Bridge Statistics for Richmond Heights, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 64Number of bridges
  • 525ft / 160mTotal length
  • $1,561,000Total costs
  • 2,788,031Total average daily traffic
  • 319,129Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Richmond Heights
  • No street view available for this location

New bridges in Richmond Heights, MO - historical statistics
  • New bridges - historical statistics
  • 21950-1959
  • 11960-1969
  • 31970-1979
  • 11980-1989
  • 11990-1999
  • 542000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Richmond Heights, MO
Average Bridge Truck Traffic in Richmond Heights, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.5%Excellent
  • 4.5%Very good
  • 54.5%Good
  • 27.3%Satisfactory
  • 9.1%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.5%Excellent
  • 13.6%Very good
  • 68.2%Good
  • 4.5%Satisfactory
  • 9.1%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.5%Excellent
  • 27.3%Very good
  • 50.0%Good
  • 18.2%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 36.4%Excellent
  • 9.1%Very good
  • 27.3%Good
  • 18.2%Satisfactory
  • 9.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 16.7%Satisfactory
  • 33.3%Fair
  • 16.7%Poor
Find on map >>   Show street view

Structure Number: 32264,  Location: S 21 T 45 N R 6 E (Lat: 38.630117,  Lng: -90.343822),  Route carried "under" structure: Interstate 170,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 36,023 (year 2021),  Truck Traffic: 4%,  Features Intersected: IS 170,  Facility Carried by Structure: RP HANLEY DR TO IS
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 17.801,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 32264,  Location: S 21 T 45 N R 6 E (Lat: 38.630117,  Lng: -90.343822),  Route carried "under" structure: Interstate 170,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 41,344 (year 2021),  Truck Traffic: 6%,  Features Intersected: IS 170,  Facility Carried by Structure: RP HANLEY DR TO IS
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.116,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 32265,  Location: S 21 T 45 N R 6 E (Lat: 38.629708,  Lng: -90.343731),  Route carried "under" structure: Interstate 170,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 41,344 (year 2021),  Truck Traffic: 6%,  Features Intersected: IS 170,  Facility Carried by Structure: IS 64 E
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.069,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 28.2m (92.5ft)

Find on map >>   Show street view

Structure Number: 32265,  Location: S 21 T 45 N R 6 E (Lat: 38.629708,  Lng: -90.343731),  Route carried "under" structure: Interstate 170,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 36,023 (year 2021),  Truck Traffic: 4%,  Features Intersected: IS 170,  Facility Carried by Structure: IS 64 E
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 17.848,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 28.2m (92.5ft)

Find on map >>   Show street view

Structure Number: 32267,  Location: S 22 T 45 N R 6 E (Lat: 38.629322,  Lng: -90.323331),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 948 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST CLAYTONIA TER,  Facility Carried by Structure: IS 64 E
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.698,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.4m (50.5ft)

Find on map >>   Show street view

Structure Number: 3227,  Location: S 21 T 45 N R 6 E (Lat: 38.629867,  Lng: -90.346208),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 37,774 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST S BRENTWOOD BLVD,  Facility Carried by Structure: IS 64 E
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 2.372,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.7m (146.7ft)