Bridge Statistics for Opp, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 42Number of bridges
  • 433ft / 132mTotal length
  • $51,103,000Total costs
  • 60,389Total average daily traffic
  • 4,937Total average daily truck traffic
  • 82,135Total future (year 2028) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Opp
  • No street view available for this location

New bridges in Opp, AL - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 21920-1929
  • 51930-1939
  • 51940-1949
  • 41950-1959
  • 91960-1969
  • 21980-1989
  • 21990-1999
  • 112000-2009
Reconstructed bridges in Opp, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 51970-1979
  • 31980-1989
  • 51990-1999
Average Bridge Daily Traffic in Opp, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.0%Excellent
  • 32.0%Very good
  • 16.0%Good
  • 28.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 30.8%Very good
  • 23.1%Good
  • 30.8%Satisfactory
  • 15.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 23.1%Very good
  • 7.7%Good
  • 34.6%Satisfactory
  • 34.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 23.8%Very good
  • 33.3%Good
  • 31.0%Satisfactory
  • 11.9%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 12.5%Very good
  • 37.5%Good
  • 37.5%Satisfactory
  • 12.5%Fair
Find on map >>   Show street view

Structure Number: 19456,  Location: 235' FROM US84 MP 145.2 (Lat: 31.268653,  Lng: -86.309117),  Route carried "on" structure: County highway 77,  Year Built: 2003,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 150 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 200 (year 2031),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.27m (4.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $409,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $450,000 ( Estimate for 2022)