Bridge Statistics for Pittsfield, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 52Number of bridges
  • 338ft / 103mTotal length
  • $71,155,000Total costs
  • 433,397Total average daily traffic
  • 27,670Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pittsfield
  • No street view available for this location

New bridges in Pittsfield, MA - historical statistics
  • New bridges - historical statistics
  • 2Before 1900
  • 61900-1909
  • 41910-1919
  • 11920-1929
  • 81930-1939
  • 41940-1949
  • 11950-1959
  • 21960-1969
  • 51970-1979
  • 31980-1989
  • 91990-1999
  • 22000-2009
  • 32010-2019
  • 22020-2022
Reconstructed bridges in Pittsfield, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 31930-1939
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 41980-1989
  • 41990-1999
  • 12000-2009
Average Bridge Daily Traffic in Pittsfield, MA
Average Bridge Truck Traffic in Pittsfield, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.5%Excellent
  • 9.1%Very good
  • 34.1%Good
  • 27.3%Satisfactory
  • 22.7%Fair
  • 2.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.3%Excellent
  • 6.4%Very good
  • 29.8%Good
  • 23.4%Satisfactory
  • 27.7%Fair
  • 8.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.3%Excellent
  • 4.3%Very good
  • 42.6%Good
  • 25.5%Satisfactory
  • 19.1%Fair
  • 4.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.4%Very good
  • 60.5%Good
  • 7.9%Satisfactory
  • 10.5%Fair
  • 2.6%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 50.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: L07001018MUNNBI,  Location: 1.5 MI. E. OF ROUTES 7&20 (Lat: 42.393889,  Lng: -73.240556),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 3.30m (10.83ft),  Average Daily Traffic: 1,429 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,843 (year 2032),  Design Load: H 20,  Features Intersected: WATER HOUSATONIC RIVER,  Facility Carried by Structure: HWY NEW LENOX RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,764,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $2,647,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: L0700605MMUNNBI,  Location: .4 MI S. OF NEW LENOX RD (Lat: 42.387817,  Lng: -73.237881),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 129 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 158 (year 2032),  Design Load: H 15,  Features Intersected: WATER ROARING BROOK,  Facility Carried by Structure: HWY RORING BK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 21.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $1,245,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,868,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L07013BU9MUNNBI,  Location: .5 MI E OF E NEW LENOX RD (Lat: 42.391611,  Lng: -73.226500),  Route carried "on" structure: City street ,  Year Built: 2016,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 120 (year 2014),  Truck Traffic: 2%,  Design Load: HL 93,  Features Intersected: WATER MILL BROOK,  Facility Carried by Structure: HWY NEW LENOX RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: P1000101WMUNNBI,  Location: .5 MI S OF WILLIAM ST (Lat: 42.430017,  Lng: -73.238714),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 13,920 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,845 (year 2032),  Design Load: H 20,  Features Intersected: WATER HOUSATONIC RIVER,  Facility Carried by Structure: HWY HOLMES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.136,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.5m (113.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,222,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,834,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P100020DYDOT634,  Location: 1.4 MI N OF LENX TL 83.80 (Lat: 42.419444,  Lng: -73.246389),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Temporarily open,  Structure Length: 2.30m (7.55ft),  Average Daily Traffic: 11,429 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,741 (year 2033),  Design Load: H 20,  Features Intersected: RR HRR,  Facility Carried by Structure: HWY HOLMES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.5m (70.5ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 47.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $1,188,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,783,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P100030E0DOT634,  Location: @ GAMWELL AVE 85.00 (Lat: 42.433619,  Lng: -73.257992),  Route carried "on" structure: US 7,  Year Built: 1900,  Year Reconstructed: 1938,  Status: Open,  Structure Length: 1.73m (5.68ft),  Average Daily Traffic: 21,457 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 33,323 (year 2032),  Design Load: H 20,  Features Intersected: RR HRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.340,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 49.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,146,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,720,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: P100080DXDOT634,  Location: AT MERRILL/EAST ST 148.18 (Lat: 42.455178,  Lng: -73.213250),  Route carried "on" structure: State highway ,  Year Built: 1886,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 15,700 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 27,006 (year 2031),  Design Load: HS 20,  Features Intersected: RR CSX,  Facility Carried by Structure: HWY JUNCTION RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.4m (83.3ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 62.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $535,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $803,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P10010BK9MUNNBI,  Location: 0.1M N OF EAST RR149.67 (Lat: 42.453597,  Lng: -73.234369),  Route carried "on" structure: City street ,  Year Built: 2016,  Status: Open,  Structure Length: 3.28m (10.76ft),  Average Daily Traffic: 2,215 (year 2018),  Truck Traffic: 7%,  Design Load: HL 93,  Features Intersected: RR CSX,  Facility Carried by Structure: HWY WOODLAWN AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.3m (102.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P10012AWBDOT634,  Location: INT ADAMS & PLSNT 149.93 (Lat: 42.452500,  Lng: -73.246944),  Route carried "on" structure: State highway ,  Year Built: 1999,  Status: Open,  Structure Length: 1.72m (5.64ft),  Average Daily Traffic: 5,000 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,422 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RR CSX,  Facility Carried by Structure: HWY SECOND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.6m (54.5ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $408,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $613,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P100130DUDOT634,  Location: S OF MELVLLE ST 150.09 (Lat: 42.452042,  Lng: -73.250122),  Route carried "on" structure: US 7,  Year Built: 1900,  Year Reconstructed: 1948,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 29,800 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 23,374 (year 2032),  Design Load: H 20,  Features Intersected: RR CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.532,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,292,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $1,939,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: P100140DTDOT634,  Location: INT NORTH & COLMBS 150.25 (Lat: 42.451550,  Lng: -73.253017),  Route carried "on" structure: US 7,  Year Built: 1983,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 20,000 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 25,111 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: RR CSX,  Facility Carried by Structure: HWY NORTH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 4.4m (14.4ft),  Right: 5.6m (18.4ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 33.2m (108.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $891,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $1,337,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P100170DRDOT634,  Location: 0.1 MI N OF US 20 151.06 (Lat: 42.446111,  Lng: -73.267222),  Route carried "on" structure: State highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.79m (5.87ft),  Average Daily Traffic: 6,827 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,476 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RR CSX,  Facility Carried by Structure: HWY S MERRIAM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $611,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $917,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P100190DQDOT634,  Location: 0.3 MI N OF US 20 152.32 (Lat: 42.443847,  Lng: -73.291264),  Route carried "on" structure: State highway ,  Year Built: 1909,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 2.22m (7.28ft),  Average Daily Traffic: 1,600 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,579 (year 2032),  Design Load: HS 20,  Features Intersected: RR CSX,  Facility Carried by Structure: HWY GALE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.3m (30.5ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 75.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,345,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,018,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P100210E1DOT634,  Location: W OF CLOVERDALE ST 154.07 (Lat: 42.431353,  Lng: -73.320131),  Route carried "on" structure: US 20,  Year Built: 1933,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 18,000 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,687 (year 2033),  Features Intersected: RR CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.357,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 20.6m (67.6ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,479,000,  Roadway Improvement Cost: $348,000,  Total Project Cost: $5,219,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: P100220E2DOT634,  Location: 700' W OF CRANE AV RR .92 (Lat: 42.466153,  Lng: -73.207450),  Route carried "on" structure: City street ,  Year Built: 1845,  Year Reconstructed: 1936,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 26,400 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 20,847 (year 2031),  Features Intersected: RR HRR,  Facility Carried by Structure: HWY DALTON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.2m (56.4ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 81.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,344,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,017,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: P1002301RMUNNBI,  Location: .7 MI NW OF HOLMES RD (Lat: 42.436556,  Lng: -73.247828),  Route carried "on" structure: City street ,  Year Built: 1936,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 3,400 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,948 (year 2032),  Design Load: HS 20,  Features Intersected: WATER E BR HOUSATONIC R,  Facility Carried by Structure: HWY POMEROY AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,094,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P1002401NMUNNBI,  Location: .1 MI NW OF HOLMES RD (Lat: 42.429997,  Lng: -73.241003),  Route carried "on" structure: City street ,  Year Built: 1949,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 2,500 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,948 (year 2032),  Design Load: H 20,  Features Intersected: WATER HOUSATONIC RIVER,  Facility Carried by Structure: HWY POMEROY AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 9.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,603,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $2,405,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: P1002501XMUNNBI,  Location: .6 MI W OF HOLMES RD (Lat: 42.440528,  Lng: -73.248317),  Route carried "on" structure: City street ,  Year Built: 1928,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 2.15m (7.05ft),  Average Daily Traffic: 2,800 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,738 (year 2032),  Design Load: HS 20,  Features Intersected: WATER E BR HOUSATONIC R,  Facility Carried by Structure: HWY DAWES AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.4m (63.6ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 63.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $747,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $1,121,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P1002601YMUNNBI,  Location: 700' S. OF INT. W/ RTE 9 (Lat: 42.445131,  Lng: -73.243989),  Route carried "on" structure: City street ,  Year Built: 1911,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 16,642 (year 2012),  Truck Traffic: 15%,  Average Future Daily Traffic: 21,478 (year 2032),  Features Intersected: WATER E BR HOUSATONIC R,  Facility Carried by Structure: HWY ELM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 2.9m (9.5ft),  Right: 2.9m (9.5ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $1,396,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $2,095,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: P10027024MUNNBI,  Location: .1MI SE OF EAST ST (RT 9) (Lat: 42.448000,  Lng: -73.237717),  Route carried "on" structure: City street ,  Year Built: 1913,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 2.36m (7.74ft),  Average Daily Traffic: 3,600 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,685 (year 2032),  Design Load: HS 20,  Features Intersected: WATER E BR HOUSATONIC R,  Facility Carried by Structure: HWY LYMAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.7m (74.5ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,245,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,868,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P1003101UMUNNBI,  Location: AT INT W/ ST ROUTES 8 & 9 (Lat: 42.469483,  Lng: -73.196625),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 42,207 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 49,590 (year 2032),  Design Load: HS 20,  Features Intersected: WATER E BR HOUSATONIC R,  Facility Carried by Structure: HWY HUBBARD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.9m (104.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 22.2m (72.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,965,000,  Roadway Improvement Cost: $297,000,  Total Project Cost: $4,448,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P100320B0DOTNBI,  Location: 600'S OF INT W/ CROFUT ST (Lat: 42.436569,  Lng: -73.257242),  Route carried "on" structure: US 7,  Year Built: 1900,  Year Reconstructed: 1937,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 23,286 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 35,060 (year 2032),  Design Load: H 20,  Features Intersected: WATER W BR HOUSATONIC R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.667,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.3m (63.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,337,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $2,006,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P100330B1DOTNBI,  Location: AT MILL ST (Lat: 42.443853,  Lng: -73.260889),  Route carried "on" structure: US 20,  Year Built: 1947,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 25,200 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 24,479 (year 2031),  Design Load: H 20,  Features Intersected: WATER W BR HOUSATONIC R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.651,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 61.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $379,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $569,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P10034073MUNNBI,  Location: 900' N. OF INT. W/ RTE 20 (Lat: 42.446458,  Lng: -73.263094),  Route carried "on" structure: City street ,  Year Built: 1907,  Status: Posted for load,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 129 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 158 (year 2032),  Features Intersected: WATER W BR HOUSATONIC R,  Facility Carried by Structure: HWY MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Superstructure: Fair,  Substructure: Serious,  Channel: Serious,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 6 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: May 2021,  Underwater Inspection Date: December 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $628,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $943,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: P10035022MUNNBI,  Location: BTW S JOHN ST & DEWEY AVE (Lat: 42.449944,  Lng: -73.263306),  Route carried "on" structure: City street ,  Year Built: 1904,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 10,571 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,160 (year 2032),  Features Intersected: WATER W BR HOUSATONIC R,  Facility Carried by Structure: HWY WEST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: November 2021,  Underwater Inspection Date: December 2020,  Bridge Improvement Cost: $811,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,217,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: P10037AGEMUNNBI,  Location: AT DEWEY AVE. (Lat: 42.452703,  Lng: -73.261261),  Route carried "on" structure: City street ,  Year Built: 1996,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 1,400 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,211 (year 2031),  Design Load: HS 20,  Features Intersected: WATER W BR HOUSATONIC R,  Facility Carried by Structure: HWY COLUMBUS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.7m (64.6ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $654,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $982,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P1003801PMUNNBI,  Location: AT INT. OF JOHN ST (Lat: 42.456853,  Lng: -73.260789),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 7,888 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,160 (year 2032),  Design Load: HS 15,  Features Intersected: WATER W BR HOUSATONIC R,  Facility Carried by Structure: HWY LINDEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,012,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,519,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P100390A4DOTNBI,  Location: 2.3 MI S OF LANESBORO TL (Lat: 42.464328,  Lng: -73.252875),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 1.73m (5.68ft),  Average Daily Traffic: 10,214 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,845 (year 2032),  Design Load: H 20,  Features Intersected: WATER W BR HOUSATONIC R,  Facility Carried by Structure: HWY WAHCONAH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,436,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $2,155,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: P10040025MUNNBI,  Location: AT WBR OF HOUSATONIC RIV (Lat: 42.466536,  Lng: -73.251889),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 2,845 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,159 (year 2032),  Design Load: HS 20,  Features Intersected: WATER W BR HOUSATONIC R,  Facility Carried by Structure: HWY PONTOOSUC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Channel: Good,  Operating Rating: 64.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $693,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,040,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P100410A5DOTNBI,  Location: AT TACONIC PARK DR INT (Lat: 42.474192,  Lng: -73.246119),  Route carried "on" structure: City street ,  Year Built: 1951,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 12,155 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 17,530 (year 2032),  Design Load: H 20,  Features Intersected: WATER W BR HOUSATONIC R,  Facility Carried by Structure: HWY WAHCONAH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,655,000,  Roadway Improvement Cost: $166,000,  Total Project Cost: $2,483,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: P10042B5TMUNNBI,  Location: .2 MI WEST OF ROUTE 7 (Lat: 42.479250,  Lng: -73.248444),  Route carried "on" structure: City street ,  Year Built: 2020,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 1,034 (year 2018),  Truck Traffic: 6%,  Design Load: HL 93,  Features Intersected: WATER W BR HOUSATONIC R,  Facility Carried by Structure: HWY NEW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P1004401MMUNNBI,  Location: JUST S OF POTOOSUC LAKE (Lat: 42.483944,  Lng: -73.246353),  Route carried "on" structure: City street ,  Year Built: 1996,  Status: Open,  Structure Length: 1.82m (5.97ft),  Average Daily Traffic: 6,078 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,265 (year 2032),  Design Load: HS 20,  Features Intersected: WATER W BR HOUSATONIC R,  Facility Carried by Structure: HWY HANCOCK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $645,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $968,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P10047023MUNNBI,  Location: .3 MI W OF RTE 7 (Lat: 42.469614,  Lng: -73.256583),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 3,100 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,896 (year 2032),  Design Load: HS 20,  Features Intersected: WATER ONOTA BROOK,  Facility Carried by Structure: HWY PECKS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.4m (24.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $357,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $536,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P100498UVMUNNBI,  Location: 500' S PECKS ROAD (Lat: 42.476103,  Lng: -73.269131),  Route carried "on" structure: City street ,  Year Built: 2020,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 388 (year 2018),  Truck Traffic: 6%,  Design Load: HL 93,  Features Intersected: WATER ONOTA LAKE,  Facility Carried by Structure: HWY LAKEWAY DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P10050020MUNNBI,  Location: .25 MI SW OF RTE 20 (Lat: 42.440275,  Lng: -73.272519),  Route carried "on" structure: City street ,  Year Built: 1946,  Status: Temporarily open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 5,571 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,581 (year 2032),  Design Load: H 20,  Features Intersected: WATER SW BR HOUSATONIC R,  Facility Carried by Structure: HWY BARKER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.122,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 14.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $721,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $1,082,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Pittsfield, Massachusetts (MA) on our hugely popular Massachusetts forum.