 272,  Year Built: 1968,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 8,302 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,344 (year 2038),  Design Load: HS 20,  Features Intersected: BR OF NORTHEAST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.005,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 200000CE001601,  Location: 0.55 MI W OF MD 274 (Lat: 39.643392,  Lng: -75.975347),  Route carried "on" structure: County highway 76,  Year Built: 2006,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,624 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,540 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: STONY RUN,  Facility Carried by Structure: THEODORE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 200000CE001701,  Location: 0.41 MI N OF US 40 (Lat: 39.617653,  Lng: -75.929956),  Route carried "on" structure: County highway 167,  Year Built: 2016,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 5,760 (year 2015),  Truck Traffic: 29%,  Average Future Daily Traffic: 6,430 (year 2037),  Features Intersected: LITTLE NORTHEAST CREEK,  Facility Carried by Structure: MECHANICS VALLEY R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 49.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 200000CE001801,  Location: 0.02 MI E OF STEVENSON RD (Lat: 39.632178,  Lng: -75.919336),  Route carried "on" structure: County highway 425,  Year Built: 2008,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 1,930 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,230 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: LITTLE NORTHEAST CREEK,  Facility Carried by Structure: STEVENSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 200000CE001901,  Location: 1.39 MILES NE OF MD 272 (Lat: 39.657414,  Lng: -75.932317),  Route carried "on" structure: County highway 411,  Year Built: 1994,  Status: Open,  Structure Length: 1.69m (5.54ft),  Average Daily Traffic: 1,550 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,820 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: LITTLE NORTHEAST CREEK,  Facility Carried by Structure: WARBURTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.237,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $7,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 200000CE002101,  Location: 0.01 MI N OF WHEATLEY RD (Lat: 39.684864,  Lng: -75.922050),  Route carried "on" structure: County highway 545,  Year Built: 2007,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 2,620 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,510 (year 2037),  Design Load: HS 20,  Features Intersected: LITTLE NORTHEAST CREEK,  Facility Carried by Structure: BLUE BALL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.489,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 66.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 200000CE004201,  Location: 1.58 MILES N OF MD 7 (Lat: 39.622608,  Lng: -75.927869),  Route carried "on" structure: County highway 167,  Year Built: 1975,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 4,330 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,190 (year 2037),  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: MECHANICS VALLEY R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.542,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 83.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 4.33m (14.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $216,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $238,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200000CE004401,  Location: 0.82 MI S OF UNION CHURCH (Lat: 39.628611,  Lng: -75.906397),  Route carried "on" structure: County highway 425,  Year Built: 2012,  Status: Open,  Structure Length: 5.65m (18.54ft),  Average Daily Traffic: 1,200 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,730 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: NOTTINGHAM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.319,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 200000CE005701,  Location: 0.71 MI N OF MD 274 (Lat: 39.663528,  Lng: -75.975064),  Route carried "on" structure: County highway 68,  Year Built: 2003,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 529 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 720 (year 2041),  Design Load: HS 20,  Features Intersected: NORTHEAST CREEK,  Facility Carried by Structure: KIRKS MILL LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.142,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 74.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 200000CE005901,  Location: 0.86 MI N OF MD 272 (Lat: 39.681300,  Lng: -75.951683),  Route carried "on" structure: County highway 69,  Year Built: 1992,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,280 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,090 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: WEST BRANCH,  Facility Carried by Structure: DR. MILLER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.384,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200000CE006001,  Location: 0.99 MI NE OF MD 272 (Lat: 39.668800,  Lng: -75.942117),  Route carried "on" structure: County highway 149,  Year Built: 1966,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 294 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 383 (year 2041),  Design Load: HS 20,  Features Intersected: WEST BRANCH,  Facility Carried by Structure: WHEATLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.593,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 200000CE006101,  Location: 2.48 MILES NE OF MD 272 (Lat: 39.683731,  Lng: -75.924350),  Route carried "on" structure: County highway 149,  Year Built: 1965,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 344 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 434 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: LITTLE NORTHEAST CREEK,  Facility Carried by Structure: WHEATLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.990,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 200000CE007101,  Location: 0.97 MI S OF THEODORE RD (Lat: 39.631572,  Lng: -75.970369),  Route carried "on" structure: County highway 94,  Year Built: 1950,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 190 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 220 (year 2037),  Features Intersected: STONY RUN,  Facility Carried by Structure: BAILIFF ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.561,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $19,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 200000CE007201,  Location: 0.47 MI W OF US 40 (Lat: 39.606731,  Lng: -75.958711),  Route carried "on" structure: County highway 125,  Year Built: 2017,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 110 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: STONY RUN,  Facility Carried by Structure: RAZOR STRAP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.756,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 200000CE009601,  Location: 0.42 MI S OF BARON ROAD (Lat: 39.624347,  Lng: -75.968869),  Route carried "on" structure: County highway 128,  Year Built: 1968,  Year Reconstructed: 2019,  Status: Not yet open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 600 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 800 (year 2035),  Design Load: HS 20,  Features Intersected: STONEY RUN,  Facility Carried by Structure: BETHEL CHURCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.352,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 84.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 200000CE009701,  Location: 0.16 MI N OF NAZARENE RD (Lat: 39.618597,  Lng: -75.959803),  Route carried "on" structure: County highway 126,  Year Built: 2015,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 490 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,330 (year 2037),  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: BARON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 200000CE009801,  Location: 0.50 MI N OF MARLEY RD (Lat: 39.634797,  Lng: -75.889689),  Route carried "on" structure: County highway 523,  Year Built: 1940,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 3.92m (12.86ft),  Average Daily Traffic: 780 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,070 (year 2038),  Design Load: HS 20,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: DEAVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.641,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.9m (52.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200000CE009901,  Location: 0.49 MI E OF MD 272 (Lat: 39.627294,  Lng: -75.944311),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 2.98m (9.78ft),  Average Daily Traffic: 1,270 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,600 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: NORTHEAST CREEK,  Facility Carried by Structure: LUMS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 62.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200000CE010101,  Location: 0.24 MI S OF US 40 (Lat: 39.608678,  Lng: -75.933478),  Route carried "on" structure: County highway 167,  Year Built: 1980,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 7,650 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,510 (year 2036),  Design Load: HS 20,  Features Intersected: AMTRAK,  Facility Carried by Structure: MECHANICS VALLEY R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 84.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.63m (28.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $801,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $881,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200000CEN-0101,  Location: 0.1 MI S OF MD 7 (Lat: 39.598897,  Lng: -75.951625),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Posted for load,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 528 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 590 (year 2037),  Design Load: HS 20,  Features Intersected: STONY RUN,  Facility Carried by Structure: NORTH EAST ISLES D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 300000CEX99002,  Location: Milepost M99.0 (Lat: 39.626753,  Lng: -75.976028),  Route carried "on" structure: Interstate 95,  Year Built: 1963,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 89,058 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 118,326 (year 2041),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 159.291,  Lanes on structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 45.1m (148.0ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 300000CEXA0001,  Location: Milepost M100.0 (Lat: 39.631800,  Lng: -75.956219),  Route carried "on" structure: State highway 272,  Year Built: 1999,  Status: Open,  Structure Length: 8.93m (29.30ft),  Average Daily Traffic: 23,120 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 27,550 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: I-95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.900,  Lanes on structure: 6,  Lanes under structure: 8,  Owner: State Toll Authority,  Approaching Roadway Width: 33.2m (108.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 44.2m (145.0ft),  Curb-To-Curb Width: 33.2m (108.9ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 300000CEXA0601,  Location: 9.4 MI N HAR-CEC CO LINE (Lat: 39.636589,  Lng: -75.947711),  Route carried "on" structure: Interstate 95,  Year Built: 1963,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 78,625 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 110,286 (year 2041),  Design Load: HS 20,  Features Intersected: NORTHEAST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.865,  Lanes on structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 45.1m (148.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 45.1m (148.0ft),  Out-to-Out Width: 46.2m (151.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 300000CEXA1101,  Location: Milepost M101.1 (Lat: 39.640519,  Lng: -75.939689),  Route carried "on" structure: County highway 160,  Year Built: 1963,  Status: Open,  Structure Length: 6.89m (22.60ft),  Average Daily Traffic: 2,486 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,094 (year 2041),  Design Load: H 20,  Features Intersected: I-95,  Facility Carried by Structure: BOUCHELLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.670,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 300000CEXA1501,  Location: 10.2 MI N HAR-CEC CO LINE (Lat: 39.643419,  Lng: -75.932539),  Route carried "on" structure: Interstate 95,  Year Built: 1963,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 78,625 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 110,286 (year 2041),  Design Load: HS 20,  Features Intersected: LITTLE NORTHEAST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 163.314,  Lanes on structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 45.1m (148.0ft),  Skew: 39 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 45.1m (148.0ft),  Out-to-Out Width: 46.2m (151.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 300000CEXA2701,  Location: Milepost M102.7 (Lat: 39.641850,  Lng: -75.911169),  Route carried "on" structure: County highway 410,  Year Built: 1964,  Status: Open,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 2,408 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,869 (year 2041),  Design Load: H 20,  Features Intersected: I-95,  Facility Carried by Structure: UNION CHURCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 165.244,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 300000CEXA3801,  Location: Milepost M103.8 (Lat: 39.643319,  Lng: -75.891222),  Route carried "on" structure: County highway 523,  Year Built: 1964,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 954 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,187 (year 2041),  Design Load: H 20,  Features Intersected: I-95,  Facility Carried by Structure: DEAVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 167.014,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss North East, Maryland (MD) on our hugely popular Maryland forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.