Bridge Statistics for Parkersburg, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 86Number of bridges
  • 1,831ft / 558mTotal length
  • $185,572,000Total costs
  • 778,547Total average daily traffic
  • 61,105Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Parkersburg
  • No street view available for this location

New bridges in Parkersburg, WV - historical statistics
  • New bridges - historical statistics
  • 41900-1909
  • 21920-1929
  • 31930-1939
  • 31940-1949
  • 21950-1959
  • 71960-1969
  • 81970-1979
  • 51980-1989
  • 51990-1999
  • 422000-2009
  • 52010-2019
Reconstructed bridges in Parkersburg, WV - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 21990-1999
Average Bridge Daily Traffic in Parkersburg, WV
Average Bridge Truck Traffic in Parkersburg, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 70.2%Good
  • 2.1%Satisfactory
  • 25.5%Fair
  • 2.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 48.9%Good
  • 21.3%Satisfactory
  • 14.9%Fair
  • 14.9%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 46.8%Good
  • 23.4%Satisfactory
  • 12.8%Fair
  • 17.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.7%Very good
  • 74.1%Good
  • 14.8%Satisfactory
  • 7.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 54A037,  Location: 0.34 MILE NORTH OF WV 95 (Lat: 39.260289,  Lng: -81.556361),  Route carried "on" structure: State highway 14,  Year Built: 1935,  Year Reconstructed: 1998,  Status: Posted for load,  Structure Length: 27.59m (90.52ft),  Average Daily Traffic: 27,421 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 34,002 (year 2035),  Design Load: H 20,  Features Intersected: Little Kanawha River
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 21.276,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Navigation Control: Yes ( Vertical Clearance: 11.9m (39.0ft), Horizontal Clearance: 102.7m (336.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 13,  Length of Maximum Span: 106.7m (350.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 27.58m (90.49ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2021,  Underwater Inspection Date: August 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $36,000,000,  Roadway Improvement Cost: $9,000,000,  Total Project Cost: $45,000,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A087,  Location: 0.87 M NORTH OF CR 21/17 (Lat: 39.226761,  Lng: -81.576681),  Route carried "on" structure: County highway 38,  Year Built: 1991,  Status: Open,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 1,500 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,560 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BRANCH OF NEAL RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.344,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $650,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $750,000 ( Estimate for 2016),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A088,  Location: 0.40 MILE SOUTH OF CR 32 (Lat: 39.233581,  Lng: -81.574481),  Route carried "on" structure: County highway 38,  Year Built: 1991,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 1,500 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,560 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BRANCH OF NEAL RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.148,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $650,000 ( Estimate for 2016),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A089,  Location: 0.16 MI W OF CR 21/17 (Lat: 39.202119,  Lng: -81.562281),  Route carried "on" structure: County highway 385,  Year Built: 1924,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 150 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 165 (year 2038),  Features Intersected: BADGLEY FORK,  Facility Carried by Structure: COUNTY ROUTE 38/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.364,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $450,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 54A099,  Location: 0.05 MILE W OF CR 50/1 (Lat: 39.245700,  Lng: -81.508731),  Route carried "on" structure: County highway 471,  Year Built: 1950,  Year Reconstructed: 1982,  Status: Posted for load,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 298 (year 2039),  Features Intersected: DRY RUN,  Facility Carried by Structure: COUNTY ROUTE 47/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $350,000,  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 54A102,  Location: 0.12 MI NORTH OF WV 47 (Lat: 39.236711,  Lng: -81.510550),  Route carried "on" structure: County highway 4720,  Year Built: 1962,  Status: Open,  Structure Length: 1.53m (5.02ft),  Average Daily Traffic: 20 (year 2018),  Average Future Daily Traffic: 25 (year 2038),  Features Intersected: MILL RUN,  Facility Carried by Structure: CR 47/20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.8m (48.6ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $450,000,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 54A103,  Location: 0.49 M WEST OF WV 68 S (Lat: 39.270469,  Lng: -81.565119),  Route carried "on" structure: State highway 618,  Year Built: 1980,  Status: Posted for load-capacity,  Structure Length: 77.13m (253.05ft),  Average Daily Traffic: 15,700 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 20,586 (year 2035),  Design Load: HS 20,  Features Intersected: Ohio River, WV 14, & CSX
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.016,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 23.5m (77.1ft), Horizontal Clearance: 223.1m (732.0ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 8,  Length of Maximum Span: 228.6m (750.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.1m (75.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 76.63m (251.41ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2021,  Underwater Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $11,000,000,  Total Project Cost: $11,000,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A105,  Location: 0.14 MI. SOUTH OF CR 16 (Lat: 39.285519,  Lng: -81.510539),  Route carried "on" structure: County highway 502,  Year Built: 1990,  Status: Open,  Structure Length: 2.03m (6.66ft),  Average Daily Traffic: 2,400 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,497 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: WORTHINGTON CREEK,  Facility Carried by Structure: COUNTY ROUTE 50/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.929,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $200,000 ( Estimate for 2015),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A106,  Location: 0.26 MI SOUTH OF CR 18/5 (Lat: 39.264419,  Lng: -81.462619),  Route carried "on" structure: County highway 505,  Year Built: 1976,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 1,000 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,100 (year 2038),  Design Load: HS 20,  Features Intersected: GILLESPIE RUN,  Facility Carried by Structure: CR 50/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.835,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $500,000 ( Estimate for 2015),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 54A133,  Location: 2.50 MI. N. WV. 47 (Lat: 39.267550,  Lng: -81.499261),  Route carried "on" structure: Interstate 77,  Year Built: 1963,  Status: Open,  Structure Length: 6.26m (20.54ft),  Average Daily Traffic: 11,900 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 17,017 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: US 50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 283.920,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 28.1m (92.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.25m (20.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $4,500,000,  Roadway Improvement Cost: $1,500,000,  Total Project Cost: $6,000,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 54A134,  Location: 2.50 MI. N. OF WV. 47 (Lat: 39.267550,  Lng: -81.499511),  Route carried "on" structure: Interstate 77,  Year Built: 1963,  Status: Open,  Structure Length: 6.26m (20.54ft),  Average Daily Traffic: 11,900 (year 2019),  Truck Traffic: 25%,  Average Future Daily Traffic: 17,017 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: US 50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 283.920,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 28.1m (92.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.25m (20.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 54A135,  Location: 1.52 MI. N. OF US 50 (Lat: 39.288150,  Lng: -81.496481),  Route carried "on" structure: Interstate 77,  Year Built: 1966,  Status: Open,  Structure Length: 8.96m (29.40ft),  Average Daily Traffic: 13,650 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 18,018 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: Worthington Crk & CR 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 286.367,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.0m (88.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.96m (29.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,000,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,001,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 54A136,  Location: 1.52 MI.N. OF US. 50 (Lat: 39.288250,  Lng: -81.496711),  Route carried "on" structure: Interstate 77,  Year Built: 1966,  Status: Open,  Structure Length: 9.23m (30.28ft),  Average Daily Traffic: 13,650 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 18,018 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: Worthington Crk & CR 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 286.367,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 26.6m (87.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.24m (30.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,000,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,001,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 54A143,  Location: 0.09 MI. S. OF CR 4 (Lat: 39.293700,  Lng: -81.546261),  Route carried "on" structure: State highway 14,  Year Built: 1945,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 37,900 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 39,795 (year 2039),  Features Intersected: BRANCH OF POND RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.701,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $500,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 54A15,  Location: 0.04 MI. WEST OF US 50 (Lat: 39.266769,  Lng: -81.512331),  Route carried "on" structure: State highway 618,  Year Built: 1938,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 15,200 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,808 (year 2038),  Features Intersected: WORTHINGTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.520,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: September 2019,  Bridge Improvement Cost: $1,200,000,  Total Project Cost: $1,200,000 ( Estimate for 2016)
Find on map >>   Show street view

Structure Number: 54A157,  Location: 0.27 M EAST OF CR 2/14 (Lat: 39.246739,  Lng: -81.576061),  Route carried "on" structure: State highway 95,  Year Built: 1947,  Status: Posted for load,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 11,400 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,856 (year 2038),  Design Load: HS 15,  Features Intersected: CR 32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.267,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $400,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 54A158,  Location: 0.31 MILE EAST OF CR 32 (Lat: 39.247189,  Lng: -81.570439),  Route carried "on" structure: State highway 95,  Year Built: 1985,  Status: Open,  Structure Length: 1.84m (6.04ft),  Average Daily Traffic: 11,400 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,856 (year 2038),  Design Load: HS 20,  Features Intersected: NEAL RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.088,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 54A16,  Location: 0.15 M NORTH OF CR 9/25 (Lat: 39.265231,  Lng: -81.565389),  Route carried "on" structure: State highway 68,  Year Built: 1971,  Status: Open,  Structure Length: 11.38m (37.34ft),  Average Daily Traffic: 20,100 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 24,120 (year 2038),  Design Load: HS 20,  Features Intersected: 2nd Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.970,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 20.8m (68.2ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.37m (37.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $110,000,  Total Project Cost: $1,100,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 54A163,  Location: 0.11 M NORTH OF WV 68 (Lat: 39.265450,  Lng: -81.565611),  Route carried "on" structure: Ramp State highway 68,  Year Built: 1971,  Status: Open,  Structure Length: 11.28m (37.01ft),  Average Daily Traffic: 9,500 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,400 (year 2038),  Design Load: HS 20,  Features Intersected: 2nd Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.832,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 19.9m (65.3ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,100,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 54A172,  Location: 0.21 MILE WEST OF WV 95 (Lat: 39.258939,  Lng: -81.546189),  Route carried "on" structure: Alternate State highway 14,  Year Built: 1996,  Status: Open,  Structure Length: 24.03m (78.84ft),  Average Daily Traffic: 6,800 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,072 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: LITTLE KANAWHA RIVER
Minimum Vertical Clearance: 7.95m (26.08ft),  Kilometerpoint: 2.511,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Navigation Control: Yes ( Vertical Clearance: 13.4m (44.0ft), Horizontal Clearance: 118.6m (389.1ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 121.9m (399.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.05m (78.90ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Bridge Improvement Cost: $2,500,000,  Total Project Cost: $2,500,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A19,  Location: 0.56 MILE EAST OF US 50 (Lat: 39.259319,  Lng: -81.533531),  Route carried "on" structure: State highway 47,  Year Built: 2002,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 7,400 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,696 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: WORTHINGTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.2m (112.2ft),  Curb-To-Curb Width: 20.9m (68.6ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.96m (26.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,500,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,600,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A191,  Location: 0.20 MILE NORTH OF US 50 (Lat: 39.263339,  Lng: -81.573231),  Route carried "on" structure: Ramp State highway 68,  Year Built: 2003,  Status: Open,  Structure Length: 7.90m (25.92ft),  Average Daily Traffic: 8,450 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,140 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: US 50 W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.89m (25.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $500,000,  Total Project Cost: $500,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A192,  Location: 0.01 MI EAST OF CR 50/44 (Lat: 39.267739,  Lng: -81.515519),  Route carried "on" structure: County highway 5023,  Year Built: 2001,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 20 (year 2016),  Average Future Daily Traffic: 25 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: WORTHINGTON CREEK,  Facility Carried by Structure: COUNTY ROUTE 50/23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $1,500,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A203,  Location: 0.04 MILE N OF CR 9/28 (Lat: 39.257561,  Lng: -81.580961),  Route carried "on" structure: County highway 9,  Year Built: 2003,  Status: Open,  Structure Length: 6.80m (22.31ft),  Average Daily Traffic: 20 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 22 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: US 50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.706,  Lanes on structure: 5,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 36.3m (119.1ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 24.5m (80.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.80m (22.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $850,000,  Total Project Cost: $10,000,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A204,  Location: 0.07 MILE SOUTH OF CR 30 (Lat: 39.258900,  Lng: -81.581969),  Route carried "on" structure: County highway 9,  Year Built: 2003,  Status: Open,  Structure Length: 7.67m (25.16ft),  Average Daily Traffic: 1,363 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,690 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: COUNTY ROUTE 9/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.883,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 24.5m (80.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.65m (25.10ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2018,  Bridge Improvement Cost: $1,200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,300,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A205,  Location: 0.30 MILE NORTH OF US 50 (Lat: 39.264350,  Lng: -81.567439),  Route carried "on" structure: State highway 68,  Year Built: 1971,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 36.78m (120.67ft),  Average Daily Traffic: 7,400 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,400 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: US 50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.520,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 34 degrees,  Navigation Control: Yes ( Vertical Clearance: 14.3m (46.9ft), Horizontal Clearance: 93.0m (305.1ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 7,  Length of Maximum Span: 100.6m (330.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 36.79m (120.70ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Underwater Inspection Date: September 2018,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $50,000,000,  Roadway Improvement Cost: $9,000,000,  Total Project Cost: $59,000,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A206,  Location: 0.54 MILE WEST OF WV 14 (Lat: 39.259150,  Lng: -81.561100),  Route carried "on" structure: US 50,  Year Built: 2003,  Status: Open,  Structure Length: 9.11m (29.89ft),  Average Daily Traffic: 6,600 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 6,600 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: NEAL RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.042,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $350,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A207,  Location: 0.54 MILE WEST OF WV 14 (Lat: 39.259381,  Lng: -81.561169),  Route carried "on" structure: US 50,  Year Built: 2003,  Status: Open,  Structure Length: 9.11m (29.89ft),  Average Daily Traffic: 6,600 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 6,600 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: NEAL RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.042,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.9m (52.2ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $350,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A208,  Location: 1.25 MILE WEST OF WV 14 (Lat: 39.257911,  Lng: -81.555419),  Route carried "on" structure: US 50,  Year Built: 2005,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 5,900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,900 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: DIVISION STREET/ WV 14
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.541,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 35.4m (116.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.35m (27.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,100,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A209,  Location: 1.25 MILE WEST OF WV 47 (Lat: 39.258161,  Lng: -81.555600),  Route carried "on" structure: US 50,  Year Built: 2005,  Status: Open,  Structure Length: 8.35m (27.40ft),  Average Daily Traffic: 5,900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,900 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: WV 14/ DIVISION STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.541,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 35.4m (116.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.35m (27.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $1,300,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A21,  Location: 0.45 MILE EAST OF WV 14 (Lat: 39.256261,  Lng: -81.548019),  Route carried "on" structure: US 50,  Year Built: 2004,  Status: Open,  Structure Length: 5.76m (18.90ft),  Average Daily Traffic: 5,848 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,848 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: FAIRFAX STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.249,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.76m (18.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $4,900,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $5,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A211,  Location: 0.45 MILE EAST OF WV 14 (Lat: 39.256481,  Lng: -81.548011),  Route carried "on" structure: US 50,  Year Built: 2004,  Status: Open,  Structure Length: 5.74m (18.83ft),  Average Daily Traffic: 5,848 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,848 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: FAIRFAX STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.249,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 19.9m (65.3ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.76m (18.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $4,900,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $5,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A212,  Location: 0.50 MILE EAST OF WV 14 (Lat: 39.255700,  Lng: -81.546761),  Route carried "on" structure: US 50,  Year Built: 2003,  Status: Open,  Structure Length: 6.00m (19.69ft),  Average Daily Traffic: 5,848 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,848 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: WV14 A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.362,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $850,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $900,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A213,  Location: 0.50 MILE EAST OF WV 14 (Lat: 39.255961,  Lng: -81.546761),  Route carried "on" structure: US 50,  Year Built: 2003,  Status: Open,  Structure Length: 6.00m (19.69ft),  Average Daily Traffic: 5,848 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,848 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: WV14 A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.362,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $850,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A214,  Location: 0.47 MILE WEST OF WV 47 (Lat: 39.253961,  Lng: -81.541611),  Route carried "on" structure: US 50,  Year Built: 2004,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 5,498 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,498 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Buckeye Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.877,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $950,000,  Total Project Cost: $950,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A215,  Location: 0.47 MILE WEST OF WV 47 (Lat: 39.254139,  Lng: -81.541511),  Route carried "on" structure: US 50,  Year Built: 2004,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 5,498 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,498 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Buckeye Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.877,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $900,000,  Total Project Cost: $900,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A216,  Location: 0.02 MILE WEST OF WV 47 (Lat: 39.255481,  Lng: -81.534989),  Route carried "on" structure: US 50,  Year Built: 2004,  Status: Open,  Structure Length: 39.32m (129.00ft),  Average Daily Traffic: 8,600 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,600 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: L KANAW R L KA RR CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.295,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Navigation Control: Yes ( Vertical Clearance: 13.1m (43.0ft), Horizontal Clearance: 91.4m (299.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 106.7m (350.1ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 39.32m (129.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,200,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $1,320,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing